Logo
West Wits Mining

THE PROJECT · WITWATERSRAND BASIN, SOUTH AFRICA

Witwatersrand Basin Project

A world-class South African gold asset, back in production.

Our flagship is a large, high-grade gold system on the doorstep of Johannesburg in the most prolific goldfield in history. After years of study, funding and development, our Qala Shallows mine poured first gold in March 2026 and is now ramping toward steady-state production: the foundation of our transition from developer to producer, and the platform for something much larger.

March 2026
First gold poured
70,000 oz
Steady-state p.a.
7.24 Moz
Resource @ 4.0 g/t
Fully funded
To steady state

DE-RISKED

Built to be profitable and fully funded

Qala Shallows is engineered to generate cash through the cycle and is fully funded to steady-state production by two of South Africa's leading mining financiers, Absa and Nedbank. With gold trading above US$4,000 an ounce, its low-cost base converts directly into margin.

US$500M
Post-tax NPV
US$1,289/oz
All-in sustaining cost
R1.115bn
Absa and Nedbank facility

RESPONSIBLE MINING

Mining that empowers

We build local enterprise, create jobs and share prosperity with our host communities in Gauteng, proving a world-class asset can create lasting value for everyone it touches.

Corporate Social Responsibility