WWI - Investor Presentation
Released
Released
Announcement PDF
ASX Announcement and Media Release
Monday, 1 September 2025
West Wits Mining Presentation
East Coast Roadshow | Africa Down Under
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) is pleased to advise that Managing Director,
Rudi Deysel, together with Chairman, Michael Quinert, will be in Sydney and Melbourne from 1–4
September 2025 as part of the Company’s Australian roadshow.
Additionally, members of West Wits’ senior management team will attend the Africa Down Under
(ADU) Conference, scheduled to take place from September 3 to 5, 2025, in Perth. At this event, Ms
Tozama Kulati Siwisa, Executive Director and Head of Corporate Affairs, will present on behalf of the
Company.
A copy of the Investor Presentation for both events is attached, highlighting the first stage, Qala
Shallows, of the Company’s flagship South African Witwatersrand Basin gold project.
Approved for release by the Managing Director, Rudi Deysel.
For further information please contact:
Keith Middleton - keith@middletoncorporate.com.au
General
info@westwitsmining.com
westwitsmining.com
linkedin.com/company/west-wits-mining
ABOUT WEST WITS MINING LIMITED
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) is focused on the exploration, development and
production of high-value precious and base metals for the benefit of shareholders, communities and
environments in which it operates. Witwatersrand Basin Project, located in the proven gold region of Central
Rand Goldfield of South Africa, boasts a 5.025Moz gold project at 4.66g/t1.
1.
The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with
consent of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on
16 December 2024 and can be found on the Company’s website (https://westwitsmining.com/). Comprising
10.7MT at 4.60g/t for 1.595Moz measured, 12.29MT at 4.19g/t for 1.70Moz Indicated and 10.49MT at
5.10g/t for 1.73Moz inferred. The Company is not aware of any new information or data that materially
effects the information included in the relevant market announcement and, in the case of Mineral Resources
or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the
relevant market announcement continue to apply and have not materially changed. The form and context
in which the Competent Person’s findings are presented have not been materially modified from the original
market announcement.
page i
WEST WITS MINING
SOUTH AFRICA | NEAR-TERM GOLD PRODUCER | ASX:WWI
SEPTEMBER 2025
ASX:WWI
COPYRIGHT ©2025 ALL RIGHTS RESERVED
Qala Shallows, Witwatersrand Basin Project, Gauteng
Mining District, Johannesburg, South Africa
DISCLAIMER
FORWARD-LOOKING STATEMENTS
This presentation includes “forward-looking statements” as that term within the meaning of securities laws of
applicable jurisdictions. Forward-looking statements involve known and unknown risks, uncertainties and other
factors that are in some cases beyond West Wits Mining Limited’s control. These forward-looking statements
include, but are not limited to, all statements other than statements of historical facts contained in this
presentation, including, without limitation, those regarding West Wits Mining Limited’s future expectations.
Readers can identify forward-looking statements by terminology such as “aim,” “anticipate,” “assume,”
“believe,” “continue,” “could,” “estimate,” “expect,” “forecast,” “intend,” “may,” “plan,” “potential,”
“predict,” “project,” “risk,” “should,” “will” or “would” and other similar expressions. Risks, uncertainties and
other factors may cause West Wits Mining Limited’s actual results, performance, production or achievements
to differ materially from those expressed or implied by the forward-looking statements (and from past results,
performance or achievements).
These factors include, but are not limited to, the failure to complete and commission the mine facilities and
related infrastructure in the time frame and within estimated costs currently planned; variations in global
demand and price for gold fluctuations in exchange rates between the U.S. Dollar, South African Rand and
the Australian Dollar; the failure of West Wits Mining Limited’s suppliers, service providers and partners to fulfil
their obligations under construction, supply and other agreements; unforeseen geological, physical or
meteorological conditions, natural disasters or cyclones; changes in the regulatory environment, industrial
disputes, labour shortages, political and other factors; the inability to obtain additional financing, if required,
on commercially suitable terms; and global and regional economic conditions. Readers are cautioned not to
place undue reliance on forward-looking statements. The information concerning possible production in this
announcement is not intended to be a forecast. They are internally generated goals set by the board of
directors of West Wits Mining Limited. The ability of the Company to achieve any targets will be largely
determined by the Company’s ability to secure adequate funding, implement mining plans, resolve logistical
issues associated with mining and enter into any necessary off take arrangements with reputable third parties.
Although West Wits Mining Limited believes that its expectations reflected in these forward-looking statements
are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual
results will be consistent with these forward-looking statements.
ASX:WWI
The production target and financial forecasting reported under the Qala Shallows Definitive Feasibility Study
(DFS) contain inferred mineral resources. The directors confirm that it is reasonable to include these inferred
mineral resources having regard to the location and geology of the project in the well understood and
researched structure of the Witwatersrand Basin and the views provided to WWI by independent geological
expert consultants.
COMPETENT PERSON STATEMENTS
The original report was “Updates to DFS provide Improved Results for WBP” which was issued with consent of
the Competent Person, Mr. Jim Pooley. The report was released to the ASX in July 2025 and can be found on
the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or
data that materially effects the information included in the relevant market announcement and, in the case
of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning
the estimates in the relevant market announcement continue to apply and have not materially changed. The
form and context in which the Competent Person’s findings are presented have not been materially modified
from the original market announcement.
The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent
of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to the ASX on 16 December
2024 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at
4.60g/t for 1.595Moz measured, 12.29MT at 4.19g/t for 1.70Moz Indicated and 10.49MT at 5.10g/t for 1.73Moz
inferred. The Company is not aware of any new information or data that materially effects the information
included in the relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all
material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
PAGE | 2
Why invest in West Wits
Significant gold resource in the
Witwatersrand Basin Project (WBP)
South Africa
WBP – Mineral Resource Estimate
5Moz Gold
(65% measured & indicated categories)1
WBP - Project 200 - significant growth
opportunity aimed to produce
200 000oz Gold per annum
Qala Shallows (Stage 1) – Robust DFS
17yr Life-of-mine for 944,000oz
70,000oz p/a steady-state production
for 12 years2
Qala Shallows - DFS
Post Tax IRR 81% & NPV7.5 US$500M
@ US$2,850/oz gold price2
Qala Shallows – Turn-key ready: fully
licensed, site infrastructure maintained; key
supplier contracts secured
Qala Shallows – Cost-effective toll treat
agreement with Ezulwini Mining
Company/ Sibanye-Stillwater subsidiary
Funding – Executed Loan Documents for
ZAR 875M (~USD 50M) senior debt
syndicated loan facility
Experienced international board and
management team
ASX: WWI | OTBCQB: WMWWF
CORPORATE SNAPSHOT
Transforming into mid-tier gold producer
CAPITAL STRUCTURE (ASX:WWI)
Shares on issue
3.39B
Market Capitalisation
A$119M
Unlisted Options (exercise price range 2.2c – 25c)*
Performance Rights
Convertible Notes^
@ 3.5c per share (on 27/08/2025)
84.4M
7.5M
3
Cash – 27/08/2025
A$2.5M
Enterprise Value per MRE Ounce
A$23/oz
JORC Mineral Resource Estimate1 (Gold)
5Moz
includes declared Ore Reserves
^ Convertible Notes (CN) with a A$25,000 Face Value, convertible to WWI shares at the
lower of 2c or a 20% discount to the 15-day VWAP until the notes expire on 16/10/26. The
CN is free and unsecured
* WWI proposes issuing an aggregate of approximately 326 million options (3.85c
exercise price and expiring two years from issue) as approved by shareholders at the
general meeting on 11 August 2025.
ASX:WWI
PAGE | 4
BOARD & EXECUTIVE TEAM
MICHAEL QUINERT
Chairman (AUS)
WARWICK
GRIGOR
Non-Exec Dir
(AUS)
ASX:WWI
ASX-experienced
commercial lawyer
with extensive
involvement in assisting
and advising publicly
listed mining
companies globally.
Non-Executive Director
of ASX-listed
companies and serves
on the boards of
several unlisted
companies
Experienced
analyst who
founded Far East
Capital Limited, a
specialist company
financier and
corporate adviser
in the mining
sector. Was the
founding Executive
Chairman of
Canaccord
Genuity Australia
JAC VAN
HEERDEN
Non-Exec Dir
(SA)
RUDI DEYSEL
CEO (SA) / MD
Mining Eng. with
Geophysics and MBA.
Production experience in
conventional narrow
tabular underground,
open-cast mining and
various commodities
including Gold, PGMs,
Copper and
Cobalt. Previous
experience includes Anglo
American and Galiano
Gold
Mining Engineer
with MBA,
operations and
project experience
in SA, DRC and
Zimbabwe. Surface
and underground
mine management
expertise in base
and precious
metals. Strong
background in mine
technical services
and executive
management
TOZAMA KULATI
SIWISA
Exec Dir/Head of
Corp Affairs (SA)
SIMON WHYTE
CFO / Company
Secretary (AUS)
BCom with an MBA
with extensive
experience in ESG
management and
leading
transformation
projects from
development to
execution.
Previously head of
stakeholder
relations at Lonmin
Chartered Accountant
and Associate Member of
the Governance Institute
of Australia with
experience in mining,
commodities and logistics,
including global majors,
Ernst & Young and BP
Australia. Expertise in
managing business
transformation and
integration projects
KEITH
MIDDLETON
Non-Exec Dir
(AUS)
Company director
with significant
experience in capital
markets, strategy and
mining operations in
Australia, North
America and South
Africa. Previously
founding MD of
American Rare Earths
and NED in ASX listed
resource companies
Redbank Copper
and Advance Metals
PAGE | 5
QALA SHALLOWS - DFS FINANCIAL MODEL & FUNDING2
KEY FINANCIAL METRICS – DFS Base Case US$2,850/oz
DEFINITIVE FEASIBILITY STUDY
DFS - Financial Evaluation
▪
Post-Tax Free Cashflow of US$983m over Life-of-Mine
Peak Funding
▪
AISC cost in lowest quartile at US$1,289/oz (LOM)
▪
Post-Tax - NPV7.5 US$500m and IRR 81%
▪
Optimised DFS released 23 July 2025
Payback Period
(from end of peak funding)
Payback Period
(from commencement)
PEAK FUNDING REQUIREMENT
▪
US$44m (DFS) with 8 months payback from end of peak funding period (2.6yrs)
▪
Peak funding substantially reduced at prevailing Gold Price due to higher
revenues from production during the 2.6-year mine development phase
▪
At a Gold Price (US$3,850/oz), peak funding reduces to US$31M
PROJECT FUNDING INITIATIVES
▪
Executed Senior Debt syndicated loan facility of up to ZAR 875 million (~USD 50
million) with two leading South African financial institutions.
▪
The Senior Lender Funding model is based on Ore Reserves only, incorporates
higher contingency rates compared to the DFS & finance costs
Note: the DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is
reasonable to include these inferred mineral resources in the well-understood and researched structure of the Witwatersrand
Basin and the views provided to WWI by independent geological expert consultants, given the project’s location and geology.
ASX:WWI
Post-Tax NPV (7.5%)
Post-Tax Internal Rate of Return
DFS - Financial Evaluation
GOLD PRICE
US$2,850/oz
GOLD PRICE
US$3,850/oz
US$44m
US$31m
8 months
n/a
3.3 years
2.8 years
US$500m
$805m
*(A$766m)
*(A$1.2b)
81%
128%
GOLD PRICE US$2,850/oz
Total Revenue
US$2.7b
Total Free Cashflow
US$983m
LOM C1 Cost
US$1,063/oz
AISC – Life of Mine
US$1,289/oz
AISC – Steady State
US$1,181/oz
Pre-Tax Internal Rate of Return
* USD converted to AUD at 1.5316
93%
PAGE | 6
QALA SHALLOWS - MINING INVENTORY & ORE RESERVE2
RUN OF MINE INVENTORY (INCLUSIVE OF ORE RESERVES) 2
RUN OF MINE INVENTORY
Mineral Resource
Estimate Category
Tonnage
(Mt)
Grade
(g/t)
Content
(kg)
Content
(oz)
▪
1.03Moz Gold at 3.0g/t, inclusive of Ore Reserves
▪
Ore Reserves – 4.6Mt at 2.60g/t for 384,000 oz gold,
comprises 37% of the mining inventory
Measured
1.4
2.78
3 167
102 000
Indicated
3.7
2.54
9 487
305 000
During the first 7 years of production, reserves
comprise >75% of mining inventory
Inferred
5.8
3.30
19 268
619 000
Grand Total
10.7
2.98
31 922
1 026 000
▪
▪
An underground drilling program will be implemented
to convert resources to reserves as decline
development progresses to maintain a minimum level
of reserves
▪
Mine Plan cut-off grade at 1.31g/t is calculated using
a gold price of US$2,850/oz and ZAR 18.00/1 US$
Note: the DFS and any production target under the DFS contain inferred mineral resources. The
directors confirm that it is reasonable to include these inferred mineral resources in the wellunderstood and researched structure of the Witwatersrand Basin and the views provided to WWI
by independent geological expert consultants, given the project’s location and geology.
ASX:WWI
PAGE | 7
QALA SHALLOWS - MINING PLAN
Trackless development with conventional stoping
– tried and tested
▪
Ore body is accessed from surface via a decline system developed
from the existing Qala adit box cut
▪
The decline is located centrally in the mining area and the K9B
footwall
▪
Stopes will be accessed via strike drives developed on the K9B reef
horizon
▪
Development of the strike drives and decline will be by mechanised
method with drill rigs, LHDs and ADTs deployed for drilling, face
cleaning and hauling of blasted rock to the tips respectively
▪
Mining in the stope blocks will be using standard conventional
mining techniques widely used in region with the deployment of
handheld drills and cleaning using a scraper and winch
combination
▪
Most of the mining will take place in a large unmined block of
ground to the east of the property
▪
Stoping will commence from 35m below surface to a maximum
depth of 850m
▪
A small amount of waste rock will be stockpiled on site
▪
Once on surface, ore will be trucked approximately 40km to an
existing processing plant under a Toll Processing agreement with
Sibanye Stillwater.
ASX:WWI
Stage 3
Stage 2
Stage 1 - DFS
Stage 4
PAGE | 8
QALA SHALLOWS - PRODUCTION SCHEDULE
GOLD PRODUCTION
Updated DFS completed in July 2025 by Bara Consulting2
•
DFS completed on first stage of development to deliver
944,000oz gold at AISC of US$1,289/oz
•
Initial production will provide a robust 30,000 tonne ore
stockpile to facilitate delivery of 15,000 tonnes per month
to Sibanye-Stillwater’s plant , which ramps up to steadystate of around 60,000 tonnes per month
•
Targeting achievement of the stockpile & delivery within
6 to 8 months from start of production
•
Gradual mine build-up towards a steady-state
production of 70,000 ounces of gold per annum at an
AISC of US$1,181/oz
MINING SCHEDULE & GRADE
Note: the DFS and any production target under the DFS contain inferred mineral resources. The
directors confirm that it is reasonable to include these inferred mineral resources in the wellunderstood and researched structure of the Witwatersrand Basin and the views provided to WWI by
independent geological expert consultants, given the project’s location and geology.
ASX:WWI
PAGE | 9
WWI – GOLD RESOURCES
GLOBAL MINERAL RESOURCE ESTIMATE (JORC 2012)1
Category
Tonnage (Mt)
Grade (g/t)
Content (oz)
Measured
10.07
4.60
1 595 000
Indicated
12.29
4.19
1 700 000
Measured &
Indicated
23.00
4.45
3 295 000
Inferred
10.49
5.10
1 730 000
Total
33.49
4.66
5 025 000
▪
Significant global Mineral Resource Estimate of
5Moz Gold @ 4.66 g/t Au1
▪
High confidence level with 65% of MRE in Measured
& Indicated categories.
▪
3 distinct reef horizons: Kimberley Reef; Bird Reef;
Main Reef (right image)
▪
Well-understood geology, mineralisation &
metallurgy
▪
Additional area under application
ASX:WWI
PAGE | 10
WBP – LOCATION & GROWTH POTENTIAL
SANDTON CBD
5. BIRD REEF
CENTRAL (BRC)
Gold & Uranium
JOHANNESBURG CBD
▪
2022 Scoping Study identified Five (5) distinct development
stages for the Witwatersrand Basin Project with Stages 1 – 4 Gold
Projects for a 27yr Life of Mine.4
▪
Qala Shallows is Stage 1 of the WBP which has been subject to a
DFS with a 17yr Life of Mine.2
▪
Prospecting Right (PR) adjacent to Qala Shallows granted
(yellow), & PR application (red) Environmental Authorisation
obtained - awaiting confirmation from regulator
▪
Stage 5 (BRC) is a potential standalone Gold & Uranium project.
Image: Mining Right (blue); Prospecting Right Granted (yellow)& PR Application (red)
ASX:WWI
PAGE | 11
WBP - MRE & ORE RESERVE GROWTH
WBP tenement area
previously held by DRD Gold
which had a Historical MRE
declared (2000 ASX Report) of
12.8Moz at 4.6g/t Gold under
the previous JORC Code3.
WWI has progressively grown
the MRE under the 2012 JORC
Code to over 5Moz @
4.66g/t.1
The Company has grown
declared Ore Reserves to
384koz.2
GOLD OUNCES (MILLION)
6
5
0.29
4
-
-
3
1.42
1.21
2
1
-
0.30
0.57
0.35
JAN-16
Jan-16
Maiden MRE 400M depth3
1.00
1.24
1.26
0.81
DEC-17
Dec-17
Upgrade:
400 -1,500m
on
Kimberley
Reefs9
JUL-18
Jul-18
Addition to
of K9B Reef8
Inferred
ASX:WWI
0.28
0.60
1.31
1.30
1.31
SEP-21
Indicated
0.38
1.51
1.49
1.44
1.42
1.73
1.73
1.37
1.38
Sept-21
DFS with
declared
maiden Ore
Reserve7
0.35
DEC-21
Dec-21
Bird Reef &
Main Reef
Upgrade to
1,000m depth5
Measured
DEC-24
Dec-24
Boost with
New
Prospecting
Right
Granted1
JUL-25
Jul-25
DFS updated
with
US$2,850/oz
gold price &
ZAR18:$1 FX
rate2
Ore Reserves
PAGE | 12
TARGETING FIRST GOLD POUR Q1 2026
2024
2025E
H1
2026E
H2
H1
2027E
H2
2028E
H1
H2
H1
H2
LVL 2
LVL 3
LVL 4
LVL 5
Progress completion of Project Finance package
Mobilise mining contractors
Commission underground mine development
Build 30,000t stockpile & start deliveries to Sibanye
First gold pour
EPCM contract works – major surface infrastructure
UG level access via decline development
LVL 1
Ongoing UG sampling to grow Ore Reserves
Ramp up of gold production to 70,000oz pa Steady-State2
Note: the DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is
reasonable to include these inferred mineral resources in the well-understood and researched structure of the Witwatersrand
Basin and the views provided to WWI by independent geological expert consultants, given the project’s location and geology.
ASX:WWI
PAGE | 13
KEY MILESTONES DRIVING VALUE
Milestones
2021✓ Mining Right granted with 3.5Moz gold MRE8
✓ Stage 1 DFS confirms 278koz Reserves & AISC US$1,144/oz7
✓ MRE increased to 4.3Moz Gold7
✓ Revised Scoping Study on Stages 1 – 45
✓ Early Works: surface infrastructure & UG access established
✓ Toll Processing Agreement secured with Sibanye Stillwater
✓ Updated DFS boosts Reserves to 351koz & AISC US$977/oz10
✓ Contracts negotiated with key suppliers
✓ Project finance due diligence successfully completed
✓ MRE increased to 5Moz Gold1
2025
✓ Credit Approval received from 2 senior lenders
Catalysts
✓ Release updated Qala Shallows DFS including
US$500M Post-Tax NPV7.5 (Jun-25)
✓ Execute project ownership to 74% via BEE Buy-Back
(Aug-25)
❖ Progress completion of Project Finance package
(Sep-25)
❖ First ore production via completed early works
development (Oct-25)
❖ First Gold Pour from Sibanye’s Ezulwini Plant (Mar-26)
❖ Steady production ramp up via decline
development (2026-27)
❖ Steady-state production commences, 12-years @
70,000/oz pa2 (2028)
✓ Complete capital raise and commence mobilisation at site
✓ Execute legal documents on US$50M Sr. Loan Facility
ASX:WWI
PAGE | 14
MOBILISATION AT QALA SHALLOWS IS UNDERWAY
ASX:WWI
PAGE | 15
WBP ENVIRONMENTAL, SOCIAL & GOVERNANCE (ESG)
ENVIRONMENTAL STEWARDSHIP & BIODIVERSITY CONSERVATION
▪
Complete underground operation: Low noise and dust levels
▪
Small footprint & surface infrastructure: Low rehabilitation liability &
minimal impact on surrounding environment
▪
Efficient water use model: Minimal water usage & zero effluent
discharge into local tributaries
SOCIAL POSITIVE IMPACT OF HOST COMMUNITIES
▪
Local Economic Development Programme: Community wards forum in
collaboration with City of Joburg
▪
Local procurement: Sourced from growing BEE database
▪
Social & Labour Plan: Includes Beneficiary Learnership Programme
GOVERNANCE RESPONSIBLE PRODUCTION PRACTICES
▪
Corporate Governance Framework: Complies with changing legal
& regulatory requirements
▪
Company Mine Health & Safety: Conforms to Mine Health & Safety Act
29 of 1996
▪
Health & Safety: Zero harm approach
▪
Stakeholder Engagement: Transparent reporting
ASX:WWI
PAGE | 16
Qala Shallows Box Cut
CHIEF EXECUTIVE OFFICER
INVESTOR RELATIONS
SOUTH AFRICA
AUSTRALIA
Rudi Deysel
Keith Middleton
rdeysel@westwitsmining.com
keith@middletoncorporate.com.au
Unit 8A, Sifon Industrial Park
279 Sifon Street, Robertville
Roodepoort
1709
Level 6, 400 Collins Street
Melbourne, Victoria
Australia
3000
westwitsmining.com | info@westwitsmining.com
COPYRIGHT ©2025 ALL RIGHTS RESERVED
ASX:WWI
PAGE | 17
EXPERIENCED MANAGEMENT TEAM
SIFISO MAGWAZA
Mine Manager (SA)
MARTIN BEVENLANDER
Head of Geology &
Exploration (SA)
ASX:WWI
Mining Engineer with
experience managing
large, diverse teams in
mining operations, from
shallow underground
mining to deep level gold
mining, operational
expansions, as well as
Brownfields across gold,
platinum, copper, iron
and manganese. Formerly
with Impala, Glencore,
Palabora, South32 and
Harmony Gold
Geologist with expertise
that spans across the
entire mining cycle from
greenfield exploration,
and project
development to
production. Worked in
Indonesia, Papua New
Guinea, Australia and
across Africa
LINDIWE MAGIDIMISA
Projects & Business
Development
Manager (SA)
ARNOLDUS LUDICK
General Manager
Finance and Admin
(SA)
BSc Chemical
Engineering, PGDip
Industrial Engineering,
and MBA. Experience
spans multiple business
functions, including
Capital Assurance,
Capital Projects, Business
Improvement, and
serving as Chief of Staff in
CEO’s office at De Beers
CGMA, ACMA, AMDP with
BCom (Hons) in
Management and Financial
Accounting. Financial
strategist with track record
in cost transformation and
operational efficiency.
Previous experience
includes Petra Diamonds
and Anglo American
PAGE | 18
APPENDIX 1: ORE RESERVE & MINERAL RESOURCE ESTIMATE STATEMENTS
Table 1: WBP (JORC) Ore Reserve2
Declared Ore Reserve of 4.6MT at 2.6g/t for 383,934oz Gold2
ORE RESERVE STATEMENT FOR QALA SHALLOWS (JORC 2012)
ORE Reserve
Category
Tonnage
(Mt)
Grade
(g/t)
Content
(kg)
Content
(oz)
Proved
1.1
2.79
3 086
99 205
Probable
3.49
2.54
8 856
284 730
Total
4.6
2.60
11 942
383 934
Note: errors may occur due to rounding differences
Ore Reserve Notes:
1. No Inferred Mineral Resources are included in the Ore Reserves.
2. The evaluation used a gold price US$2,850 per ounce and a rate of exchange of R18.0 / US$ 1.
WBP’s Global Mineral Resource is made up of several gold bearing reefs across the mining right
area, a breakdown by reef and MRE category is detailed in Table 2 1.
MRE Notes:
1. Global MRE set at a 2.0g/t Au cut-off. Reported in accordance with the JORC Code of 2012.
2. Number differences may occur due to rounding errors.
3. Mineral Resources are reported as inclusive of Ore Reserves.
4. The Inferred Mineral Resources have a high degree of uncertainty, and it should not be assumed that all
or a portion thereof will be converted to Ore Reserves.
REFER TO SLIDE 10 FOR QALA SHALLOWS MINE INVENORY TABLE – 1Moz
Table 2: WBP (JORC) Mineral Resource Estimate – by Reef (2g/t cut-off)1
Measured
Indicated
Inferred
Total
Reef
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Tonnes
(M)
Grade
(g/t)
Ounces
(M)
Bird – Central & West
0.04
3.73
0.00
0.89
2.51
0.07
0.44
2.86
0.04
1.38
2.66
0.12
Bird – East
2.22
4.30
0.31
2.00
4.74
0.30
0.42
4.48
0.06
4.63
4.51
0.67
K9B KRC
0.00
2.98
0.00
0.10
3.87
0.01
0.18
4.22
0.02
0.28
4.08
0.04
K9B KRE
1.93
4.37
0.27
6.21
4.14
0.83
2.35
5.51
0.42
10.50
4.49
1.52
K9A KRE
2.10
4.54
0.31
1.82
4.20
0.25
4.20
5.14
0.69
8.11
4.77
1.25
K9B KRE (PR 10730)
0.31
5.18
0.05
0.54
5.92
0.10
1.46
5.18
0.24
2.31
5.35
0.40
K9A KRE (PR 10730)
0.59
4.95
0.09
0.50
5.01
0.08
1.05
5.27
0.18
2.14
5.12
0.35
Main Reef Leader
0.72
5.81
0.14
0.15
8.34
0.04
0.09
7.54
0.02
0.96
6.36
0.20
Main
2.79
4.73
0.42
0.09
5.15
0.01
0.31
5.27
0.05
3.19
4.79
0.49
Total
ASX:
WWI | OTBCQB: WMWWF10.70
4.60
1.59
12.29
4.19
1.70
10.49
5.10
1.73
33.49
4.66
5.03
Note: errors may occur due to rounding differences
APPENDIX 2 - REFERENCES
1.
The original report was “WBP Global MRE Increases with New Prospecting Right” which was issued with consent of the Competent Person, Mr Hermanus Berhardus Swart. The report was released to
the ASX on 16 December 2024 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 10.7MT at 4.60g/t for 1.595Moz measured, 12.29MT at 4.19g/t for 1.70Moz
Indicated and 10.49MT at 5.10g/t for 1.73Moz inferred. The Company is not aware of any new information or data that materially effects the information included in the relevant market
announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement
continue to apply and have not materially changed. The form and context in which the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
2.
The original report was “Updates to DFS provide Improved Results for WBP” which was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to the ASX on 23 July
2025 and can be found on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially effects the information included in the
relevant market announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed. The form and context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement. The DFS and any production target under the DFS contain inferred mineral resources. The directors confirm that it is reasonable to include these inferred mineral
resources in the well-understood and researched structure of the Witwatersrand Basin and the views provided to WWI by independent geological expert consultants, given the project’s location and
geology.
3.
The original report was “Updated Mineral Resource Estimate for the Soweto Cluster” which was issued with consent of competent persons Mr. Hermanus Berhardus Swart, it was released to the ASX
on 22 January 2016 and can be found on the Company’s website (https://westwitsmining.com/). The company is not aware of any new information or data that materially effects the information
included in the relevant market announcement. The form & context in which the Competent Persons’ findings are presented have not been materially modified.
4.
The original report was “Wits Basin Scoping Study” which was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to the ASX on 09/03/2022 and can be found
on the Company’s website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially effects the information included in the relevant market
announcement. The form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
5.
The original report was “WBP’s Global JORC Mineral Resource Expands by 724,000oz to 4.28MOZ at 4.58 g/t Gold” which was issued with consent of the Competent Person, Mrs Cecilia Hattingh. The
report was released to the ASX on 3 December 2021 and can be found on the Company’s website (https://westwitsmining.com/).
Share your feedback
Discover