ASX Announcement and Media Release
Friday, 3 October 2025
West Wits Mining Presentation
Munich Germany | Munich Mining Conference
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) is pleased to advise that Managing Director,
Rudi Deysel will be attending and presenting at the Munich Mining Conference held 3-4 October 2025.
The presentation will take place on in person on Friday 3rd
October at 4:30pm (CEST), a copy of the
Investor Presentation is attached. The presentation highlights the progress of the company at the Qala
Shallows, the Company’s flagship South African Witwatersrand Basin gold project, including recent
funding.
Approved for release by the Company Secretary.
For further information, contact our Media and Investor Relations:
Keith Middleton - keith@middletoncorporate.com.au
Jessica Lee Fertig – jessica@taumediau.com.au
General
info@westwitsmining.com
westwitsmining.com
linkedin.com/company/west-wits-mining
ABOUT WEST WITS MINING LIMITED
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) is focused on the exploration, development and
production of high-value precious and base metals for the benefit of shareholders, communities and
environments in which it operates. Witwatersrand Basin Project, located in the proven gold region of Central
Rand Goldfield of South Africa, boasts a 5.025Moz gold project at 4.66g/t1
.
1. The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with
consent of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on
16 December 2024 and can be found on the Company’s website (https://westwitsmining.com/).
Comprising 10.7MT at 4.60g/t for 1.595Moz measured, 12.29MT at 4.19g/t for 1.70Moz Indicated and
10.49MT at 5.10g/t for 1.73Moz inferred. The Company is not aware of any new information or data that
materially effects the information included in the relevant market announcement and, in the case of
Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning
the estimates in the relevant market announcement continue to apply and have not materially changed.
The form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
ASX:WWI
Qala Shallows, Witwatersrand Basin Project, Gauteng
Mining District, Johannesburg, South Africa
COPYRIGHT ©2025 ALL RIGHTS RESERVED
WEST WITS MINING
MUNICH MINING CONFERENCE
| ASX:WWI
SOUTH AFRICA | NEAR-TERM GOLD PRODUCER
PAGE | 2
ASX:WWI
FORWARD-LOOKING STATEMENTS
This presentation includes “forward-looking statements” as that term within the meaning of securities laws of
applicable jurisdictions. Forward-looking statements involve known and unknown risks, uncertainties and other
factors that are in some cases beyond West Wits Mining Limited’s control. These forward-looking statements
include, but are not limited to, all statements other than statements of historical facts contained in this
presentation, including, without limitation, those regarding West Wits Mining Limited’s future expectations.
Readers can identify forward-looking statements by terminology such as “aim,” “anticipate,” “assume,”
“believe,” “continue,” “could,” “estimate,” “expect,” “forecast,” “intend,” “may,” “plan,” “potential,”
“predict,” “project,” “risk,” “should,” “will” or “would” and other similar expressions. Risks, uncertainties and
other factors may cause West Wits Mining Limited’s actual results, performance, production or achievements
to differ materially from those expressed or implied by the forward-looking statements (and from past results,
performance or achievements).
These factors include, but are not limited to, the failure to complete and commission the mine facilities and
related infrastructure in the time frame and within estimated costs currently planned; variations in global
demand and price for gold fluctuations in exchange rates between the U.S. Dollar, South African Rand and
the Australian Dollar; the failure of West Wits Mining Limited’s suppliers, service providers and partners to fulfil
their obligations under construction, supply and other agreements; unforeseen geological, physical or
meteorological conditions, natural disasters or cyclones; changes in the regulatory environment, industrial
disputes, labour shortages, political and other factors; the inability to obtain additional financing, if required,
on commercially suitable terms; and global and regional economic conditions. Readers are cautioned not to
place undue reliance on forward-looking statements. The information concerning possible production in this
announcement is not intended to be a forecast. They are internally generated goals set by the board of
directors of West Wits Mining Limited. The ability of the Company to achieve any targets will be largely
determined by the Company’s ability to secure adequate funding, implement mining plans, resolve logistical
issues associated with mining and enter into any necessary off take arrangements with reputable third parties.
Although West Wits Mining Limited believes that its expectations reflected in these forward-looking statements
are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual
results will be consistent with these forward-looking statements.
The production target and financial forecasting reported under the Qala Shallows Definitive Feasibility Study
(DFS) contain inferred mineral resources. The directors confirm that it is reasonable to include these inferred
mineral resources having regard to the location and geology of the project in the well understood and
researched structure of the Witwatersrand Basin and the views provided to WWI by independent geological
expert consultants.
COMPETENT PERSON STATEMENTS
The original report was “Updates to DFS provide Improved Results for WBP” which was issued with consent of
the Competent Person, Mr. Jim Pooley. The report was released to the ASX in July 2025 and can be found on
the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or
data that materially effects the information included in the relevant market announcement and, in the case
of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning
the estimates in the relevant market announcement continue to apply and have not materially changed. The
form and context in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent
of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on 16 December
2024 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at
4.60g/t for 1.595Moz measured, 12.29MT at 4.19g/t for 1.70Moz Indicated and 10.49MT at 5.10g/t for 1.73Moz
inferred. The Company is not aware of any new information or data that materially effects the information
included in the relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all
material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
DISCLAIMER
Significant gold resource - 5Moz Gold
(65% measured & indicated)1
WBP - Project 200 - significant growth
opportunity aimed to produce
200 000oz Gold per annum
Qala Shallows (Stage 1) – Robust DFS
17yr Life-of-mine for 944,000oz
70,000oz p/a steady-state production for
12 years2
Experienced international board and
management team
Existing Cash & Loan Facilities
to Fund Qala Shallows
Development & Production
Qala Shallows – Turn-key ready: fully
licensed, site infrastructure maintained; key
supplier contracts secured
Funding – Executed Loan Documents for
ZAR 875M (~USD 50M) senior debt
syndicated loan facility
Qala Shallows – Cost-effective toll treat
agreement with Ezulwini Mining
Company/ Sibanye-Stillwater subsidiary
Why invest in West Wits
Witwatersrand Basin Project (WBP) - South Africa
ASX: WWI | OTBCQB: WMWWF
Qala Shallows - DFS
Post Tax IRR 81% & NPV7.5 US$500M
@ US$2,850/oz gold price2
PAGE | 4
ASX:WWI
Transforming into mid-tier gold producer
CAPITAL STRUCTURE (ASX:WWI)
Shares on issue
Listed Options (Exercise Price 3.85c, expiring 5th Sep-27)
Unlisted Options (exercise price range 2.2c – 25c)*
Performance Rights
Convertible Notes^
3.83B
339M
83.5M
7.5M
2
Market Capitalisation
@ 4.9c per share (on 02/10/2025)
A$188M
Cash – 30/09/2025 A$16.7M
Enterprise Value per MRE Ounce A$34/oz
JORC Mineral Resource Estimate1 (Gold)
includes declared Ore Reserves
5Moz
CORPORATE SNAPSHOT
^ Convertible Notes (CN) with a A$25,000 Face Value, convertible to WWI shares at the
lower of 2c or a 20% discount to the 15-day VWAP until the notes expire on 16/10/26. The
CN is free and unsecured
PAGE | 5
ASX:WWI
Experienced
analyst who
founded Far East
Capital Limited, a
specialist company
financier and
corporate adviser
in the mining
sector. Was the
founding Executive
Chairman of
Canaccord
Genuity Australia
Mining Engineer
with MBA,
operations and
project experience
in SA, DRC and
Zimbabwe. Surface
and underground
mine management
expertise in base
and precious
metals. Strong
background in mine
technical services
and executive
management
BOARD & EXECUTIVE TEAM
ASX-experienced
commercial lawyer
with extensive
involvement in assisting
and advising publicly
listed mining
companies globally.
Non-Executive Director
of ASX-listed
companies and serves
on the boards of
several unlisted
companies
MICHAEL QUINERT
Chairman (AUS)
JAC VAN
HEERDEN
Non-Exec Dir
(SA)
WARWICK
GRIGOR
Non-Exec Dir
(AUS)
SIMON WHYTE
CFO / Company
Secretary (AUS)
Chartered Accountant
and Associate Member of
the Governance Institute
of Australia with
experience in mining,
commodities and logistics,
including global majors,
Ernst & Young and BP
Australia. Expertise in
managing business
transformation and
integration projects
RUDI DEYSEL
CEO (SA) / MD
Mining Eng. with
Geophysics and MBA.
Production experience in
conventional narrow
tabular underground,
open-cast mining and
various commodities
including Gold, PGMs,
Copper and
Cobalt. Previous
experience includes Anglo
American and Galiano
Gold
TOZAMA KULATI
SIWISA
Exec Dir/Head of
Corp Affairs (SA)
BCom with an MBA
with extensive
experience in ESG
management and
leading
transformation
projects from
development to
execution.
Previously head of
stakeholder
relations at Lonmin.
2025 AAMEG Rising
Star Award winner
KEITH
MIDDLETON
Non-Exec Dir
(AUS)
Company director
with significant
experience in capital
markets, strategy and
mining operations in
Australia, North
America and South
Africa. Previously
founding MD of
American Rare Earths
and NED in ASX listed
resource companies
Redbank Copper
and Advance Metals
PAGE | 6
ASX:WWI
QALA SHALLOWS - DFS FINANCIAL MODEL & FUNDING2
DFS - Financial Evaluation
GOLD PRICE
US$2,850/oz
GOLD PRICE
US$3,850/oz
Peak Funding US$44m US$31m
Payback Period
(from end of peak funding)
8 months n/a
Payback Period
(from commencement)
3.3 years 2.8 years
Post-Tax NPV (7.5%)
US$500m
*(A$766m)
$805m
*(A$1.2b)
Post-Tax Internal Rate of Return 81% 128%
KEY FINANCIAL METRICS – DFS Base Case US$2,850/oz
DEFINITIVE FEASIBILITY STUDY
▪ Post-Tax Free Cashflow of US$983m over Life-of-Mine
▪ AISC cost in lowest quartile at US$1,289/oz (LOM)
▪ Post-Tax - NPV7.5 US$500m and IRR 81%
▪ Optimised DFS released 23 July 2025
PEAK FUNDING REQUIREMENT
▪ US$44m (DFS) with 8 months payback from end of peak funding period (2.6yrs)
▪ Peak funding substantially reduced at prevailing Gold Price due to higher
revenues from production during the 2.6-year mine development phase
▪ At a Gold Price (US$3,850/oz), peak funding reduces to US$31M
SECURED PROJECT FUNDING TO TAKE QALA SHALLOWS INTO PRODUCTION
▪ AUD 18.1M Cash Balance
▪ USD 12.5M Nebari Loan Facility
▪ Executed Senior Debt syndicated loan facility of up to ZAR 875 million (~USD 50
million) with two leading South African financial institutions
DFS - Financial Evaluation GOLD PRICE US$2,850/oz
Total Revenue US$2.7b
Total Free Cashflow US$983m
LOM C1 Cost US$1,063/oz
AISC – Life of Mine US$1,289/oz
AISC – Steady State US$1,181/oz
Pre-Tax Internal Rate of Return 93%
* USD converted to AUD at 1.53
Note: the DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is
reasonable to include these inferred mineral resources in the well-understood and researched structure of the Witwatersrand
Basin and the views provided to WWI by independent geological expert consultants, given the project’s location and geology.
PAGE | 7
ASX:WWI
RUN OF MINE INVENTORY
▪ 1.03Moz Gold at 3.0g/t, inclusive of Ore Reserves
▪ Ore Reserves – 4.6Mt at 2.60g/t for 384,000 oz gold,
(37% of the mining inventory)
▪ First 7 years of production: Reserves comprise >75% of
mining inventory
▪ Ongoing underground drilling to convert Resources to
Reserves as decline development progresses
▪ Mine Plan cut-off grade at 1.31g/t is calculated using
a gold price of US$2,850/oz and ZAR 18.00/1 US$
Note: the DFS and any production target under the DFS contain inferred mineral resources. The
directors confirm that it is reasonable to include these inferred mineral resources in the well-
understood and researched structure of the Witwatersrand Basin and the views provided to WWI
by independent geological expert consultants, given the project’s location and geology.
QALA SHALLOWS - MINING INVENTORY & ORE RESERVE2
RUN OF MINE INVENTORY (INCLUSIVE OF ORE RESERVES) 2
Mineral Resource
Estimate Category
Tonnage
(Mt)
Grade
(g/t)
Content
(kg)
Content
(oz)
Measured 1.4 2.78 3 167 102 000
Indicated 3.7 2.54 9 487 305 000
Inferred 5.8 3.30 19 268 619 000
Grand Total 10.7 2.98 31 922 1 026 000
PAGE | 8
ASX:WWI
QALA SHALLOWS - MINING PLAN
Trackless development with conventional stoping
– tried and tested
▪ Ore body access from surface via existing decline system
▪ Stopes accessed via strike drives on the K9B reef horizon
▪ Mechanised mining methods with drill rigs, LHDs and ADTs
▪ Conventional mining methods with handheld drills & cleaning
using a scraper - winch combination
▪ Focus on large unmined block of ground on east of property
▪ Stoping will commence from 35m below surface to 850m depth
▪ Limited waste rock stockpiled on site
▪ Ore trucked ~40km to existing processing plant under Toll
Agreement with Sibanye Stillwater
Stage 3
Stage 4
Stage 1 - DFS
Stage 2
PAGE | 9
ASX:WWI
QALA SHALLOWS - PRODUCTION SCHEDULE
• DFS (Stage 1) completed: 944,000oz gold @ AISC
US$1,289/oz
• Initial production: build 30,000T ore stockpile
to facilitate delivery of 15,000T/m to Sibanye-Stillwater’s
plant
• Targeting achievement of the stockpile within 6 to 8
months from start of production
• Production ramps up to steady-state 65,000T/m
• Gradual mine build-up to steady-state: 70,000 oz gold/
year @ AISC US$1,181/oz
Note: the DFS and any production target under the DFS contain inferred mineral resources. The
directors confirm that it is reasonable to include these inferred mineral resources in the well-
understood and researched structure of the Witwatersrand Basin and the views provided to WWI by
independent geological expert consultants, given the project’s location and geology.
Updated DFS completed in July 2025 by Bara Consulting2
MINING SCHEDULE & GRADE
GOLD PRODUCTION
PAGE | 10
ASX:WWI
GLOBAL MINERAL RESOURCE ESTIMATE (JORC 2012)1
Category Tonnage (Mt) Grade (g/t) Content (oz)
Measured 10.07 4.60 1 595 000
Indicated 12.29 4.19 1 700 000
Measured &
Indicated
23.00 4.45 3 295 000
Inferred 10.49 5.10 1 730 000
Total 33.49 4.66 5 025 000
▪ Significant global Mineral Resource Estimate of
5Moz Gold @ 4.66 g/t Au1
▪ High confidence level with 65% of MRE in Measured
& Indicated categories
▪ 3 distinct reef horizons: Kimberley Reef; Bird Reef;
Main Reef (right image)
▪ Well-understood geology, mineralisation &
metallurgy
▪ Additional area under application
WWI – GOLD RESOURCES
PAGE | 11
ASX:WWI
▪ 2022 Scoping Study: 5 Development stages; Stages 1 – 4
Gold Projects (27-year LoM)4
▪ Stage 1 (Qala Shallows) - DFS complete (17-year LoM)2
▪ Adjacent PR granted; additional PR application
approved (awaiting regulator confirmation)
▪ Stage 5 (BRC): potential standalone Gold & Uranium
project.
WBP – LOCATION & GROWTH POTENTIAL
Image: Mining Right (blue); Prospecting Right Granted (yellow)& PR Application (red)
5. BIRD REEF
CENTRAL (BRC)
Gold & Uranium
JOHANNESBURG CBD
SANDTON CBD
PAGE | 12
ASX:WWI
WBP - MRE & ORE RESERVE GROWTH
0.35
0.81
1.26 1.30 1.31
1.73 1.73
0.57
1.24
1.00
1.38 1.31
1.44 1.42
0.30
1.21
1.42 0.60
1.37
1.51 1.49
-
-
-
0.28
0.29
0.35 0.38
-
1
2
3
4
5
6
JAN-16 DEC-17 JUL-18 SEP-21 DEC-21 DEC-24 JUL-25
GOLD
OUNCES
(MILLION)
Dec-17
Upgrade:
400 -1,500m
on
Kimberley
Reefs9
Jul-18
Addition to
of K9B Reef8
Sept-21
DFS with
declared
maiden Ore
Reserve7
Dec-21
Bird Reef &
Main Reef
Upgrade to
1,000m depth5
Dec-24
Boost with
New
Prospecting
Right
Granted1
Jan-16
Maiden MRE -
400M depth3
Inferred Indicated Measured Ore Reserves
WBP tenement area
previously held by DRD Gold
which had a Historical MRE
declared (2000 ASX Report) of
12.8Moz at 4.6g/t Gold under
the previous JORC Code3.
WWI has progressively grown
the MRE under the 2012 JORC
Code to over 5Moz @
4.66g/t.1
The Company has grown
declared Ore Reserves to
384koz.2
Jul-25
DFS updated
with
US$2,850/oz
gold price &
ZAR18:$1 FX
rate2
PAGE | 13
ASX:WWI
TARGETING FIRST GOLD POUR Q1 2026
2024 2025E 2026E 2027E 2028E
H1 H2 H1 H2 H1 H2 H1 H2
Progress completion of Project Finance package
Mobilise mining contractors
Commission underground mine development
Build 30,000t stockpile & start deliveries to Sibanye
First gold pour
EPCM contract works – major surface infrastructure
UG level access via decline development LVL 1 LVL 2 LVL 3 LVL 4 LVL 5
Ongoing UG sampling to grow Ore Reserves
Ramp up of gold production to 70,000oz pa Steady-State2
Note: the DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is
reasonable to include these inferred mineral resources in the well-understood and researched structure of the Witwatersrand
Basin and the views provided to WWI by independent geological expert consultants, given the project’s location and geology.
PAGE | 14
ASX:WWI
KEY MILESTONES DRIVING VALUE
2021
2025
✓ Mining Right granted with 3.5Moz gold MRE8
✓ Revised Scoping Study on Stages 1 – 45
✓ Early Works completed: surface infrastructure & UG access
✓ Toll Processing Agreement secured with Sibanye Stillwater
✓ MRE increased to 5Moz Gold1
✓ Execute legal documents on US$50M Sr. Loan Facility
✓ Updated Qala Shallows DFS - US$500M Post-Tax NPV7.5 ; 351koz
Reserves & AISC US$977/oz10 (Jun-25)
✓ Project ownership increased to 74% via BEE Buy-Back (Aug-25)
✓ Project Finance package secured (Sep-25)
✓ Qala Shallows site Mobilisation complete (Sep-25)
❖ First ore production via completed early works
development (Oct-25)
❖ Prospecting Right Application to extend WBP footprint
(2025)
❖ First Gold Pour from Sibanye’s Ezulwini Plant (Mar-26)
❖ Production ramp up via decline development (2026-27)
❖ Steady-state production: 70,000/oz pa for 12 years2 (from
2028)
Milestones Catalysts
PAGE | 15
ASX:WWI
COMPLETION OF QALA SHALLOWS MOBILISATION
PAGE | 16
ASX:WWI
WBP ENVIRONMENTAL, SOCIAL & GOVERNANCE (ESG)
ENVIRONMENTAL STEWARDSHIP & BIODIVERSITY CONSERVATION
▪ Underground operation: Low noise and dust levels
▪ Small surface footprint: Minimal rehab & impact
▪ Efficient water use model: Minimal usage & zero effluent discharge
SOCIAL POSITIVE IMPACT OF HOST COMMUNITIES
▪ Local Economic Development Programme: Community wards forum in
collaboration with City of Joburg
▪ Local procurement: Sourced from BEE database
▪ Social & Labour Plan: Beneficiary Learnership Programmes
GOVERNANCE RESPONSIBLE PRODUCTION PRACTICES
▪ Corporate Governance Compliant with evolving regulations
▪ Mine Health & Safety Conforms to Act 29 of 1996
▪ Zero Harm Health & Safety approach
▪ Transparent Stakeholder Engagement
PAGE | 17
ASX:WWI
AUSTRALIA
Level 6, 400 Collins Street
Melbourne, Victoria
Australia
3000
INVESTOR RELATIONS
Keith Middleton
keith@middletoncorporate.com.au
SOUTH AFRICA
Unit 8A, Sifon Industrial Park
279 Sifon Street, Robertville
Roodepoort
1709
westwitsmining.com | info@westwitsmining.com
CHIEF EXECUTIVE OFFICER
Rudi Deysel
rdeysel@westwitsmining.com
Qala Shallows Box Cut
COPYRIGHT ©2025 ALL RIGHTS RESERVED
PAGE | 18
ASX:WWI
EXPERIENCED MANAGEMENT TEAM
MARTIN BEVENLANDER
Head of Geology &
Exploration (SA)
Geologist with expertise
that spans across the
entire mining cycle from
greenfield exploration,
and project
development to
production. Worked in
Indonesia, Papua New
Guinea, Australia and
across Africa
LINDIWE MAGIDIMISA
Projects & Business
Development
Manager (SA)
BSc Chemical
Engineering, PGDip
Industrial Engineering,
and MBA. Experience
spans multiple business
functions, including
Capital Assurance,
Capital Projects, Business
Improvement, and
serving as Chief of Staff in
CEO’s office at De Beers
CGMA, ACMA, AMDP with
BCom (Hons) in
Management and Financial
Accounting. Financial
strategist with track record
in cost transformation and
operational efficiency.
Previous experience
includes Petra Diamonds
and Anglo American
ARNOLDUS LUDICK
General Manager
Finance and Admin
(SA)
SIFISO MAGWAZA
Mine Manager (SA)
Mining Engineer with
experience managing
large, diverse teams in
mining operations, from
shallow underground
mining to deep level gold
mining, operational
expansions, as well as
Brownfields across gold,
platinum, copper, iron
and manganese. Formerly
with Impala, Glencore,
Palabora, South32 and
Harmony Gold
APPENDIX 1: ORE RESERVE & MINERAL RESOURCE ESTIMATE STATEMENTS
Table 1: WBP (JORC) Ore Reserve2 Declared Ore Reserve of 4.6MT at 2.6g/t for 383,934oz Gold2
Ore Reserve Notes:
1. No Inferred Mineral Resources are included in the Ore Reserves.
2. The evaluation used a gold price US$2,850 per ounce and a rate of exchange of R18.0 / US$ 1.
WBP’s Global Mineral Resource is made up of several gold bearing reefs across the mining right
area, a breakdown by reef and MRE category is detailed in Table 21.
MRE Notes:
1. Global MRE set at a 2.0g/t Au cut-off. Reported in accordance with the JORC Code of 2012.
2. Number differences may occur due to rounding errors.
3. Mineral Resources are reported as inclusive of Ore Reserves.
4. The Inferred Mineral Resources have a high degree of uncertainty, and it should not be assumed that all
or a portion thereof will be converted to Ore Reserves.
REFER TO SLIDE 10 FOR QALA SHALLOWS MINE INVENORY TABLE – 1Moz
Table 2: WBP (JORC) Mineral Resource Estimate – by Reef (2g/t cut-off)1
ASX: WWI | OTBCQB: WMWWF
ORE RESERVE STATEMENT FOR QALA SHALLOWS (JORC 2012)
ORE Reserve
Category
Tonnage
(Mt)
Grade
(g/t)
Content
(kg)
Content
(oz)
Proved 1.1 2.79 3 086 99 205
Probable 3.49 2.54 8 856 284 730
Total 4.6 2.60 11 942 383 934
Reef
Measured Indicated Inferred Total
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Bird – Central & West 0.04 3.73 0.00 0.89 2.51 0.07 0.44 2.86 0.04 1.38 2.66 0.12
Bird – East 2.22 4.30 0.31 2.00 4.74 0.30 0.42 4.48 0.06 4.63 4.51 0.67
K9B KRC 0.00 2.98 0.00 0.10 3.87 0.01 0.18 4.22 0.02 0.28 4.08 0.04
K9B KRE 1.93 4.37 0.27 6.21 4.14 0.83 2.35 5.51 0.42 10.50 4.49 1.52
K9A KRE 2.10 4.54 0.31 1.82 4.20 0.25 4.20 5.14 0.69 8.11 4.77 1.25
K9B KRE (PR 10730) 0.31 5.18 0.05 0.54 5.92 0.10 1.46 5.18 0.24 2.31 5.35 0.40
K9A KRE (PR 10730) 0.59 4.95 0.09 0.50 5.01 0.08 1.05 5.27 0.18 2.14 5.12 0.35
Main Reef Leader 0.72 5.81 0.14 0.15 8.34 0.04 0.09 7.54 0.02 0.96 6.36 0.20
Main 2.79 4.73 0.42 0.09 5.15 0.01 0.31 5.27 0.05 3.19 4.79 0.49
Total 10.70 4.60 1.59 12.29 4.19 1.70 10.49 5.10 1.73 33.49 4.66 5.03
Note: errors may occur due to rounding differences
Note: errors may occur due to rounding differences
PAGE | 20
ASX:WWI
APPENDIX 2 - REFERENCES
1. The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to
the ASX on 16 December 2024 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at 4.60g/t for 1.595Moz measured, 12.29MT at 4.19g/t for 1.70Moz
Indicated and 10.49MT at 5.10g/t for 1.73Moz inferred. The Company is not aware of any new information or data that materially effects the information included in the relevant market
announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The form and context in which the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
2. The original report was “Updates to DFS provide Improved Results for WBP” which was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to the ASX on 23 July
2025 and can be found on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially effects the information included in the
relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The form and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement. The DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is reasonable to include these inferred mineral
resources in the well-understood and researched structure of the Witwatersrand Basin and the views provided to WWI by independent geological expert consultants, given the project’s location and
geology.
3. The original report was “Updated Mineral Resource Estimate for the Soweto Cluster” which was issued with consent of competent persons Mr. Hermanus Berhardus Swart, it was released to the ASX
on 22 January 2016 and can be found on the Company’s website (https://westwitsmining.com/). The company is not aware of any new information or data that materially effects the information
included in the relevant market announcement. The form & context in which the Competent Persons’ findings are presented have not been materially modified.
4. The original report was “Wits Basin Scoping Study” which was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to the ASX on 09/03/2022 and can be found
on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially effects the information included in the relevant market
announcement. The form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
5. The original report was “WBP’s Global JORC Mineral Resource Expands by 724,000oz to 4.28MOZ at 4.58 g/t Gold” which was issued with consent of the Competent Person, Mrs Cecilia Hattingh. The
report was released to the ASX on 3 December 2021 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 8.8MT at 4.60g/t for 1.449Moz measured, 11.3MT at
4.19g/t for 1.517Moz Indicated and 8MT at 5.10g/t for 1.309Moz inferred. The Company is not aware of any new information or data that materially effects the information included in the relevant
market announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The form and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement.
6. The original report was “Restated JORC Resource of 3.55Moz Au for Mining Right” which was issued with consent of competent persons Mr Hermanus Berhardus Swart, it was released to the ASX on 23
July 2021 and can be found on the Company’s website (https://westwitsmining.com/). The company is not aware of any new information or data that materially effects the information included in
the relevant market announcement. The form & context in which the Competent Persons’ findings are presented have not been materially modified.
7. The original report was “DFS Delivers Strong Results on 1st Stage of WBP Development” which was issued with consent of Competent Persons Mr. Andrew Pooley. The report was released to the ASX
on 02 September 2021 and can be found on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially effects the information
included in the relevant market announcement. The form and context in which the Competent Person’s findings are presented have not been materially modified
PAGE | 21
ASX:WWI
APPENDIX 2 – REFERENCES continued
8. The original report was “Global Resource Grows by 428,000oz Au to 3.67Moz at Witwatersrand Basin Project” which was issued with consent of competent persons, Hermanus Berhardus Swart & Dr
Andrew J. Tunks and released to the ASX on 16th July 2018 and can be found on the Company’s website (https://westwitsmining.com/). All material assumptions and techn