Updates to DFS Provide Improved Results for WBP
Released
Released
Announcement PDF
ASX Announcement and Media Release
23 July 2025
Updates to Qala Shallows DFS provide improved results for
Witwatersrand Basin Project
West Wits Mining Ltd (“ASX: WWI”, “OTCQB: WMWWF”, “WWI”, “West Wits”, or “the Company”) is
pleased to announce the positive results of an updated Definitive Feasibility Study (“DFS”) for its Qala
Shallows, part of the Witwatersrand Basin Project (“WBP”) in Johannesburg, South Africa.
BASE CASE HIGHLIGHTS – All Mineral Resources
➢ Project Financials:
o Revenue:
o Free Cashflow:
o Post-tax NPV7.5:
o Post- tax IRR:
US$2.7 billion, increase of US$983M (58%)
US$983M, increase of US$461M (88%)
US$500M, increase of US$246M (97%)
81% (2023: 53%)
➢ Peak Funding: US$44M over a 2.6-year period (2023: US$54M over a 3-year period)
➢ 8-month Payback Period from end of peak funding period (2022: 13-month) and 3.3years from commencement of development (2023: 4.1-years)
➢ 70,000oz pa Steady-State Production increased to 12-year period (2023: 9-years)
➢ Gold Production: 944,000oz (2.2% increase) over 16.8-year Life-of-Mine
(“LOM”)(2023: 17.7-year) with compressed mine life improving project economics.
➢ US$ 1,289/oz All-In-Sustaining-Cost (“AISC”) (2023: US$ 977/oz) with 14.3% of the
increase linked to the higher gold price assumption of US$ 2,850/oz (2023: US$
1,850/oz) which drives the 58% revenue increase. At the 2023 gold price assumption,
AISC reduces to US$ 1,149/oz due to lower Toll Processing fees and Government
Royalties which are linked to the gold price.
➢ 9.3% increase to Ore Reserves: 4.6 million tonnes at 2.60g/t for 383,900 oz Gold
TABLE 1: BASE CASE - KEY PRODUCTION METRICS FOR QALA SHALLOWS
QALA SHALLOWS – FINANCIAL EVALUATION*
Total Revenue
Total Free Cashflow
LOM C1 Cost
LOM All in sustaining Cost
Steady-State All in Sustaining Cost
Pre-Tax Net Present Value 7.5
Post-Tax Net Present Value 7.5
Pre-Tax Internal Rate of Return (%)
Post-Tax Internal Rate of Return (%)
Peak Funding
Peak Funding Period
Payback Period – from end of peak funding period
Payback Period – from start of development
*
JUN-231
US$ 1.7 billion
US$ 522M
US$ 818/oz
US$ 977/oz
US$ 871 /oz
US$ 367M
US$ 255M
61%
53%
US$ 54M
3 years
13 months
4.1 years
JUN-25
US$ 2.7 billion
US$ 983M
US$ 1 063/oz
US$ 1 289/oz
US$ 1 181/oz
US$ 719M
US$ 500M
93%
81%
US$ 44M
2.6 years
8 months
3.3 years
Including Inferred Resources
page i
ASX Announcement and Media Release
23 July 2025
West Wits Managing Director Rudi Deysel said, “The updated DFS for Qala Shallows has delivered a
compelling outcome, reinforcing the project’s robust value and strong economic fundamentals.
Notably, the peak funding requirement and payback period have reduced, while Free Cash Flow has
surged by US$461 million — an 88% uplift — bringing total projected Free Cash Flow to US$983 million.
With the benefit of a stronger gold price environment, the project’s valuation continues to strengthen,
providing shareholders with increased confidence in Qala Shallows’ capacity to deliver strong sustained
returns which is highlighted by a post-tax IRR of 81%. We remain focused on advancing the
Witwatersrand Basin Project and unlocking its full potential.”
EXECUTIVE SUMMARY
West Wits commissioned independent mining engineers, Bara Consulting (“Bara”), to undertake a
comprehensive review and update of the Qala Shallows Definitive Feasibility Study released in July
2023. At that time, the base case gold price used was US$1,850/oz and cut off grades for the
extraction of ore in the mine plan was 2 g/t based on an even lower gold price of US$1,750/oz.
Key components of the updated DFS include:
•
Inclusion of new gold price (US$ 2,850/oz) and FX assumptions (ZAR18 to US$1) based on
current Bloomberg consensus forecasts. The updated gold price assumption for the 2025 DFS
is substantially below current spot gold prices of over US$3,300/oz.
•
Revised CAPEX and OPEX numbers reflecting supplier contracts now finalised as opposed to
industry estimates. Using actual contracted numbers improves accuracy of the DFS outcomes.
•
An updated mine plan based on a 1.31g/t lower cut-off grade which is warranted given the
higher gold price environment compared to the 2023 DFS. The higher gold price allows for the
mining of ore previously not included in the mine plan. This has facilitated an increase to the
Ore Reserves, as well as accelerated and increased the production profile as more ore is
available for inclusion.
QALA SHALLOWS UPDATED MINE SCHEDULES
The DFS models two mine schedules updated in terms of JORC 2012 requirements:
1. Base Case – LOM plan which targets total Mineral Resources (Measured, Indicated and
Inferred Mineral Resources).
2. Ore Reserve – LOM Plan which targets Measured and Indicated Mineral Resources only
QALA SHALLOWS IMPROVED BASE CASE PRODUCTION SCHEDULE
Figure 1 below shows the updated Qala Shallows 2025 production profile indicating waste and ore
tonnes, as well as recovered gold production in ounces. The project has a steady-state gold production
of approximately 70,000 oz per annum for 12 years, an increase of 3 years.
page ii
ASX Announcement and Media Release
23 July 2025
FIGURE 1: QALA SHALLOWS BASE CASE - PRODUCTION PROFILE SHOWING THE WASTE AND ORE
MINING OVERLAID WITH THE RECOVERED OUNCE PROFILE OVER LOM
The 2025 mine plan update shows an improvement in production build up, as well as an increase in
the mining inventory when compared to the 2023 plan resulting from the inclusion of ore grading
below the 2023 2.0g/t cut-off. The increase in production is most prominent in the upper levels of the
mine plan during the production ramp up phase which has a significant positive impact on the peak
funding and payback period.
Figure 2 shows a Base Case production profile of the 2023 plan compared to the 2025 update.
FIGURE 2: BASE CASE - 2025 UPDATE VS 2023 LOM PLAN1
QALA SHALLOWS IMPROVED BASE CASE PRODUCTION DATA
Table 2 shows the highlights of the production data from the updated LOM plan. There is an increase
from the 2023 DFS plan regarding total ROM tonnage, as well as the maximum production rates and
gold produced.
(Table 1 outlining Section 4 Estimation and Reporting of Ore Reserves is in Appendix A. JORC Table 1
information for Sections 1, 2 and 3 as announced on 23 July 2021 is reproduced without change in
Appendix B for convenience of reference)
page iii
ASX Announcement and Media Release
23 July 2025
TABLE 2: BASE CASE - KEY PRODUCTION METRICS FOR QALA SHALLOWS
JUN-231
17.7 years
10.2M
839,000 pa
3.04 g/t Au
1,005,000 oz
92%
924,000 oz
JUN-25
16.8 years
10.7M
860,000 pa
2.98 g/t Au
1,026,000 oz
92%
944,000 oz
Average Annual Gold Production
51,000 oz
56,000 oz
Average Annual Steady State Gold Production (12yrs)
Max Gold Production (Year 6)
70,000 oz
75,000 oz
70,000 oz
75,000 oz
QALA SHALLOWS – PRODUCTION DATA*
Life-of-Mine (Construction to Relinquishment)
Total Production (Run of Mine Tonnes)
Max Production Rate (Tonnes)
Run-of-Mine Grade Au (Average)1
LOM Contained Au
Metallurgical Recovery Au (Overall)
Gold Produced
*
Includes Inferred Resources
The improved production data includes:
•
Re-calculation of cut-off grades based on revised gold price and operating cost information
•
Inclusion of additional Mineral Resources previously not accounted for in the LOM plan
QALA SHALLOWS ENHANCED FINANCIAL OUTCOME
Updated capital and operating cost estimates, along with the updated LOM plan, were used in the
updated DFS financial evaluation. Gold price and Foreign Exchange (USD / ZAR) assumptions have been
updated to more closely represent the current market prices and rates. Primary updates include:
•
Gold Price: US$2,850/oz (2023: US$1,850/oz)
•
Exchange Rate: ZAR 18.0 to US$ 1 (2023: ZAR 17.5 to US$ 1)
•
Toll Treating rate updated for variable pricing linked to gold price and current plant costs
•
New contractor rates based on executed contracts and new quotations (eg. mining contract,
equipment purchases, insurance premiums, etc.)
•
Updated labour costs for owner’s team based on new appointments
The Base Case financial evaluation improved when compared to the 2023 DFS, which is largely driven
by favourable movements in the Gold Price and USD / ZAR rate as well as an increase to production
volume with higher gold sales earlier in the life of mine.
Table 3 shows the financial evaluation of Qala Shallows, comparing the June 2023 DFS to the updated
June 2025’s figures contained in the DFS.
TABLE 3: BASE CASE - FINANCIAL EVALUATION OUTCOME
QALA SHALLOWS – FINANCIAL EVALUATION*
Total Revenue
Total Free Cashflow
LOM C1 Cost
LOM All in sustaining Cost
Steady-State All in Sustaining Cost
Pre-Tax Net Present Value 7.5
Post-Tax Net Present Value 7.5
JUN-231
US$ 1.7 billion
US$ 522M
US$ 818/oz
US$ 977/oz
US$ 871 /oz
US$ 367M
US$ 255M
JUN-25
US$ 2.7 billion
US$ 983M
US$ 1 063/oz
US$ 1 289/oz
US$ 1 181/oz
US$ 719M
US$ 500M
page iv
ASX Announcement and Media Release
23 July 2025
Pre-Tax Internal Rate of Return (%)
Post-Tax Internal Rate of Return (%)
Peak Funding
Peak Funding Period
Payback Period – from end of peak funding period
Payback Period – from start of development
*
61%
53%
US$ 54M
3 years
13 months
4.1 years
93%
81%
US$ 44M
2.6 years
8 months
3.3 years
Including Inferred Resources
The main highlights are:
•
Free Cashflow – 88% increase to US$983M
•
Post Tax NPV7.5 - 97% increase to US$500M
•
Post-Tax IRR – 55% increase to 82%
•
Peak Funding – 18.2% decrease to US$44M and reduction in the Peak Funding Period by 5
months to 2.6 years during mine development.
•
Payback Period – reduced to 8 months post Peak Funding Period.
The waterfall chart presented in Figure 3 shows that the most significant improvement to the financial
evaluation is attributed to revenue obtained by 54% increase in gold price. Operating Costs increased
due to the higher production volumes and the ZAR unit cost increased approx. 31% which was primarily
driven from higher processing costs from an increase plant costs and a variable component linked to
the higher gold price, other cost increases were largely in line with CPI increases over the 2-year period.
Cost increases were partially offset in USD terms by the 2.9% devaluation of the ZAR.
FIGURE 3: BASE CASE - WATERFALL CHART FOR NPV7.5 (ZAR'million)
page v
ASX Announcement and Media Release
23 July 2025
QALA SHALLOWS SENSITIVITY ANALYSIS
The sensitivity analysis in Table 4 shows that at a low gold price of US$1,850/oz, the project still has
strong financial outcomes which makes this a highly robust project
TABLE 4: BASE CASE - SENSITIVITY TO GOLD PRICE
Gold
Price
Post-Tax
Project
NPV7.5
Post-Tax
Project
NPV7.5
PostTax
Project
IRR
Operating
Margin
Peak Funding
Requirement
Peak Funding
Requirement
Payback
Period
USD/oz
1 850
2 350
2 850*
3 350
3 850
4 350
4 850
ZAR'm
3 484
6 211
9 004
11 732
14 486
17 258
20 006
USD'm
194
345
500
652
805
959
1 111
%
35
57
81
103
128
154
182
%
46
56
63
67
71
73
75
ZAR'm
1 418
1 103
800
671
566
497
430
USD'm
79
61
44
37
31
28
24
years
4.9
3.9
3.3
3.0
2.8
2.6
2.3
*Note: the sensitivity numbers reported for the US$2,850/oz gold price include a variable gold price for the
first 3 years based on the Bloomberg Consensus Forecast and as described above. All other sensitivities are
based on a constant gold price for the life of mine
Devaluation of the South African Rand compared to the United States Dollar presents further project
potential as demonstrated in Table 5, which outlines the sensitivity to exchange rate. This is largely
driven by the additional revenue realised by the project at higher ZAR/USD exchange rates, as most
project costs remain in South African Rand terms.
TABLE 5: BASE CASE- SENSITIVITY TO EXCHANGE RATE
Exchange
Rate
Post-Tax
Project
NPV7.5
Post-Tax
Project
NPV7.5
Post-Tax
Project IRR
Operating
Margin
Peak Funding
Requirement
Peak Funding
Requirement
Payback
Period
ZAR/USD
16.00
17.00
18.00
19.00
20.00
21.00
ZAR'm
7 245
8 116
9 004
9 873
10 743
11 629
USD'm
453
477
500
520
537
554
%
66
73
81
89
96
104
%
59
61
63
64
66
67
ZAR'm
968
884
800
731
688
645
USD'm
60
52
44
38
34
31
years
3.6
3.4
3.3
3.2
3.1
3.0
ORE RESERVE
A LOM plan and budget have been generated by the mine plan update and inclusion of actual costs in
the updated financial evaluation. The outcome of this exercise is positive and an improvement to the
2023 DFS with a 32,511oz (9.3%) increase in Ore Reserve to 383,934oz.
The work undertaken has been based on DFS level work, actual on-site activities linked to the Early
Works Program and update of costs to a June 2025 base date. It is therefore considered that the
previous Ore Reserve can be updated based on the updated 2025 life of mine plan. Table 6 outlines
the updated Ore Reserve.
page vi
ASX Announcement and Media Release
23 July 2025
TABLE 6: ORE RESERVE STATEMENT FOR QALA SHALLOWS (JORC 2012)
Ore Reserve
Category
Grand Totals
Proved
Probable
Total
Tonnage
Grade
Content
Content
(Mt)
1.11
3.49
4.60
(g/t)
2.79
2.54
2.60
(kg)
3,086
8,856
11,942
(oz)
99 205
284 730
383 934
Note: Totals may differ from the sum of individual numbers due to rounding in accordance with JORC Mineral
Resource and Ore Reserve Reporting.
PROJECT FUNDING & PROJECT UPDATE
The 2025 Base Case DFS estimates peak funding of US$ 44m (ZAR 800M) over a 31-month period (2.6years), a net decrease of US$10M and 3-months.
In June 2025, the Company executed definitive agreements for a senior syndicated loan facility
(“Facility”) of up to ZAR 875 million (~US$ 50 million) to fund the development of the Qala Shallows
Gold Project. The Facility is jointly provided by the Industrial Development Corporation of South Africa
Limited (“IDC”) and Absa Bank Limited, acting through its Corporate and Investment Banking Division
(together, “the Lenders”). The Lender’s modelling is based on the 2023 DFS mine plan, incorporates
interest expense on debt and utilises more conservative input assumptions in the funding financial
model including lower gold price assumption, higher contingency rate, Measured and Indicated
Minerals Resources only (no Inferred), etc. The Facility will be progressively drawn down upon
satisfaction of agreed conditions precedent and repayment will commence 24 months post-initial
drawdown, over a 36-month period.
In June 2025 the Company secured funding under the A$14M equity placement with part of the
proceeds used to commence mobilisation for pre-production works at Qala Shallows which included
delivery of the first Load-Haul-Dump (“LHD”) unit to site, signalling the movement of key equipment
into position. The mining contractor, Modi Mining, has been engaged and key personnel hires have
been completed, setting the stage for sustained construction and operational ramp-up in the coming
months.
IMAGE 1: LHD UNIT DELIVERED TO QALA SHALLOWS MARKING THE START OF MOBILISATION AS
WEST WITS MOVES INTO ACTIVE DEVELOPMENT
page vii
ASX Announcement and Media Release
23 July 2025
The Company continues to progress constructive discussions with Lender’s and prospective funders to
finalise optimum funding mix to develop the Qala Shallows Project.
Image 2 showcases Qala Shallow’s infrastructure. To date, operational activities at Qala Shallows have
successfully:
•
Completed all critical infrastructure, including substations and water infrastructure
•
Completed the decline and box cut rehabilitation
•
Completed on reef underground access
•
Delivered first ore (estimated stockpile of 3 000t) during an Early Works Program
IMAGE 2: QALA SHALLOWS PROJECT PROGRESS
NEXT STEPS
The Company will now focus on:
•
Securing the balance of Qala Shallows project funding requirement
•
Continue equipment purchases and mobilisation of contractors
•
Building up a 30,000-tonne gold ore stockpile to enable consistent gold ore delivery to
Sibanye-Stillwater’s plant for processing
•
Gradual mine build-up towards a steady-state production of 5,700 ounces of gold per
month
page viii
ASX Announcement and Media Release
23 July 2025
BARA CONSULTING TECHNICAL SUMMARY
INTRODUCTION
West Wits holds a mining right for the WBP located approximately 15 kilometres to the west of the
Johannesburg CBD in the Gauteng Province of South Africa. The WBP is made up of three Reef mining
targets which will be developed sequentially. During September 20212, West Wits completed a DFS
and maiden Ore Reserve Statement for the Qala Shallows Project. This study was updated in August
2022, June 2023 and again in June 2025 to include additional works completed and new information
obtained, including installation of infrastructure, underground survey data, contractor agreements and
market-based cost escalations, gold price and FX assumptions.
The Company is now in the process of implementing the Qala Shallows Project.
The technical summary below discusses the outcomes of the latest DFS and Ore Reserve update
completed in June 2025, with comparisons to the previous round of work completed in June 20231.
TENURE
West Wits holds a granted mining right (GP 30/5/1/2/2/10073 MR) for the WBP located approximately
15km west of the city of Johannesburg in the Gauteng Province of South Africa.
The Company executed a 99-year lease agreement with Calgro M3 in February 2022, acquiring a 16ha
footprint which provides sufficient land for the Qala Shallows site infrastructure and access to
underground development.
The land is currently zoned for mining and the Qala Shallows site is located between old mining dumps,
away from formal housing communities. The location of the infrastructure was included in the
Environmental Impact Assessment (“EIA”), as well as for the Integrated Water Use License (“WUL”).
GEOLOGY AND MINERAL RESOURCES
The geology, geotechnical and Mineral Resource assumptions used in the updated DFS remain
unchanged from those utilised in the 2021 DFS2.
The mineral resource shown in Table 7 is confined to the perimeter of the Mining Right and hence has
potential to be included in a mine plan, dependent on various other modifying factors.
TABLE 7: K9A & K9B REEF JORC (2012) COMPLIANT MINERAL RESOURCE2
K9A REEF JORC (2012) COMPLIANT MINERAL RESOURCE ESTIMATE2
Au
Au
sw
cw
Au
Tonnes
Resource Category
(Millions)
(MOz) (g/t) (cm) (cm) (cm.g/t)
Measured
2.1
0.31
4.54 112 108
508
Indicated
1.8
0.25
4.20 113 112
473
Measured and Indicated
3.9
0.55
4.38 112 110
492
Inferred
4.2
0.7
5.1
124
124
639
Grand Total
8.1
1.2
4.8
118
117
564
Note: Errors may occur due to rounding differences
Notes:
• Mineral Resource Estimate is inclusive of declared Ore Reserves
• Mineral Resources are reported in accordance with JORC (2012)
page ix
ASX Announcement and Media Release
23 July 2025
•
•
•
•
•
Cut-off values are reported applying a gold price of US$1500/oz and ZAR 15.00/1 US$
All Mineral Resources exclude geological structural loss
Any discrepancies in totals are due to rounding
CW: Channel Width
SW: Stoping Width
The following tonnage discount factors have been applied for unknown geological losses:
• 5% for the Measured Mineral Resource Category
• 10% for the Indicated Mineral Resource Category
• 15% for the Inferred Mineral Resource Category
Cut-off Grade: 2.0 g/t
Density: 2.73 t/m³
K9B REEF JORC (2012) COMPLIANT MINERAL RESOURCE ESTIMATE2
Au
Au
sw
cw
Tonnes
Resource Category
(Millions) (MOz) (g/t) (cm) (cm)
Measured
1.9
0.27 4.37 154 153
Indicated
6.2
0.83 4.14 162 162
Measured and Indicated
8.1
1.10 4.20 160 160
Au
(cm.g/t)
672
672
672
Inferred
2.4
0.4
5.5
123
123
675
Grand Total
10.5
1.5
4.5
150
149
673
Note: Errors may occur due to rounding differences
Notes:
• Mineral Resource Estimate is inclusive of declared Ore Reserves
• Mineral Resources are reported in accordance with JORC (2012)
• Cut-off values are reported applying a gold price of US$1500/oz and ZAR 15.00/1 US$
• All Mineral Resources exclude geological structural loss
• Any discrepancies in totals are due to rounding
• CW: Channel width
• SW: Stoping width
The following tonnage discount factors have been applied for unknown geological losses:
• 5% for the Measured Mineral Resource Category
• 10% for the Indicated Mineral Resource Category
• 15% for the Inferred Mineral Resource Category
Cut-off Grade: 2.0 g/t
Density: 2.73 t/m³
page x
ASX Announcement and Media Release
23 July 2025
MINE PLAN UPDATE
The integrated LOM plan created for the DFS update in June 2023 has been further updated in 2025
for the following:
• The cut-off grade has been re-calculated using updated gold price (US$2,850/oz), exchange
rates and mining costs. Technical parameters used in this calculation have remained
unchanged. The resultant cut-off grade is 1.31 g/t down from 2.0 g/t in 2023, this is mainly
driven by the significantly higher gold price used in the calculation.
• The application of a lower cut-off grade has resulted in the inclusion of additional Mineral
Resources previously not accounted for in the LOM plan as they were below the previous cutoff grade used in 2023.
Figure 4 shows the Base Case production profile of the 2023 plan compared to the 2025 update.
FIGURE 4: 2025 UPDATE VS 2023 BASE CASE LOM PLAN1
The 2025 mine plan update shows an improvement in production build up, as well as an increase in
the mining inventory when compared to the 2023 plan.
It is specifically noted that in undertaking the update to the mine plan, the mining method and mining
productivities used were left unchanged from those used in the 2021 DFS2 as well as the DFS update
completed in 20231. The only difference between the mining plans relates to the inclusion of some
additional mining areas due to reduction of the cut-off grade, mining sequence and timing.
The conventional breast mining in an underhand configuration is the optimal method for the Qala
Shallows deposit.
The stopes will be accessed by strike drives developed on the K9B Reef horizon and both K9A and K9B
stopes will be accessed from this infrastructure. The strike drives will connect to a decline system
developed from the existing Qala Adit box cut, which is located centrally in the mining area and in the
footwall of the K9B Reef.
Most of the mining will take place in a large unmined block of ground to the east of the property. There
will however also be limited mining of pillar remnants on the western side of the mining area. All
mining in the western areas will take place above the flooded historical workings and a water pillar will
be left between the eastern workings and the flooded areas to minimise pumping requirements.
Figure 5 shows a plan of a typical stope block.
page xi
ASX Announcement and Media Release
23 July 2025
FIGURE 5: PLAN OF STOPE BLOCK
Mining in the stope blocks will use standard conventional mining techniques widely used in South
Africa with the deployment of hand-held drills mounted on jack legs with cleaning using a scraper and
winch combination. Support will also be installed manually with a combination of rock bolts and
timber poles.
Development of the strike drives and decline will be with mechanised methods including drill rigs, LHDs
and ADTs deployed for drilling, face cleaning and hauling of blasted rock to the tips respectively.
To estimate the quality and quantity the Run-of-Mine (“ROM”) material that will be mined and
delivered to surface, various modifying factors will be applied to the in-situ Mineral Resource. These
modifications must consider anything that will impact the grade of the material and/or the tonnage of
material delivered to surface. In the case of Qala Shallows, the following modifying factors will be
included:
•
Estimation of any dilution that will be incurred in the mining process whether planned or
unplanned and adjustment of the grade and tonnage of the mined material accordingly
•
Estimation of any gold loss that may be incurred during the mining process (reduction in
grade)
•
Estimation of pay limit grades to ensure that only payable material is mined and delivered to
surface
•
Exclusion of any pillars that are required to be left in-situ for ground stabilisation purposes
•
Exclusion of any material that is not practical for economic or technical reasons
•
Application of a 5% ore tonnage loss due to inefficiencies in the mining process
The updated 2025 LOM schedule and inventory produced are shown in the figures and tabulations
below.
Figure 6 shows the updated Qala Shallows 2025 Base Case production profile indicating waste and ore
tonnes, as well as recovered gold production in ounces. The project has a steady-state gold production
of approximately 70,000 oz per annum for approximately 12 years, an increase of 3 years.
page xii
ASX Announcement and Media Release
23 July 2025
FIGURE 6: QALA SHALLOWS 2025 BASE CASE LOM PRODUCTION PROFILE
Figure 7 outlines additional detail of the first 60 months of the 2025 LOM schedule and the build-up
period to full production after 3 years.
FIGURE 7: QALA SHALLOWS BASE CASE 2025 PLAN PRODUCTION BUILD UP FIRST 60 MONTHS
Total Tonnage per Month [kt]
100
90
80
70
60
50
40
30
20
10
0
0
12
24
Stoping
Month
Ore Development
36
48
60
Waste
Based on the mine layout and the modifying factors discussed above a mine development and
production schedule was generated by calculating estimated mining productivities by excavation and
sequencing the layout in a logical order. All mine layouts and scheduling were undertaken in the
Deswik suite of mine design and scheduling software.
Key production schedule points of the 2025 plan are listed in Table 8.
page xiii
ASX Announcement and Media Release
23 July 2025
TABLE 8: SCHEDULE KEY POINTS 2025 PLAN
SCHEDULE KEY POINTS
First mining production from underground mine (Ore
Development)
First Stope production from underground mine
4 months
5 months
Measured and Indicated Resources
Sustainable full production
Full production sustained
Life-of-Mine
54,000t pm
4.0 years
11.3 years
All Mineral Resources
Sustainable full production
Full production sustained
Life-of-Mine
64,000t pm
12 years
16.8 years
Table 9 outlines production data highlights from the updated 2025 LOM plan. The table shows an
improvement from the 2023 DFS plan in regard to total ROM tonnage, as well as the maximum
production rates and gold produced as described above.
TABLE 9: UPDATED DFS PRODUCTION DATA 2025 PLAN (INCLUSIVE OF INFERRED
RESOURCES)
JUN-231
17.7 years
10.2M
839,000 pa
3.04 g/t Au
1,005,000 oz
92%
924,000 oz
JUN-25
16.8 years
10.7M
860,000 pa
2.98 g/t Au
1,026,000 oz
92%
944,000 oz
Average Annual Gold Production
51,000 oz
56,000 oz
Average Annual Steady State Gold Production (12yrs)
Max Gold Production (Year 6)
70,000 oz
75,000 oz
70,000 oz
75,000 oz
QALA SHALLOWS – PRODUCTION DATA*
Life-of-Mine (Construction to Relinquishment)
Total Production (Run of Mine Tonnes)
Max Production Rate (Tonnes)
Run-of-Mine Grade Au (Average)1
LOM Contained Au
Metallurgical Recovery Au (Overall)
Gold Produced
*
Includes Inferred Resources
Table 10 shows the production data profile for Measured and Indicated. The corresponding results
from the 2023 DFS are also stated with the variance between the two plans.
TABLE 10: RUN OF MINE INVENTORY 2025 PLAN (MEASURED AND INDICATED)
Resource category
(Updated – June 2025)
Measured
Indicated
Inferred
Totals
Tonnes (t)
Grade (g/t)
1,141,000
3,734,000
2.78
2.54
Au Content
(kg)
3,167
9,487
4,874,000
2.60
12,654
Au Content
(oz)
102,000
305,000
407,000
page xiv
ASX Announcement and Media Release
23 July 2025
Resource category
(June 2023)
Measured
Indicated
Inferred
Totals
Tonnes (t)
Resource category
(Variance)
Measured
Indicated
Inferred
Totals
Tonnes (t)
1 008 000
3 492 000
4 500 000
133,000
242,000
375,000
Grade (g/t)
2.93
2.62
2.69
Grade (g/t)
-0.15
-0.08
-0.09
Au Content
(kg)
2 949
9 135
12 084
Au Content
(oz)
95 000
294 000
389 000
Au Content
(kg)
218
352
570
Au Content
(oz)
7,000
11,000
18,000
Note: Totals may differ from the sum of individual numbers due to rounding.
It is specifically noted that the above inventory includes the Measured and Indicated Mineral
Resources only, Inferred Resources are excluded. However, the Inferred Mineral Resources are largely
located in areas that will be accessed by the primary development to access and mine the Measured
and Indicated Mineral Resources. Relatively limited additional development will be required to access
and mine the Inferred Mineral Resources in these areas and because of this, mine layouts and mining
inventories have also been developed for the Inferred Mineral Resources.
Table 11 outlines the mining inventory, including all Mineral Resource categories (Measured, Indicated
and Inferred) and accounting for all modifying factors as described above.
TABLE 11: RUN OF MINE INVENTORY 2025 PLAN (MEASURED, INDICATED AND INFERRED)
Resource category
(Updated - June 2025)
Measured
Indicated
Inferred
Totals
Tonnes (t)
Resource category
(DFS June 2023)
Measured
Indicated
Inferred
Totals
Tonnes (t)
Resource category
(Variance)
Measured
Indicated
Inferred
Totals
Tonnes (t)
1,141,000
3,734,000
5,836,000
10,711,000
1 008 000
3 492 000
5 778 000
10 278 000
133,000
242,000
58,000
433,000
Grade (g/t)
2.78
2.54
3.30
2.98
Grade (g/t)
2.93
2.62
3.32
3.04
Grade (g/t)
-0.15
-0.08
-0.01
-0.06
Au Content
(kg)
3,167
9,487
19,268
31,922
Au Content
(oz)
102,000
305,000
619,000
1,026,000
Au Content
(kg)
2 949
9 135
19 156
31 240
Au Content
(oz)
95 000
294 000
616 000
1 004 000
Au Content
(kg)
218
352
112
682
Au Content
(oz)
7,000
11,000
4,000
22,000
Note: Totals may differ from the sum of individual numbers due to rounding.
page xv
ASX Announcement and Media Release
23 July 2025
Note that in both tables, including and excluding Inferred Mineral Resources, there is an increase in
tonnages and gold produced over the LOM. The LOM grade has only very minor variation between the
two plans.
Figures 8 and 9 show production profiles for the Measured and Indicated and All Mineral Resources
respectively, as well as t
Share your feedback