Quarterly Activity Report
Reporting Period 1 April – 30 June 2025
HIGHLIGHTS
➢ West Wits has executed definitive agreements for a senior syndicated loan facility of ZAR
875 million (~USD 50 million).
➢ Commissioned the update of the 2023 Qala Shallows Definitive Feasibility Study with
results released in July 2025 (post-period) with substantially improved economics which
include1:
o Free Cashflow: US$983M, increase of US$461M (88%)
o Post-tax NPV7.5: US$500M, increase of US$246M (97%)
o Post- tax IRR: 81% (2023: 53%)
o Peak Funding: US$44M over a 2.6-year period and 8-month Payback Period from end
of peak funding period
o Gold Production: 944,000oz over 16.8-year Life-of-Mine at an AISC of US$1,289/oz
o Steady State Production: 70,000oz pa over 12-year period at an AISC of US$1,181/oz
➢ Mobilisation at Qala Shallows has commenced to prepare for ore extraction as part of the
mine development works.
➢ Agreement reached to buy back 10% of West Wits (SA) Pty Ltd (“WW SA”) from the minority
shareholder, increasing the West Wits interest in the Witwatersrand Basin Project to 74%.
SOUTH AFRICA
WITWATERSRAND BASIN PROJECT (“WBP”), GAUTENG, SOUTH AFRICA
The June 2025 quarter was a defining period for West Wits Mining Limited (ASX: WWI; OTCQB:
WMWWF; “West Wits” or “the Company”) with significant financial, operational and corporate
milestones achieved to drive the Qala Shallows Gold Project, the first stage of the 5.02Moz2
Witwatersrand Basin Project (“WBP”) into active mobilisation and delivery.
PROJECT FUNDING - ZAR 875 Million Senior Syndicated Loan Facility
West Wits executed definitive agreements for a senior syndicated loan facility of ZAR 875 million
(~US$50 million), jointly provided by the Industrial Development Corporation of South Africa (“IDC”)
and Absa Bank Limited (“Absa”). This facility accounts for ~55% of the total project funding, with the
remaining balance covered by equity contributions and early operational revenues. Drawdowns will
be milestone-based, with repayments commencing 24 months after the first drawdown over a 36month period. Importantly, 100% mandatory hedging has been arranged through put options,
providing downside price protection while retaining the full upside of the gold price.
MOBILISATION OF QALA SHALLOWS
Qala Shallows has transitioned from planning to active mobilisation. The mine was officially re-opened
and declared safe in June 2025, marking the start of a structured three-month mobilisation phase.
Key Supplier Contracts Executed
West Wits executed all major supplier contracts needed to enter the mobilisation phase:
•
Engineering, Procurement and Construction Management (“EPCM”): The contracts were
finalised with Bara Consulting and Solrock Mining Services JV and an experienced EPCM Project
Manager was onboarded in May 2025 having conducted preliminary planning and design work
since Q1 2025. The EPCM team is scaling progressively in line with the project's evolving needs.
page i
ASX Announcement and Media Release
28 July 2025
•
Mining Contractor: Modi Mining has been formally appointed as the mining contractor, with
site establishment commencing in July 2025. Key operational and management personnel
have already been mobilised to site during the reporting period.
•
Underground Equipment: The contract with Rham Equipment Specialised Mining Equipment
has been executed and the first Load Haul Dumper (“LHD”) was successfully delivered to the
site (Image 1).
•
Drill Rigs: GST South Africa has been contracted to provide drill rigs, with the delivery of the
first rig targeted for October 2025.
•
Hydropower Systems: The hydropower systems contract has been finalised, with systems
already in place and the main power pack scheduled for delivery in mid-July 2025.
•
Explosives: The explosives supply contract has been signed with AECI and first delivery of
explosives is scheduled for end of July 2025.
IMAGE 1: LHD UNIT DELIVERED TO QALA SHALLOWS MARKING THE START OF MOBILISATION AS
WEST WITS MOVES INTO ACTIVE DEVELOPMENT
On-the-Ground Mobilisation Activities
Haulage equipment has started arriving on site, diesel generators were installed and Modi Mining is
underway with preparation work for production. Critical components, including the underground
hydropower system, are on order to support mining operations. Key works include constructing the
box-cut concrete roadway, finalising electrical system designs, completing the storehouse and
workshop, conducting underground survey work and preparing the stopes for ore extraction.
Pre-production activities include:
Safety & Operational Readiness
•
Sliping of sidewalls
•
Pumping out underground water caused by rain season
•
Recommissioning of electrical and water reticulation systems
•
Setup of underground communication systems
page ii
ASX Announcement and Media Release
28 July 2025
Surface Works & Infrastructure
•
Surface surveys and geotechnical assessments for permanent infrastructure
•
Construction of the box-cut concrete roadway and decline preparation
•
Installation of diesel generators for underground workings
•
Construction of a temporary onsite workshop
Underground Mine Systems
•
Finalising electrical system design that includes the permanent supply from the grid
•
Design and implementation of underground ventilation systems for ore production
Image 2 outlines the activities underway to prepare Qala Shallows for initial ore extraction in the
upcoming quarters.
IMAGE 2: A VIEW OF MOBILISATION ACTIVITIES AT QALA SHALLOWS
Serviced transformer delivered to site
Temporary generators for the ramp-up phase
Mine Technical Team entering Qala Shallows’
underground area
Health assessments conducted for mine
personnel
page iii
ASX Announcement and Media Release
28 July 2025
Office infrastructure equipped with modular
units, safety signage and firefighting
equipment
Mine management and operations teams
overseeing the mine
WITWATERSRAND BASIN PROJECT OPTIMISATION WORKSTREAMS
Updated Definitive Feasibility Study
The Company commissioned Bara Consulting in June to update the 2023 DFS to reflect the significantly
improved market conditions, including a gold price of approximately US$2,850/oz (compared to
US$1,850/oz in the 2023 study), updated CAPEX/OPEX from signed contracts, and a lower cut-off grade
that unlocks additional Mineral Resources and Ore Reserves. Results of the updated DFS were released
on 23rd July 2025 (post period) and will be covered in more detail in the Sep-2025 Quarterly Activities
Report. A summary of the updated DFS’s key financial metrics for the all Mineral Resources mine plan
against the 2023 DFS results is provided below:
TABLE 1: BASE CASE - KEY PRODUCTION METRICS FOR QALA SHALLOWS
QALA SHALLOWS – FINANCIAL EVALUATION*
Total Revenue
Total Free Cashflow
LOM C1 Cost
LOM All in sustaining Cost
Steady-State All in Sustaining Cost
Pre-Tax Net Present Value 7.5
Post-Tax Net Present Value 7.5
Pre-Tax Internal Rate of Return (%)
Post-Tax Internal Rate of Return (%)
Peak Funding
Peak Funding Period
Payback Period – from end of peak funding period
Payback Period – from start of development
*
JUN-233
US$ 1.7 billion
US$ 522M
US$ 818/oz
US$ 977/oz
US$ 871 /oz
US$ 367M
US$ 255M
61%
53%
US$ 54M
3 years
13 months
4.1 years
JUN-251
US$ 2.7 billion
US$ 983M
US$ 1 063/oz
US$ 1 289/oz
US$ 1 181/oz
US$ 719M
US$ 500M
93%
81%
US$ 44M
2.6 years
8 months
3.3 years
Including Inferred Resources
Project 200: Long-Term Growth Strategy
Beyond Qala Shallows, West Wits continues to advance its Project 200 vision, which aims to scale-up
production from the current 70,000oz per annum steady state1 to approximately 200,000oz by
incorporating the Main Reef and Bird Reef orebodies under the WBP mining right and additional mining
infrastructure. A Pre-Feasibility Study will define the scope and expand the Ore Reserve base,
page iv
ASX Announcement and Media Release
28 July 2025
positioning West Wits as a significant mid-tier gold producer. This study will be commissioned in due
time.
STAKEHOLDER ENGAGEMENT
On 2 July 2025, West Wits hosted a constructive community information session with local councillors
and the Local Economic Development Forum from Soweto wards near the mine, reinforcing the
Company’s commitment to open and inclusive engagement. During the session, the team introduced
key representatives from Mining Operations, Procurement, Enterprise Development, Employment and
Human Resources and Environment, Health and Safety. They provided an update on progress at Qala
Shallows, explained the upcoming mobilisation activities and outlined local employment opportunities
and procurement processes available to community members. These opportunities are regularly
published on the Procurement and Careers pages of the Company’s website, ensuring transparent
access for local suppliers and job seekers. Image 3 shows the representatives from both West Wits and
the participating ward councillors and Local Economic Development Forum members present at the
session.
IMAGE 3: SENIOR WEST WITS MANAGEMENT ENGAGED WITH SOWETAN COUNCILLORS AND THE
LOCAL ECONOMIC FORUM ON THE QALA SHALLOWS DEVELOPMENT, LOCAL PROCUREMENT AND
JOB OPPORTUNITIES
CORPORATE
A$14 Million Equity Placement Completed
West Wits successfully raised approx. A$14 million (before costs) through a placement to sophisticated
and professional investors. The placement issued 652,636,348 fully paid ordinary shares at A$0.022
per share, representing a 18.5% discount to the last closing price of the shares. Every two placement
shares are proposed to carry one free-attaching placement option, each with an exercise price of
A$0.0385 (a 75% premium to issue price) and a two-year expiry, subject to shareholder approval at a
general meeting expected in late July 2025.
Director participation totalled A$260,000 (subject to shareholder approval), and loans of
approximately A$550,000, plus interest, are being converted on the same terms. The funds are
allocated to commence operations, fund US$5 million for the buyback of a 10% minority interest in
West Wits SA Pty Ltd (increasing the Company’s WBP ownership from 66.6% to 74%, as per the
executed agreement), update the Definitive Feasibility Study and cover general working capital.
page v
ASX Announcement and Media Release
28 July 2025
Key Senior Appointments
Since April 2025, West Wits has appointed three key senior managers and twelve critical project roles,
with ten more hires planned over the next six months, bringing the team to approx. 30 personnel.
Modi Mining will manage approx. 1,000 on-site roles, with the first crew mobilised in July 2025.
Sifiso Magwaza, Mine Manager
Experience in gold, platinum, copper, iron ore, manganese. Shallow
and deep-level operations. Holds BSc Biochemistry, BSc Mining
Engineering, MBA. Led teams on expansions, brownfields. Focus on
mine planning, execution, optimisation. Senior roles at Impala
Platinum, Glencore, Palabora, South32, Harmony Gold.
Lindiwe Magidimisa, Projects & Business Development Manager
BSc Chemical Engineering, Postgrad Industrial Engineering, MBA.
Worked in Capital Assurance, Capital Projects, Business
Improvement, executive support. Most recently Chief of Staff in
CEO’s office. Focus on business structure, strategic alignment, crossfunctional delivery.
Arnoldus Ludick, Finance & Administration General Manager
Financial professional in mining. BCom Financial Accounting, BCom
Honours Managerial Accounting, AMDP. CGMA, ACMA. Works
across financial planning, enterprise risk, capital allocation. Led cost
optimisation, recovery programmes at Petra Diamonds, Anglo
American, AngloGold Ashanti.
OUTLOOK
West Wits is entering a decisive execution phase at Qala Shallows, with key project and funding
milestones targeted over the next 6 to 12 months. The immediate focus is on:
•
Delivering the updated DFS and Mineral Resource Estimate based on a gold price of
US$2,850/oz
•
Right-sizing the senior syndicated loan facility based on the updated mine plan and prevailing
gold price
•
Complete the project finance package.
•
Finalising the three-month mobilisation program
•
Achieve first ore production through completed early works development
•
Reaching first gold pour
Following this, the Company will prioritise a steady production ramp-up through decline development
during 2026/2027, targeting steady-state production of 70,000 ounces per annum over a 12-year mine.
page vi
ASX Announcement and Media Release
28 July 2025
AUSTRALIA
MT CECELIA, PATERSON PROVINCE (100%)
West Wits continues active discussions with its Farm-In partner, Rio Tinto Exploration Pty Limited
("RTX"), to explore opportunities for advancing the project further.
Approved for release by the Board of West Wits Mining Limited.
For Investor Relations contact:
Keith Middleton
keith@middletoncorporate.com.au
General info@westwitsmining.com
www.westwitsmining.com
ABOUT WEST WITS MINING LIMITED
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) is focused on the exploration, development and
production of high-value precious and base metals for the benefit of shareholders, communities and
environments in which it operates. Witwatersrand Basin Project, located in the proven gold region of Central
Rand Goldfield of South Africa, boasts a 5.025Moz gold project at 4.66g/t2. The Witwatersrand Basin is a largely
underground geological formation which surfaces in the Witwatersrand. It holds the world's largest
known gold reserves and has produced over 1.5 billion ounces (over 40,000 metric tons), representing about 22%
of all the gold accounted for above the surface. In Western Australia, WWI is exploring gold and copper at the
Mt Cecilia Project in a district that supports several world-class projects such as Woodie Woodie manganese
mine, Nifty copper and Telfer gold/copper/silver mines.
1.
2.
3.
The original report was “Updates to DFS provide Improved Results for WBP” which was issued with consent of the
Competent Person, Mr. Andrew Pooley. The report was released to the ASX on 23 July 2025 and can be found on the
Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data that
materially effects the information included in the relevant market announcement and, in the case of Mineral Resources
or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market announcement.
The DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is
reasonable to include these inferred mineral resources in the well-understood and researched structure of the
Witwatersrand Basin and the views provided to WWI by independent geological expert consultants, given the project’s
location and geology.
The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent of the
Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on 16 December 2024 and can
be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at 4.60g/t for 1.595Moz
measured, 12.29MT at 4.19g/t for 1.70Moz Indicated and 10.49MT at 5.10g/t for 1.73Moz inferred. The Company is not
aware of any new information or data that materially effects the information included in the relevant market
announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
The original report was “Updates to Qala Shallows DFS provide improved results for Witwatersrand Basin Project” which
was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to the ASX on 27 July
2023 and can be found on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new
information or data that materially effects the information included in the relevant market announcement and, in the
case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed. The form and
context in which the Competent Person’s findings are presented have not been materially modified from the original
market announcement.
page vii
ASX Announcement and Media Release
28 July 2025
Summary of expenditure on substantive exploration, development and production activities:
• $325k for Qala Shallows development, operations & maintenance which includes EPCM design and
planning.
• $427k for underground equipment.
Related Party Payments:
• $27k for director fees to Mr. Quinert
• $30k to Brickwick & QR Lawyers Pty Ltd, related entities to Mr Quinert, for office rent and legal services
in Australia
• $17k to Malan Scholes Attorneys, a related entity to Mr. Scholes, for legal services in South Africa
INTERESTS IN MINING TENEMENTS
Tenements
Location
Held at end of
Quarter
Acquired
during the
Quarter
Disposed
during the
quarter
Mining Right GP 30/5/1/2/2/10073
MR (WBP)
Exploration License –
EL 45/5045 (Mt Cecelia)
Witwatersrand Basin,
West Rand, South Africa
66.6%*
-
-
Pilbara region, Western
Australia
100%
-
-
^ Production IUP –
NO. 47/2010 (Derewo)
Paniai Regency,
Indonesia
29%*
-
-
^ Exploration IUP –
NO. 76/2010 (Derewo)
Paniai, Indonesia
64%*
-
-
^ Exploration IUP –
NO.31/2010 (Derewo)
Intan Jaya, Indonesia
64%*
-
-
^ Exploration IUP –
NO. 543/142/SET
(Derewo)
Nabire, Indonesia
64%*
-
-
* Minority positions are held by local parties in compliance with local legislation in relation to foreign ownership and mineral
and production rights.
^ Exploration IUP’s may no longer be within the compliance period and could be subject to cancellation
DEREWO PROJECT
No substantive activities have occurred, the Company is currently seeking interested parties to divest
the Derewo Project.
page viii
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
WEST WITS MINING LIMITED (ASX: WWI)
ABN
Quarter ended (“current quarter”)
89 124 894 060
30 June 2025
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
-
-
-
-
(325)
(876)
(c) production
-
-
(d) staff costs
(467)
(1,512)
(e) administration and corporate costs
(560)
(1,541)
(a) exploration & evaluation
(b) development
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
-
6
1.5
Interest and other costs of finance paid
-
-
1.6
Income taxes paid
-
-
1.7
Government grants and tax incentives
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating
activities
(1,350)
(3,923)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
-
-
(b) tenements
(25)
(183)
(c) property, plant and equipment
(427)
(427)
(d) exploration & evaluation (if capitalised)
(34)
(329)
(e) investments
-
-
(f)
-
-
(a) entities
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(486)
(939)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
14,091
14,440
3.2
Proceeds from issue of convertible debt
securities
-
1,500
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(664)
(775)
3.5
Proceeds from borrowings
410
450
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
(20)
(31)
3.10
Net cash from / (used in) financing
activities
13,817
15,584
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
156
1,401
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,351)
(3,293)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(487)
(939)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
13,817
15,584
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Year to date
(12 months)
$A’000
3
16
12,139
12,139
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
12,139
12,139
5.2
Call deposits
-
-
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
12,139
12,139
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
28
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
15
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
The amount at 6.1 includes payment of director’s fees and salaries, legal fees & office rent (including
GST & VAT where applicable).
The amount at 6.2 includes payment of legal fees for South African tenement acquisitions (including
GST & VAT where applicable).
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at
quarter end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
-
-
7.3
Other (please specify)
950
850
7.4
Total financing facilities
950
850
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
100
$1.5M Convertible Notes (CN) with a conversion price of $0.02 (2 cents) until 17 January
2025 and thereafter have a conversion price of the lesser of $0.02 (2 cents) or a 20%
discount to the 15-day VWAP of WWI shares at that time. The CN have a maturity date of
16 October 2026 at which point any CN’s not converted are redeemable in cash. Notes are
unsecured and interest free. Unlisted Options were issued in-lieu of interest. 49 CN’s
totalling $1.075M were converted to ordinary shares prior to the reporting date, leaving an
outstanding balance of 16 CN’s totalling $400k.
The Company secured an interim loan for $550,000 (“Interim Loan”) in April 2025 with
$450,000 advanced at end of the reporting period. The Interim Loan is unsecured, has a 6month term and accrues interest at a rate of 10% per annum which is capitalised. At the
sole election of the Company, the Interim Loan is repayable in cash, or in ordinary WWI
shares at 2.2c being the issue price of the A$14M equity placement announced to the ASX
on 16th June 2025.
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,384)
8.4
Cash and cash equivalents at quarter end (item 4.6)
12,139
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
(1,350)
(34)
12,139
8.77
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
28 July 2025
Authorised by: By the Board
(Name of body or officer authorising release – see note 4)
Notes
1.
This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2.
If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3.
Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4.
If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5.
If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.