WWI Investor Presentation - Noosa Mining Conference
Released
Released
Announcement PDF
page i
ASX Announcement and Media Release
Tuesday, 11 November 2025
West Wits Mining Presentation
Noosa Mining Conference
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) is pleased to advise that Chairman, Michael
Quinert, will be attending and presenting at the Noosa Mining Conference held in Noosa, Queensland
from Wednesday 12th
to Friday 14th
November 2025.
Presentation Date: Thursday 13 November 2025
Presentation Time: 2:00pm (AEDT)
To watch the presentation online register via this Link.
Additionally, Michael will be presenting at the Noosa Pitch N’ Pizza event, co-hosted by the Association
of Mining and Exploration Companies (AMEC) and Tau Media, on Tuesday 11th
November at 5pm at
Miss Moneypenny’s in Noosa.
A copy of the Investor Presentation for the event is attached, highlighting the rapid progress the
Company has achieved over the past few months, the opportunity at the Qala Shallows project and
the key milestones driving value for West Wits.
Approved for release by the Joint Company Secretary, Simon Whyte.
For further information, contact our Media and Investor Relations:
Keith Middleton - keith@middletoncorporate.com.au
Jessica Lee Fertig – jessica@taumediau.com.au
General
info@westwitsmining.com
westwitsmining.com
linkedin.com/company/west-wits-mining
ABOUT WEST WITS MINING LIMITED
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) is focused on the exploration, development and
production of high-value precious and base metals for the benefit of shareholders, communities and
environments in which it operates. Witwatersrand Basin Project, located in the proven gold region of Central
Rand Goldfield of South Africa, boasts a 5.025Moz gold project at 4.66g/t1
.
1. The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent of the
Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on 16 December 2024 and can
be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at 4.60g/t for 1.595Moz
measured, 12.29MT at 4.19g/t for 1.70Moz Indicated and 10.49MT at 5.10g/t for 1.73Moz inferred. The Company is
not aware of any new information or data that materially effects the information included in the relevant market
announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
Qala Shallows, Witwatersrand Basin Project, Gauteng
Mining District, Johannesburg, South Africa
COPYRIGHT ©2025 ALL RIGHTS RESERVED
Noosa Mining Conference
November 2025
ASX:WWI
Unlocking Long-Life
Gold Production in the
Witwatersrand Basin
Building the next South African
Gold Producer
PAGE | 2
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Forward-looking Statements
This presentation includes “forward-looking statements” as that term within the meaning of securities laws of
applicable jurisdictions. Forward-looking statements involve known and unknown risks, uncertainties and other
factors that are in some cases beyond West Wits Mining Limited’s control. These forward-looking statements
include, but are not limited to, all statements other than statements of historical facts contained in this
presentation, including, without limitation, those regarding West Wits Mining Limited’s future expectations.
Readers can identify forward-looking statements by terminology such as “aim,” “anticipate,” “assume,”
“believe,” “continue,” “could,” “estimate,” “expect,” “forecast,” “intend,” “may,” “plan,” “potential,”
“predict,” “project,” “risk,” “should,” “will” or “would” and other similar expressions. Risks, uncertainties and
other factors may cause West Wits Mining Limited’s actual results, performance, production or achievements to
differ materially from those expressed or implied by the forward-looking statements (and from past results,
performance or achievements).
These factors include, but are not limited to, the failure to complete and commission the mine facilities and
related infrastructure in the time frame and within estimated costs currently planned; variations in global
demand and price for gold fluctuations in exchange rates between the U.S. Dollar, South African Rand and the
Australian Dollar; the failure of West Wits Mining Limited’s suppliers, service providers and partners to fulfil their
obligations under construction, supply and other agreements; unforeseen geological, physical or
meteorological conditions, natural disasters or cyclones; changes in the regulatory environment, industrial
disputes, labour shortages, political and other factors; the inability to obtain additional financing, if required, on
commercially suitable terms; and global and regional economic conditions. Readers are cautioned not to
place undue reliance on forward-looking statements. The information concerning possible production in this
announcement is not intended to be a forecast. They are internally generated goals set by the board of
directors of West Wits Mining Limited. The ability of the Company to achieve any targets will be largely
determined by the Company’s ability to secure adequate funding, implement mining plans, resolve logistical
issues associated with mining and enter into any necessary off take arrangements with reputable third parties.
Although West Wits Mining Limited believes that its expectations reflected in these forward-looking statements
are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual
results will be consistent with these forward-looking statements.
The production target and financial forecasting reported under the Qala Shallows Definitive Feasibility Study
(DFS) contain inferred mineral resources. The directors confirm that it is reasonable to include these inferred
mineral resources having regard to the location and geology of the project in the well understood and
researched structure of the Witwatersrand Basin and the views provided to WWI by independent geological
expert consultants.
Competent Person Statements
The original report was “Updates to DFS provide Improved Results for WBP” which was issued with consent of the
Competent Person, Mr. Jim Pooley. The report was released to the ASX in July 2025 and can be found on the
Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data
that materially effects the information included in the relevant market announcement and, in the case of
Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed. The form
and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcement.
The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent
of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on 16 December
2024 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at 4.60g/t
for 1.595Moz measured, 12.29MT at 4.19g/t for 1.70Moz Indicated and 10.49MT at 5.10g/t for 1.73Moz inferred.
The Company is not aware of any new information or data that materially effects the information included in
the relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
Disclaimer
PAGE | 3
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Why invest in West Wits
Witwatersrand Basin Project (WBP) − South Africa
Investment Highlights: Mining? Why West Wits
Transitioning to Production: >5Moz Gold Resource1; Qala Shallows now
producing underground ore.
High-Return Economics: Updated DFS2 confirms US$983M free cash
flow, 81% IRR, and 8-month payback @ USD2,850/oz gold price.
Fully Funded: Combination of equity placement and loan facilities
provides full funding through to sustainable gold production.
Tier-One Jurisdiction: Operating within South Africa’s Witwatersrand
Basin − responsible for ~22% of global historic gold production.
Experienced Leadership & ESG Alignment: Strong management,
community partnerships, and sustainability-driven programs.
PAGE | 4
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Company Snapshot
Metric Detail
Primary Project Witwatersrand Basin Project (WBP), Gauteng, South Africa
Ownership 74% West Wits MLI (Pty) Ltd (26% BEE Partner)
Resource Base >5.0Moz @ 4.66 g/t Au1
Mine Type Underground gold mine
Processing Toll treatment agreement with Sibanye-Stillwater’s Ezulwini Plant
First Gold Production On track (Q1 2026); funding secured
Secondary Asset Mt Cecilia Project (WA) – Gold & Copper target in Paterson Province
PAGE | 5
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Corporate Snapshot
Transforming into mid-tier gold producer
Capital Structure (ASX:WWI)
Shares on issue
Listed Options (Exercise Price 3.85c, expiring 5th Sep-27)
Unlisted Options (exercise price range 2.2c – 25c)*
Performance Rights
Convertible Notes^
3.83B
339M
80M
7.5M
2
Market Capitalisation
@ 5.0c per share (on 05/11/2025)
A$192M
Cash – 31/10/2025 A$12.8M
Enterprise Value per MRE Ounce A$35.6/oz
JORC Mineral Resource Estimate1 (Gold)
includes declared Ore Reserves
5Moz
^ Convertible Notes (CN) with a A$25,000 Face Value, convertible to WWI shares at the
lower of 2c or a 20% discount to the 15-day VWAP until the notes expire on 16/10/26. The
CN is free and unsecured
PAGE | 6
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Board & Executive Team
Experienced analyst who founded Far
East Capital Limited, a specialist
company financier and corporate
adviser in the mining sector. Was the
founding Executive Chairman of
Canaccord Genuity Australia
Mining Engineer with MBA, operations
and project experience in SA, DRC and
Zimbabwe. Surface and underground
mine management expertise in base
and precious metals. Strong
background in mine technical services
and executive management
ASX-experienced commercial lawyer with extensive
involvement in assisting and advising publicly listed
mining companies globally. Non-Executive Director of
ASX-listed companies and serves on the boards of
several unlisted companies
Michael Quinert
Chairman (AUS)
Jac van Heerden
Non-Exec Dir
(SA)
Warwick Grigor
Non-Exec Dir
(AUS)
Simon Whyte
CFO / Company Secretary (AUS)
Chartered Accountant and Associate Member of the
Governance Institute of Australia with experience in
mining, commodities and logistics, including global majors,
Ernst & Young and BP Australia. Expertise in managing
business transformation and integration projects
Rudi Deysel
CEO (SA) / MD
Mining Eng. with Geophysics and MBA. Production
experience in conventional narrow tabular
underground, open-cast mining and various
commodities including Gold, PGMs, Copper and
Cobalt. Previous experience includes Anglo American
and Galiano Gold
Tozama Kulati
Siwisa
Exec Dir/Head of
Corp Affairs (SA)
BCom with an MBA with extensive
experience in ESG management and
leading transformation projects from
development to execution. Previously
head of stakeholder relations at
Lonmin. 2025 AAMEG Rising Star Award
winner
Keith Middleton
Non-Exec Dir
(AUS)
Company director with significant
experience in capital markets, strategy
and mining operations in Australia, North
America and South Africa. Previously
founding MD of American Rare Earths
and NED in ASX listed resource
companies Redbank Copper and
Advance Metals
PAGE | 7
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
The Witwatersrand Basin Opportunity
▪ Located in the
world’s richest and
most productive
gold regions
▪ Historic output: >1.5
billion ounces
(40,000 tonnes)
▪ Established mining
jurisdiction with
modern
infrastructure and
skilled labour
▪ West Wits controls a
strategic position in
the Central Rand
Goldfield, adjacent
operating mines
PAGE | 8
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Funding Secured for Growth
Fully funded to first gold
▪ AUD 12.8M Cash Balance at 31/10/2025
▪ USD 12.5M Nebari Loan Facility (part of a scalable US$35M package)
▪ Executed Senior Debt syndicated loan facility of up to ZAR 875 million
(~USD 50 million) with two leading South African financial institutions
West Wits now has complete funding pathway to achieve sustainable gold
production and operational ramp-up
2025 2026
2026/
2027
From
2028
Jul Aug Sep Oct Mar
Updated Qala Shallows DFS - US$500M Post-Tax NPV7.5 ; 384koz Reserves & AISC US$1289/oz2
✓
Project Finance package secured ✓
Qala Shallows site Mobilisation complete ✓
First ore production via completed early works development ✓
First Gold Pour from Sibanye’s Ezulwini Plant ●
Production ramp up via decline development ●
Steady-state production: 70,000/oz pa for 12 years2
●
PAGE | 9
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Fully mobilised and producing
Qala Shallows: The Foundation for Growth
Ore production commenced from
underground workings
Fully commissioned site infrastructure:
power, ventilation, water, LHDs, and
drill rigs operational
Building 30,000t ore stockpile to
commence processing at Ezulwini
Plant
Designed for long-life, low-cost gold
production with scalability
PAGE | 10
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Gold Production
Qala Shallows − Strong Project Economics
Updated DFS completed in July 2025 by
Bara Consulting2
Base Case Financials (at US$2,850/oz):
• Revenue: US$2.7 billion
• Free Cash Flow: US$983 million
• NPV (Post-Tax, 7.5%): US$500 million
• IRR (Post-Tax): 81%
• Payback: 8 months from end of funding
period
• LOM: 17 years
• Robust at all gold prices:
Even at US$1,850/oz, the project delivers
a 35% IRR, demonstrating strong
resilience.
Note: the DFS and any production target under the DFS contain
inferred mineral resources. The directors confirm that it is reasonable
to include these inferred mineral resources in the well-understood
and researched structure of the Witwatersrand Basin and the views
provided to WWI by independent geological expert consultants,
given the project’s location and geology.
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
0
200
400
600
800
1,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Recovered
Gold
(OZ)
Ore
Tonnes
'000s
Project Year
ORE Tonnes − 2025 Update Recovered Gold
Mining Schedule & Grade
-
1.0
2.0
3.0
4.0
5.0
-
200
400
600
800
1,000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
ROM
Grade
(g/t)
Ore/Waste
Tonnes
(KT)
Project Year
Ore Tonnes Waste Tonnes ROM Grade
PAGE | 11
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Qala Shallows − Mining Inventory and Ore Reserve2
Run of mine inventory
▪ 1.03Moz Gold at 3.0g/t, inclusive of Ore
Reserves
▪ Ore Reserves – 4.6Mt at 2.60g/t for
384,000 oz gold, (37% of the mining
inventory)
▪ First 7 years of production: Reserves
comprise >75% of mining inventory
▪ Ongoing underground drilling to
convert Resources to Reserves as
decline development progresses
▪ Mine Plan cut-off grade at 1.31g/t is
calculated using a gold price of
US$2,850/oz and ZAR 18.00/1 US$
Note: the DFS and any production target under the DFS contain
inferred mineral resources. The directors confirm that it is
reasonable to include these inferred mineral resources in the well-
understood and researched structure of the Witwatersrand Basin
and the views provided to WWI by independent geological
expert consultants, given the project’s location and geology.
Run of Mine Inventory (Inclusive Of Ore Reserves) 2
Mineral Resource
Estimate Category
Tonnage
(Mt)
Grade
(g/t)
Content
(kg)
Content
(oz)
Measured 1.4 2.78 3 167 102 000
Indicated 3.7 2.54 9 487 305 000
Inferred 5.8 3.30 19 268 619 000
Grand Total 10.7 2.98 31 922 1 026 000
Mining schedule by Ore Reserve/Mineral Resource category
-
10
20
30
40
50
60
70
80
90
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
RoM
Ounces
'000s
Year
Measured and indicated Inferred Proven and probable
PAGE | 12
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
WWI − Gold Resources
Global Mineral Resource Estimate (JORC 2012)1
Category Tonnage (Mt) Grade (g/t) Content (oz)
Measured 10.07 4.60 1 595 000
Indicated 12.29 4.19 1 700 000
Measured & Indicated 23.00 4.45 3 295 000
Inferred 10.49 5.10 1 730 000
Total 33.49 4.66 5 025 000
▪ Significant global Mineral Resource Estimate of
>5Moz Gold @ 4.66 g/t Au1
▪ High confidence level with 65% of MRE in Measured
& Indicated categories
▪ 3 distinct reef horizons: Kimberley Reef; Bird Reef;
Main Reef (right image)
▪ Well-understood geology, mineralisation &
metallurgy
▪ Additional areas under application
Expansion Potential: Proven Mineralisation and Metallurgy
PAGE | 13
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
▪ WBP tenement area
previously held by DRD
Gold which had a
Historical MRE declared
(2000 ASX Report) of
12.8Moz at 4.6g/t Gold
under the previous JORC
Code3.
▪ WWI has progressively
grown the MRE under the
2012 JORC Code to over
5Moz @ 4.66g/t.1
▪ The Company has grown
declared Ore Reserves to
384koz.2
0.35
0.81
1.26 1.30 1.31
1.73 1.73
0.57
1.24
1.00
1.38 1.31
1.44 1.42
0.30
1.21
1.42 0.60
1.37
1.51 1.49
0.28
0.29
0.35 0.38
-
1
2
3
4
5
6
Jan-16 Dec-17 Jul-18 Sep-21 Dec-21 Dec-24 Jul-25
Addition to
of K9B Reef8
DFS with
declared
maiden Ore
Reserve7
Bird Reef &
Main Reef
Upgrade to
1,000m depth5
Boost with
New
Prospecting
Right
Granted1
Maiden MRE -
400M depth3
Inferred Indicated Measured Ore Reserves
WBP − MRE and Ore Reserve Growth
Upgrade: 400 -
1,500m on
Kimberley
Reefs9
Gold Ounces (Million) DFS updated
with
US$2,850/oz
gold price &
ZAR18:$1 FX
rate2
PAGE | 14
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
WBP − Location and Growth Potential
Image: Mining Right (blue); Prospecting Right Granted (yellow) & PR Application (red)
5. BIRD REEF
CENTRAL (BRC)
Gold & Uranium
2022 Scoping Study: 5
Development stages; Stages 1 – 4
Gold Projects (27-year LoM)4
Stage 1 (Qala Shallows) - DFS
complete (17-year LoM)2
Adjacent PR granted; additional
PR application EA approved,
awaiting granting by regulator
Stage 5 (BRC): potential
standalone Gold & Uranium
project
PAGE | 15
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Key Milestones Driving Value
Catalysts
2025 2026 2027 2028
First ore production
via completed early
works development
(Oct-25)
Prospecting Right
Application to extend
WBP footprint (2025)
Production ramp up
via decline development
(2026-27)
Steady-state
production: 70,000/oz pa
for 12 years2
(from 2028)
First Gold Pour from
Sibanye’s Ezulwini
Plant
(Mar-26)
PAGE | 16
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Qala Shallows Transition to Production
PAGE | 17
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
WBP Environmental, Social & Governance (ESG)
Local Enterprise Development: Partnering with community vendors for site catering & logistics
Learnership Program: Mining skills development for local youth
Transparency & Inclusion: Active engagement with Wards 40–127 through LED Forums
Sustainability Focus: Safe operations, local procurement, and community-driven impact
PAGE | 18
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
AUSTRALIA
Level 6, 400 Collins Street
Melbourne, Victoria
Australia
3000
INVESTOR RELATIONS
Jessica Fertig
Jessica@taumedia.com.au
SOUTH AFRICA
Unit 8A, Sifon Industrial Park
279 Sifon Street, Robertville
Roodepoort
1709
westwitsmining.com | info@westwitsmining.com
Company Contact
Keith Middleton
keith@middletoncorporate.com.au
PAGE | 19
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Sifiso Magwaza
Mine Manager
(SA)
Lindiwe Magidimisa
Projects & Business Development Manager
(SA)
Mining Engineer with experience managing large, diverse teams
in mining operations, from shallow underground mining to deep
level gold mining, operational expansions, as well as Brownfields
across gold, platinum, copper, iron and manganese. Formerly
with Impala, Glencore, Palabora, South32 and Harmony Gold
BSc Chemical Engineering, PGDip Industrial Engineering, and
MBA. Experience spans multiple business functions, including
Capital Assurance, Capital Projects, Business Improvement, and
serving as Chief of Staff in CEO’s office at De Beers
Experienced Management Team
Martin Bevenlander
Head of Geology & Exploration
(SA)
Arnoldus Ludick
General Manager Finance and Admin
(SA)
Geologist with expertise that spans across the entire mining cycle
from greenfield exploration, and project development to
production. Worked in Indonesia, Papua New Guinea, Australia
and across Africa
CGMA, ACMA, AMDP with BCom (Hons) in Management and
Financial Accounting. Financial strategist with track record in cost
transformation and operational efficiency. Previous experience
includes Petra Diamonds and Anglo American
PAGE | 20
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Table 1: WBP (JORC) Ore Reserve2
Declared Ore Reserve of 4.6MT at 2.6g/t for 383,934oz Gold2
Ore Reserve Notes:
1. No Inferred Mineral Resources are included in the Ore Reserves.
2. The evaluation used a gold price US$2,850 per ounce and a rate of exchange of R18.0 / US$ 1.
WBP’s Global Mineral Resource is made up of several gold bearing reefs across the mining right area, a breakdown
by reef and MRE category is detailed in Table 21.
MRE Notes:
1. Global MRE set at a 2.0g/t Au cut-off. Reported in accordance with the JORC Code of 2012.
2. Number differences may occur due to rounding errors.
3. Mineral Resources are reported as inclusive of Ore Reserves.
4. The Inferred Mineral Resources have a high degree of uncertainty, and it should not be assumed that all or a
portion thereof will be converted to Ore Reserves.
Refer to slide 10 for Qala Shallows Mine inventory table – 1moz
Table 2: WBP (JORC) Mineral Resource Estimate – by Reef (2g/t cut-off)1
Ore Reserve Statement For Qala Shallows (JORC 2012)
ORE Reserve Category
Tonnage
(Mt)
Grade
(g/t)
Content
(kg)
Content
(oz)
Proved 1.1 2.79 3 086 99 205
Probable 3.49 2.54 8 856 284 730
Total 4.6 2.60 11 942 383 934
Reef
Measured Indicated Inferred Total
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Bird – Central & West 0.04 3.73 0.00 0.89 2.51 0.07 0.44 2.86 0.04 1.38 2.66 0.12
Bird – East 2.22 4.30 0.31 2.00 4.74 0.30 0.42 4.48 0.06 4.63 4.51 0.67
K9B KRC 0.00 2.98 0.00 0.10 3.87 0.01 0.18 4.22 0.02 0.28 4.08 0.04
K9B KRE 1.93 4.37 0.27 6.21 4.14 0.83 2.35 5.51 0.42 10.50 4.49 1.52
K9A KRE 2.10 4.54 0.31 1.82 4.20 0.25 4.20 5.14 0.69 8.11 4.77 1.25
K9B KRE (PR 10730) 0.31 5.18 0.05 0.54 5.92 0.10 1.46 5.18 0.24 2.31 5.35 0.40
K9A KRE (PR 10730) 0.59 4.95 0.09 0.50 5.01 0.08 1.05 5.27 0.18 2.14 5.12 0.35
Main Reef Leader 0.72 5.81 0.14 0.15 8.34 0.04 0.09 7.54 0.02 0.96 6.36 0.20
Main 2.79 4.73 0.42 0.09 5.15 0.01 0.31 5.27 0.05 3.19 4.79 0.49
Total 10.70 4.60 1.59 12.29 4.19 1.70 10.49 5.10 1.73 33.49 4.66 5.03
Note: errors may occur due to rounding differences
Note: errors may occur due to rounding differences
Appendix 1:
Ore Reserve & Mineral Resource Estimate Statements
PAGE | 21
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
Appendix 2:
References (1/2)
1. The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent of the Competent Person, Mr Hermanus Berhardus Swart. The report
was released to the ASX on 16 December 2024 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at 4.60g/t for 1.595Moz measured,
12.29MT at 4.19g/t for 1.70Moz Indicated and 10.49MT at 5.10g/t for 1.73Moz inferred. The Company is not aware of any new information or data that materially effects the
information included in the relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
2. The original report was “Updates to DFS provide Improved Results for WBP” which was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to
the ASX on 23 July 2025 and can be found on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially
effects the information included in the relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement. The DFS and any production target under the DFS contain inferred mineral
resources. The directors confirm that it is reasonable to include these inferred mineral resources in the well-understood and researched structure of the Witwatersrand Basin and the
views provided to WWI by independent geological expert consultants, given the project’s location and geology.
3. The original report was “Updated Mineral Resource Estimate for the Soweto Cluster” which was issued with consent of competent persons Mr. Hermanus Berhardus Swart, it was
released to the ASX on 22 January 2016 and can be found on the Company’s website (https://westwitsmining.com/). The company is not aware of any new information or data that
materially effects the information included in the relevant market announcement. The form & context in which the Competent Persons’ findings are presented have not been
materially modified.
4. The original report was “Wits Basin Scoping Study” which was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to the ASX on 09/03/2022 and
can be found on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially effects the information included in
the relevant market announcement. The form and context in which the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
5. The original report was “WBP’s Global JORC Mineral Resource Expands by 724,000oz to 4.28MOZ at 4.58 g/t Gold” which was issued with consent of the Competent Person, Mrs Cecilia
Hattingh. The report was released to the ASX on 3 December 2021 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 8.8MT at 4.60g/t for
1.449Moz measured, 11.3MT at 4.19g/t for 1.517Moz Indicated and 8MT at 5.10g/t for 1.309Moz inferred. The Company is not aware of any new information or data that materially
effects the information included in the relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market announcement.
PAGE | 22
ASX:WWI COPYRIGHT © 2025 ALL RIGHTS RESERVED
6. The original report was “Restated JORC Resource of 3.55Moz Au for Mining Right” which was issued with consent of competent persons Mr Hermanus Berhardus Swart, it was released
to the ASX on 23 July 2021 and can be found on the Company’s website (https://westwitsmining.com/). The company is not aware of any new information or data that materially
effects the information included in the relevant market announcement. The form & context in which the Competent Persons’ findings are presented have not been materially
modified.
7. The original report was “DFS Delivers Strong Results on 1st Stage of WBP Development” which was issued with consent of Competent Persons Mr. Andrew Pooley. The report was
released to the ASX on 02 September 2021 and can be found on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data
that materially effects the information included in the relevant market announcement. The form and context in which the Competent Person’s findings are presented have not been
materially modified
8. The original report was “Global Resource Grows by 428,000oz Au to 3.67Moz at Witwatersrand Basin Project” which was issued with consent of competent persons, Hermanus
Berhardus Swart & Dr Andrew J. Tunks and released to the ASX on 16th July 2018 and can be found on the Company’s website (https://westwitsmining.com/). All material
assumptions and technical parameters underpinning the estimates used to determine the Mineral Resource have not materially changed & the company is not aware of any new
information or data that materially effects the information included in the relevant market announcement. The form & context in which the Competent Persons’ findings are
presented have not been materially modified.
9. The original report was “Resource Increase to 3.26 Moz on Witwatersrand Basin Project” which was issued with consent of competent persons, Hermanus Berhardus Swart & Dr Andrew
J. Tunks and released to the ASX on 18th December 2017 and can be found on the Company’s website (https://westwitsmining.com/). All material assumptions and technical
parameters underpinning the estimates used to determine the Mineral Resource have not materially changed & the company is not aware of any