WEST WITS MINING
SOUTH AFRICA | NEAR-TERM GOLD PRODUCER | ASX:WWI
Gold Coast Investment Showcase
June 2025
ASX:WWI
COPYRIGHT ©2025 ALL RIGHTS RESERVED
Qala Shallows, Witwatersrand Basin Project, Gauteng
Mining District, Johannesburg, South Africa
DISCLAIMER
FORWARD-LOOKING STATEMENTS
This presentation includes “forward-looking statements” as that term within the meaning of securities laws of
applicable jurisdictions. Forward-looking statements involve known and unknown risks, uncertainties and other
factors that are in some cases beyond West Wits Mining Limited’s control. These forward-looking statements
include, but are not limited to, all statements other than statements of historical facts contained in this
presentation, including, without limitation, those regarding West Wits Mining Limited’s future expectations.
Readers can identify forward-looking statements by terminology such as “aim,” “anticipate,” “assume,”
“believe,” “continue,” “could,” “estimate,” “expect,” “forecast,” “intend,” “may,” “plan,” “potential,”
“predict,” “project,” “risk,” “should,” “will” or “would” and other similar expressions. Risks, uncertainties and
other factors may cause West Wits Mining Limited’s actual results, performance, production or achievements
to differ materially from those expressed or implied by the forward-looking statements (and from past results,
performance or achievements).
These factors include, but are not limited to, the failure to complete and commission the mine facilities and
related infrastructure in the time frame and within estimated costs currently planned; variations in global
demand and price for gold fluctuations in exchange rates between the U.S. Dollar, South African Rand and
the Australian Dollar; the failure of West Wits Mining Limited’s suppliers, service providers and partners to fulfil
their obligations under construction, supply and other agreements; unforeseen geological, physical or
meteorological conditions, natural disasters or cyclones; changes in the regulatory environment, industrial
disputes, labour shortages, political and other factors; the inability to obtain additional financing, if required,
on commercially suitable terms; and global and regional economic conditions. Readers are cautioned not to
place undue reliance on forward-looking statements. The information concerning possible production in this
announcement is not intended to be a forecast. They are internally generated goals set by the board of
directors of West Wits Mining Limited. The ability of the Company to achieve any targets will be largely
determined by the Company’s ability to secure adequate funding, implement mining plans, resolve logistical
issues associated with mining and enter into any necessary off take arrangements with reputable third parties.
Although West Wits Mining Limited believes that its expectations reflected in these forward-looking statements
are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual
results will be consistent with these forward-looking statements.
ASX:WWI
The production target and financial forecasting reported under the Qala Shallows Definitive Feasibility Study
(DFS) contain inferred mineral resources. The directors confirm that it is reasonable to include these inferred
mineral resources having regard to the location and geology of the project in the well understood and
researched structure of the Witwatersrand Basin and the views provided to WWI by independent geological
expert consultants.
COMPETENT PERSON STATEMENTS
The original report was “Updates to Qala Shallows DFS provide improved results for Witwatersrand Basin
Project” which was issued with consent of the Competent Person, Mr. Jim Pooley. The report was released to
the ASX in July 2023 and can be found on the Company’s website (https://westwitsmining.com/). The
Company is not aware of any new information or data that materially effects the information included in the
relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent
of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on 16 December
2024 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at
4.60g/t for 1.595Moz measured, 12.29MT at 4.19g/t for 1.70Moz Indicated and 10.49MT at 5.10g/t for 1.73Moz
inferred. The Company is not aware of any new information or data that materially effects the information
included in the relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all
material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
PAGE | 2
Why invest in West Wits
Significant gold resource in the
Witwatersrand Basin Project (WBP)
South Africa
WBP – Mineral Resource Estimate
5Moz Gold
(65% measured & indicated categories)1
WBP - Project 200 - significant growth
opportunity aimed to produce
200 000oz Gold per annum
Qala Shallows (Stage 1) – Robust DFS
17yr Life-of-mine for 924,000oz
70,000oz p/a steady-state production
for 9 years2
Qala Shallows - DFS
Used US$1,850 gold price
Being reviewed to optimise at current
gold prices
Qala Shallows – Turn-key ready: fully
licensed, site infrastructure maintained; key
supplier contracts secured
Qala Shallows – Cost-effective toll treat
agreement with Ezulwini Mining
Company/ Sibanye-Stillwater subsidiary
Funding – Secured a ZAR 902.5M
(USD 50M) credit-approved term sheet
for a senior debt syndicated loan facility
Experienced international board and
management team
ASX: WWI | OTBCQB: WMWWF
CORPORATE SNAPSHOT
Transforming into mid-tier gold producer
CAPITAL STRUCTURE (ASX:WWI)
Shares on issue
Unlisted Options (exercise price range 2.2c – 25c)
New options exercise price 3.85c (pending shareholder approval)
Performance Rights
Convertible Notes
Market Capitalisation
@ 2.1c per share (on 20/06/2025)
3.27B
111.5M
318M
7.5M
16
A$69M
Cash – 20/6/2025
A$13.4M
Short Term Loan, convertible to Securities at WWI
election @ 2.2c per share#
A$550k
Enterprise Value per MRE Ounce
A$11.0/oz
JORC Mineral Resource Estimate1 (Gold)
includes declared Ore Reserves
*
5Moz
* Pending Completion of 10% Buyback of Lilitha Resources’ interest in WWM SA for US$5M per
announcement 16 June 2025
^ Convertible Notes (CN) with a A$25,000 Face Value, convertible to WWI shares at the lower
of 2c or a 20% discount to the 15-day VWAP until the notes expire on 16/10/26. The CN is free
and unsecured
# Short Term Loan, unsecured & expiring Nov-25, incurring interest at 10% per annum, which is
capitalised. At the Company’s sole election, the loan is to be repaid through conversion to
WWI securities on the same terms as the 2.2 cent placement announced on 16 June 2025.
ASX:WWI
PAGE | 4
BOARD & EXECUTIVE TEAM
MICHAEL QUINERT
Chairman (AUS)
ASX-experienced
commercial lawyer
with extensive
involvement in assisting
and advising publicly
listed mining
companies globally.
Non-Executive Director
of ASX-listed
companies and serves
on the boards of
several unlisted
companies
RUDI DEYSEL
CEO (SA)
Experienced analyst who
founded Far East Capital
Limited, a specialist
company financier and
corporate adviser in the
mining sector. Was the
founding Executive
Chairman of Canaccord
Genuity Australia
WARWICK GRIGOR
Non-Exec Dir (AUS)
ASX:WWI
JAC VAN HEERDEN
Non-Exec Dir (SA)
Mining Eng. with
Geophysics and MBA.
Production experience in
conventional narrow
tabular underground,
open-cast mining and
various commodities
including Gold, PGMs,
Copper and
Cobalt. Previous
experience includes Anglo
American and Galiano
Gold
Mining Engineer with
MBA, operations and
project experience in SA,
DRC and Zimbabwe.
Surface and underground
mine management
expertise in base and
precious metals. Strong
background in mine
technical services and
executive management.
Chartered Accountant
SIMON WHYTE
CFO / Company
Secretary (AUS)
and Associate Member of
the Governance Institute
of Australia with
experience in mining,
commodities and logistics,
including global majors,
Ernst & Young and BP
Australia. Expertise in
managing business
transformation and
integration projects
BCom with an MBA with
extensive experience in
ESG management and
leading transformation
projects from
development to
execution. Previously
head of stakeholder
relations at Lonmin
TOZAMA KULATI
SIWISA
Exec Dir/Head of
Corp Affairs (SA)
PAGE | 5
QALA SHALLOWS GOLD PROJECT
The Qala Shallows Gold Project (South Africa) comprises a low-risk, shallow underground mine utilising contract
mining with ore treated at an existing operational plant
HIGH TECHNICAL STANDARD
▪
Historic mine works with existing shafts & well-understood rock engineering
▪
Successful “Proof of Mining Method” extraction and stockpiled in 2022
OPERATIONS COMMENCED
▪
Robust DFS: Released to ASX July 2023 (being updated for optimisation)
▪
Fully permitted: Mining Right; power; environmental; social; water; explosives
▪
Surface and underground infrastructure: Developed with quick accessibility & rapid production
▪
Small footprint: Minimal rehabilitation liability
▪
Production rate-based contract: Enhancing productivity & efficiency
▪
Cost-effective offtake treatment agreement: With a nearby processing plant
STRONG ESG CREDENTIALS
▪
Black Economic Empowerment (BEE) ownership of 26% *
▪
Local Economic Development Program & Social Labour Plan
▪
Procurement from the local Sowetan community
EXCEPTIONAL ECONOMICS DFS2
▪
924koz gold produced over 17yr LOM
▪
First gold produced in <12 months with steady state production of 70,000oz p/a (9 years)
▪
First quartile cost producer with AISC $977/oz (LOM) & US$871/oz (steady state)
▪
Payback period of 1.1yrs from completion of construction
Note: the DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is reasonable to include these inferred
mineral resources in the well-understood and researched structure of the Witwatersrand Basin and the views provided to WWI by independent geological expert
consultants, given the project’s location and geology.
ASX:WWI
* Pending Completion of 10% Buyback of Lilitha Resources’ interest in WWM SA for US$5M per announcement 16 June 2025
PAGE | 6
SENIOR DEBT FACILITY OVERVIEW
~USD 50M DEBT SECURED WITH TIER-1 SOUTH AFRICAN FINANCIAL INSTITUTIONS
▪
Senior debt syndicated loan facility of up to ZAR 902.5 million (~USD 50M @ ZAR18.0/USD) (Facility).
▪
Final Credit Approval received from Industrial Development Corporation (IDC) & Absa Bank (Absa) in Feb-25.
▪
Definitive documentation finalised and execution pending.
▪
Facility to fund approx. 55% of Qala Shallows development with the remaining 45% covered by initial equity
contribution revenues from production during the 3-year construction period.
FACILITY KEY TERMS
▪
Proceeds for development, construction, commissioning & operation of Qala Shallows Gold Project
▪
Progressive drawdown over 24-months following project equity contribution
▪
Repayment over 36 months post drawdown phase
▪
Variable interest rate linked to JIBAR
▪
Borrower: West Wits (MLI) Ltd (South African subsidiary), guaranteed within the group
▪
Mandatory hedging via put options – ensuring 100% exposure to rising gold prices
EXTENSIVE 4-MONTH DUE DILIGENCE COMPLETED BY INDEPENDENT LENDER TECHNICAL EXPERTS
▪
Technical Review: Assessed resource & reserve statements, mine design, methodology & development plans,
cost inputs and economic assumptions.
▪
Environmental, Social & Governance Review: Evaluated Environmental Impact Assessment, compliance with
Mining Rights & Water Use Licenses, company policies & community impact.
▪
Legal Review: review of corporate entities, required permits, material supplier contracts, etc.
▪
Financial Model & Tax: review of the funders financial model, including reporting of tax and accounting
Images: Qala Shallows site visit with the Lenders
team during the banking due diligence program.
ASX:WWI
PAGE | 7
QALA SHALLOWS - DFS FINANCIAL MODEL & FUNDING2
KEY FINANCIAL METRICS – DFS Base Case US$1,850/oz
DEFINITIVE FEASIBILITY STUDY
▪
Post-Tax Free Cashflow of US$522m over Life-of-Mine
▪
AISC cost in lowest quartile at US$977/oz (LOM)
▪
Post-Tax - NPV7.5 US$255m and IRR 53%
▪
Under review for optimisation at current gold prices
GOLD PRICE
US$1,850/oz
GOLD PRICE
US$2,200/oz
Peak Funding
US$54m
US$43m
Payback Period
(from commencement)
4.1 years
3.6 years
US$367m
$531m
*(A$583m)
(A$843M)
US$255m
$366m
(A$405m)
(A$581M)
53%
72%
DFS - Financial Evaluation
Pre-Tax NPV (7.5%)
Post-Tax NPV (7.5%)
PEAK FUNDING REQUIREMENT
▪
US$54m (DFS) with 13 months payback from completion of construction
▪
Peak funding substantially reduced at prevailing Gold Price due to higher revenues
from production during the 3-year mine development phase
▪
At a Gold Price (US$2,200/oz), peak funding reduces to US$43M
▪
DFS - Financial Evaluation
GOLD PRICE US$1,850/oz
Total Revenue
US$1.7b
Total Free Cashflow
US$522m
Secured credit-approved term sheet for senior debt syndicated loan facility of up to
ZAR 902.5 million (~USD 50 million) with leading financial institutions Absa and the
Industrial Development Corporation (IDC)
LOM C1 Cost
US$818/oz
AISC – Life of Mine
US$977/oz
The Senior Lender Funding model is based on Ore Reserves only and incorporates
higher contingency rates compared to the DFS & finance costs
AISC – Steady State
US$871/oz
PROJECT FUNDING INITIATIVES
▪
Post-Tax Internal Rate of Return
Note: the DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is
reasonable to include these inferred mineral resources in the well-understood and researched structure of the Witwatersrand
Basin and the views provided to WWI by independent geological expert consultants, given the project’s location and geology.
ASX:WWI
Pre-Tax Internal Rate of Return
* USD converted to AUD at 1.5873
61%
PAGE | 8
WWI – GOLD RESOURCES
GLOBAL MINERAL RESOURCE ESTIMATE (JORC 2012)1
Category
Tonnage (Mt)
Grade (g/t)
Content (oz)
Measured
10.07
4.60
1 595 000
Indicated
12.29
4.19
1 700 000
Measured &
Indicated
23.00
4.45
3 295 000
Inferred
10.49
5.10
1 730 000
Total
33.49
4.66
5 025 000
▪
Significant global Mineral Resource Estimate of 5Moz
Gold @ 4.66 g/t Au1
▪
High confidence level with 65% of MRE in Measured &
Indicated categories.
▪
3 distinct reef horizons: Kimberley Reef; Bird Reef;
Main Reef (right image)
▪
Well-understood geology, mineralisation &
metallurgy
▪
Additional area under application
ASX:WWI
PAGE | 9
WBP – LOCATION & GROWTH POTENTIAL
SANDTON CBD
5. BIRD REEF
CENTRAL (BRC)
Gold & Uranium
JOHANNESBURG CBD
▪
2022 Scoping Study identified Five (5) distinct development
stages for the Witwatersrand Basin Project with Stages 1 – 4 Gold
Projects for a 27yr Life of Mine.6
▪
Qala Shallows is Stage 1 of the WBP which has been subject to a
DFS with a 17yr Life of Mine.2
▪
Prospecting Right (PR) adjacent to Qala Shallows granted
(yellow), & PR application (red) Environmental Authorisation
obtained - awaiting confirmation from regulator
▪
Stage 5 (BRC) is a potential standalone Gold & Uranium project.
Image: Mining Right (blue); Prospecting Right Granted (yellow)& PR Application (red)
ASX:WWI
PAGE | 10
WBP - MRE & ORE RESERVE GROWTH
6
WWI has progressively grown
the MRE under the 2012 JORC
Code to over 5Moz @
4.66g/t.1
The Company has grown
declared Ore Reserves to
351koz.2
5
GOLD OUNCES (MILLION)
WBP tenement area
previously held by DRD Gold
which had a Historical MRE
declared (2000 ASX Report) of
12.8Moz at 4.6g/t Gold under
the previous JORC Code3.
0.35
0.29
4
-
3
1.21
2
1
-
0.30
0.57
0.35
Jan-16
JAN-16
Maiden MRE 400M depth3
1.24
0.81
Dec-17
DEC-17
Upgrade: 400 1,500m on
Kimberley
Reefs11
Inferred
ASX:WWI
0.28
0.60
1.42
1.50
1.37
1.44
1.00
1.26
Jul-18
JUL-18
Addition to
of K9B
Reef10
1.38
1.31
1.30
1.31
Sept-21
SEP-21
DFS with
declared
maiden Ore
Reserve9
Indicated
Dec-21
DEC-21
Bird Reef &
Main Reef
Upgrade to
1,000m depth7
Measured
1.73
Dec-24
DEC-24
Boost with New
Prospecting Right
Granted1
Ore Reserves
PAGE | 11
QALA SHALLOWS - MINING INVENTORY & ORE RESERVE2
RUN OF MINE INVENTORY
▪
>1Moz Gold at 3.04g/t, inclusive of Ore Reserves
▪
Ore Reserves - 4Mt at 2.71g/t for 351,400 oz gold,
comprises 35% of the mining inventory
▪
During the first 6 years of production, reserves
comprise >75% of mining inventory
▪
An underground drilling program will be implemented
to convert resources to reserves as decline
development progresses to maintain a minimum level
of reserves
▪
Mineral Resource Estimate Cut-off at 2g/t is
calculated using a gold price of US$1,500/oz and ZAR
15.00/1 US$
▪
Significant upside to Mine Inventory at current gold
price (approx. US$ 2,700/oz) and Exchange rate
(approx. ZAR 17.50/1 US$)
RUN OF MINE INVENTORY (INCLUSIVE OF ORE RESERVES) 2
Mineral Resource
Estimate Category
Tonnage
(Mt)
Grade
(g/t)
Content
(kg)
Content
(oz)
Measured
1.01
2.93
2 949
95 000
Indicated
3.49
2.62
9 135
294 000
Inferred
5.78
3.32
19 156
616 000
Grand Total
10.28
3.04
31 240
1 004 000
Note: the DFS and any production target under the DFS contain inferred mineral resources. The
directors confirm that it is reasonable to include these inferred mineral resources in the wellunderstood and researched structure of the Witwatersrand Basin and the views provided to WWI
by independent geological expert consultants, given the project’s location and geology.
ASX:WWI
PAGE | 12
QALA SHALLOWS - MINING PLAN
Trackless development with conventional stoping
– tried and tested
▪
Ore body is accessed from surface via a decline system developed
from the existing Qala adit box cut
▪
The decline is located centrally in the mining area and the K9B
footwall
▪
Stopes will be accessed via strike drives developed on the K9B reef
horizon
▪
Development of the strike drives and decline will be by mechanised
method with drill rigs, LHDs and ADTs deployed for drilling, face
cleaning and hauling of blasted rock to the tips respectively
▪
Mining in the stope blocks will be using standard conventional
mining techniques widely used in region with the deployment of
handheld drills and cleaning using a scraper and winch
combination
▪
Most of the mining will take place in a large unmined block of
ground to the east of the property
▪
Stoping will commence from 35m below surface to a maximum
depth of 850m
▪
A small amount of waste rock will be stockpiled on site
▪
Once on surface, ore will be trucked approximately 40km to an
existing processing plant under a Toll Processing agreement with
Sibanye Stillwater.
ASX:WWI
Stage 3
Stage 2
Stage 1 - DFS
Stage 4
PAGE | 13
QALA SHALLOWS - PERMANENT SURFACE
LAYOUT2
▪ Critical infrastructure
complete
▪ Contracts finalised and
being executed
▪ All permits and power/water
in place
▪ Mobilisation commenced
MINE EXTENSION
June 2025 Scoping Study
Stage 2 – Main Reef
Stage 3 – Bird
Reef East
▪ Pre-production
works
Stage 4 – Qala Deeps
underway
▪ Key equipment moving
to site
▪ Key personnel hires
completed
▪ Mining contractor
engaged
ASX:WWI
PAGE | 14
QALA SHALLOWS - PRODUCTION SCHEDULE
MINING SCHEDULE & GRADE
DFS completed in July 2023 by Bara Consulting2
•
DFS completed on first stage of development to
deliver 924,000oz gold at AISC of US$977/oz
•
*Initial production will provide a robust 30,000 tonne
ore stockpile to facilitate delivery of 15,000 tonnes per
month to Sibanye-Stillwater’s plant , which ramps up
to steady-state of around 60,000 tonnes per month
•
Targeting achievement of the stockpile & delivery
within 6 to 8 months from start of production
•
Gradual mine build-up towards a steady-state
production of 5,700 ounces of gold per month at an
AISC of US$871/oz
GOLD PRODUCTION
Note: the DFS and any production target under the DFS contain inferred mineral resources. The
directors confirm that it is reasonable to include these inferred mineral resources in the wellunderstood and researched structure of the Witwatersrand Basin and the views provided to
WWI by independent geological expert consultants, given the project’s location and geology.
ASX:WWI
PAGE | 15
TARGETING FIRST GOLD POUR Q4 2025
2024
2025E
H1
2026E
H2
H1
2027E
H2
2028E
H1
H2
H1
H2
LVL 2
LVL 3
LVL 4
LVL 5
Progress completion of Project Finance package
Mobilise mining contractors
Commission underground mine development
Build 30,000t stockpile & start deliveries to Sibanye
First gold pour
EPCM contract works – major surface infrastructure
UG level access via decline development
LVL 1
Ongoing UG sampling to grow Ore Reserves
Ramp up of gold production to 70,000oz pa Steady-State2
Note: the DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is
reasonable to include these inferred mineral resources in the well-understood and researched structure of the Witwatersrand
Basin and the views provided to WWI by independent geological expert consultants, given the project’s location and geology.
ASX:WWI
PAGE | 16
KEY MILESTONES DRIVING VALUE
2021
Milestones
Catalysts
✓ Mining Right granted with 3.5Moz gold MRE8
❖ Execute legal documents on US$50M Sr. Loan Facility (Jun-25)
✓ Stage 1 DFS confirms 278koz Reserves & AISC
US$1,144/oz1
❖ Progress completion of Project Finance package (Jun-25)
✓ MRE increased to 4.3Moz Gold7
❖ Commission UG mine development (Jun-25)
✓ Revised Scoping Study on Stages 1 – 46
❖ Increase project ownership to >70% via BEE Buy-Back (Jul-25)
✓ Early Works: surface infrastructure & UG access
established
❖ Release updated Qala Shallows DFS (Aug-25)
✓ Toll Processing Agreement secured with Sibanye
Stillwater
❖ First ore production via completed early works development (Oct-25)
✓ Updated DFS boosts Reserves to 351koz & AISC
US$977/oz2
✓ Contracts negotiated with key suppliers
✓ Project finance due diligence successfully completed
✓
MRE increased to 5Moz Gold1
❖ Review and update feasibility for current gold price (Jul to Aug-25)
❖ Deliveries to Sibanye plant & First Gold Pour (Mar-26)
❖ Steady production ramp up via decline development (2026-27)
❖ Steady-state production commences, 9-years @ 70,000/oz pa2 (2028)
2025 ✓ Credit Approval received from 2 senior lenders
✓ Complete capital raise June 2025 and commence
mobilisation at site
ASX:WWI
PAGE | 17
WBP ENVIRONMENTAL, SOCIAL & GOVERNANCE (ESG)
ENVIRONMENTAL STEWARDSHIP & BIODIVERSITY CONSERVATION
▪
Complete underground operation: low noise and dust levels
▪
Small footprint & surface infrastructure: low rehabilitation liability &
minimal impact on surrounding environment
▪
Efficient water use model: Minimal water usage & zero effluent
discharge into local tributaries
SOCIAL POSITIVE IMPACT OF HOST COMMUNITIES
▪
Local Economic Development Programme: Community wards forum in
collaboration with City of Joburg
▪
Local procurement: Sourced from growing BEE database
▪
Social & Labour Plan: Includes Beneficiary Learnership Programme
GOVERNANCE RESPONSIBLE PRODUCTION PRACTICES
▪
Corporate Governance Framework: Complies with changing legal
& regulatory requirements
▪
Company Mine Health & Safety: Conforms to Mine Health & Safety Act
29 of 1996
▪
Health & Safety: Zero harm approach
▪
Stakeholder Engagement: Transparent reporting
ASX:WWI
PAGE | 18
Qala Shallows Box Cut
CHIEF EXECUTIVE OFFICER
INVESTOR RELATIONS
SOUTH AFRICA
AUSTRALIA
Rudi Deysel
Keith Middleton
rdeysel@westwitsmining.com
keith@middletoncorporate.com.au
Unit 8A, Sifon Industrial Park
279 Sifon Street, Robertville
Roodepoort
1709
Level 6, 400 Collins Street
Melbourne, Victoria
Australia
3000
westwitsmining.com | info@westwitsmining.com
COPYRIGHT ©2025 ALL RIGHTS RESERVED
ASX:WWI
PAGE | 19
EXPERIENCED MANAGEMENT TEAM
SIFISO MAGWAZA
Mine Manager (SA)
MARTIN BEVENLANDER
Head of Geology &
Exploration (SA)
ASX:WWI
Mining Engineer with
experience managing
large, diverse teams in
mining operations, from
shallow underground
mining to deep level gold
mining, operational
expansions, as well as
Brownfields across gold,
platinum, copper, iron
and manganese. Formerly
with Impala, Glencore,
Palabora, South32 and
Harmony Gold
Geologist with expertise
that spans across the
entire mining cycle from
greenfield exploration,
and project
development to
production. Worked in
Indonesia, Papua New
Guinea, Australia and
across Africa
LINDIWE MAGIDIMISA
Projects & Business
Development
Manager (SA)
BSc Chemical
Engineering, PGDip
Industrial Engineering,
and MBA. Experience
spans multiple business
functions, including
Capital Assurance,
Capital Projects, Business
Improvement, and
serving as Chief of Staff in
CEO’s office at De Beers
CGMA, ACMA, AMDP with
BCom (Hons) in
Management and Financial
Accounting. Financial
strategist with track record
in cost transformation and
operational efficiency.
Previous experience
includes Petra Diamonds
and Anglo American
ARNOLDUS LUDICK
Financial Manager
(SA)
PAGE | 20
APPENDIX 1: ORE RESERVE & MINERAL RESOURCE ESTIMATE STATEMENTS
Table 1: WBP (JORC) Ore Reserve2
Declared ore reserve of 4.03MT at 2.71g/t for 351,424oz Gold2
ORE RESERVE STATEMENT FOR QALA SHALLOWS (JORC 2012)
ORE Reserve
Category
Tonnage
(Mt)
Grade
(g/t)
Content
(kg)
Content
(oz)
Proved
0.96
2.96
2 847
91 536
Probable
3.07
2.64
8 083
259 887
Total
4.03
2.71
10 930
351 424
Note: errors may occur due to rounding differences
Ore Reserve Notes:
1. No Inferred Mineral Resources are included in the Ore Reserves.
2. The evaluation used a gold price US$1,850 per ounce and a rate of exchange of R17.5 / US$ 1.
WBP’s Global Mineral Resource is made up of several gold bearing reefs across the mining right
area, a breakdown by reef and MRE category is detailed in Table 2 1.
MRE Notes:
1. Global MRE set at a 2.0g/t Au cut-off. Reported in accordance with the JORC Code of 2012.
2. Number differences may occur due to rounding errors.
3. Mineral Resources are reported as inclusive of Ore Reserves.
4. The Inferred Mineral Resources have a high degree of uncertainty, and it should not be assumed that all
or a portion thereof will be converted to Ore Reserves.
REFER TO SLIDE 10 FOR QALA SHALLOWS MINE INVENORY TABLE – 1Moz
Table 2: WBP (JORC) Mineral Resource Estimate – by Reef (2g/t cut-off)1
Measured
Indicated
Inferred
Total
Reef
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Bird – Central & West
0.04
3.73
0.00
0.89
2.51
0.07
0.44
2.86
0.04
1.38
2.66
0.12
Bird – East
2.22
4.30
0.31
2.00
4.74
0.30
0.42
4.48
0.06
4.63
4.51
0.67
K9B KRC
0.00
2.98
0.00
0.10
3.87
0.01
0.18
4.22
0.02
0.28
4.08
0.04
K9B KRE
1.93
4.37
0.27
6.21
4.14
0.83
2.35
5.51
0.42
10.50
4.49
1.52
K9A KRE
2.10
4.54
0.31
1.82
4.20
0.25
4.20
5.14
0.69
8.11
4.77
1.25
K9B KRE (PR 10730)
0.31
5.18
0.05
0.54
5.92
0.10
1.46
5.18
0.24
2.31
5.35
0.40
K9A KRE (PR 10730)
0.59
4.95
0.09
0.50
5.01
0.08
1.05
5.27
0.18
2.14
5.12
0.35
Main Reef Leader
0.72
5.81
0.14
0.15
8.34
0.04
0.09
7.54
0.02
0.96
6.36
0.20
Main
2.79
4.73
0.42
0.09
5.15
0.01
0.31
5.27
0.05
3.19
4.79
0.49
Total
ASX:
WWI | OTBCQB: WMWWF10.70
4.60
1.59
12.29
4.19
1.70
10.49
5.10
1.73
33.49
4.66
5.03
Note: errors may occur due to rounding differences
APPENDIX 2 - REFERENCES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on 16 December
2024 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at 4.60g/t for 1.595Moz measured, 12.29MT at 4.19g/t for 1.70Moz Indicated and 10.49MT at 5.10g/t for 1.73Moz inferred.
The Company is not aware of any new information or data that materially effects the information included in the relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
The original report was “Updates to Qala Shallows DFS provide improved results for Witwatersrand Basin Project” which was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to the
ASX on 27 July 2023 and can be found on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially effects the information included in the relevant
market announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply
and have not materially changed. The form and cont