West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) (“West Wits” or “the Company”) is
pleased to report the award and execution of a new Prospecting Right (“PR”) (PR10730) which
significantly increases the Company’s Mineral Resource Estimate base to 5.025 million ounces of gold
reported within the guidelines of JORC (2012). The PR is strategically positioned adjacent to the
Company’s existing Mining Right for the Witwatersrand Basin Project located in Johannesburg, South
Africa.
HIGHLIGHTS
➢ New Prospecting Right (“PR”) (PR 10730) granted at Witwatersrand Basin Project
➢ PR significantly grows the previously stated Mineral Resource Estimate (“MRE”)1 by
749 000oz (+17.5%) and increases the global grade by 0.08g/t contained Gold
➢ WBP’s global MRE updates to 5.025Moz @ 4.66g/t Au @ 2g/t cut-off
West Wits Chairman Michael Quinert said, “We are delighted to announce the grant of the new
Prospecting Right at our Witwatersrand Basin Project. This achievement marks a significant step
forward. The project’s global MRE has been elevated to over 5 million ounces, which provides a
strong foundation to bring about a substantial enhancement to the project’s economic potential. This
upgrade underscores our commitment to delivering value and growth."
Table 1 summarises the categories of the updated global MRE for the Witwatersrand Basin Project
(“WBP”). (JORC Table 1 is attached to this announcement)
TABLE 1: UPDATED GLOBAL MRE FOR THE WBP AT 2.0G/T CUT-OFF
WBP – Updated Global Mineral Resource Estimate as at December 2024
Grade
Category
Tonnes (M)
Ounces
(g/t Au)
Measured
10.70
4.60
1 595 000
Indicated
12.29
4.19
1 700 000
Measured & Indicated
23.00
4.45
3 295 000
Inferred
10.49
5.10
1 730 000
Total
33.49
4.66
5 025 000
Notes: The global MRE is set at a 2.0 g/t Au cut-off and reported in accordance with the JORC Code of 2012. Number differences may occur
due to rounding errors.
Page | i
EXECUTIVE SUMMARY
The new Prospecting Right (PR 10730) granted by the South African Department of Mineral
Resources and Energy (“DMRE”) supports West Wits’ long-term strategic expansion of the Qala
Shallows project. The new PR contains new Mineral Resources that provide a material update to the
Company’s existing Mineral Resource Estimate (“MRE”)1 and will thereby provide opportunities for a
longer-term increase in planned production.
The PR grant facilitates an increase of the current MRE by a significant 749 000 ounces (“oz”) to
5.025 Moz @ 4.66 g/t Au. This uplift in Mineral Resources provides the potential to prolong the
operational lifespan and increase production of West Wits' project at Qala Shallows. At present, the
Definitive Feasibility Study (“DFS”) for Qala Shallows reports an Ore Reserve of 4.03 million tonnes,
amounting to 351,400 oz of gold and total production of 924,000 oz over 17.7-year Life-of-Mine
(“LOM”) including Inferred Mineral Resources2.
Image 1 shows the awarded PR's geographical location relative to West Wits' existing Mining Right
(“MR”). The PR represents a seamless extension towards the west and at a deeper extension, with a
specific focus on the Kimberley Reef. The WBP focusses on three distinct independent reefs namely
Kimberley Reef (K9B & K9A); Bird Reef (BR) and Main Reef (MR & MRL).
IMAGE 1: WBP: MINING RIGHT (BLUE); PROSPECTING RIGHT AWARDED (YELLOW); OLD
PROSPECTING RIGHT (RED)
Page | ii
BACKGROUND
West Wits engaged Shango Solutions ("Shango") in 2021 to undertake the modelling and reporting of
Mineral Resources associated with the Kimberley Reef’s K9B and K9A reefs, including the PR 10730
area. The 2021 exploration program3 represented an update to the previous MRE conducted in 2020.
Notably, this update involved a new drilling campaign conducted in the shallow eastern region of the
project during 20213.
The focus of the 2020/2021 drilling program was geared towards elevating a portion of the existing
Inferred Mineral Resources to the higher Indicated Mineral Resource category. The Mineral Resource
report for 2021 was formulated with consideration of the boundaries defined by the West Wits MR
exclusively. However, West Wits expressed a specific request for the geological modelling and MRE
process to incorporate both the prior PR (GP 30/5/1/1/2/183) and new areas within the potential
perimeter of the forthcoming MR, as illustrated in Image 2. This request was made in the anticipation
of the impending MR grant. Consequently, the Company submitted an application for a fresh PR
(PR10730) in February 2023, strategically adjoining the existing MR boundaries. The Mineral
Resources for the K9B and K9A reefs are reported utilising the 2021 PR block model prepared by
Shango which covers this area.
IMAGE 2: PR10730 (RED) & MR (BLACK). K9B & K9A MINERAL RESOURCES WERE DECLARED WITHIN
THE MR AREA. THE 2021 KIMBERLEY PROJECT AREA AS PER THE MR PERIMETER IS DENOTED BY
ORANGE CROSS-HATCHING. PR GP 30/5/1/1/2/183 (BEIGE) FELL AWAY WITH THE GRANTING OF THE
MRE.
Page | iii
NEXT STEPS
With the grant of the new PR, geological work will now be initiated to identify additional exploration
targets. West Wits plans to initiate additional geological exploration endeavours to refine and
expand the understanding of the Mineral Resources within this designated area. This includes:
•
•
•
Collation of historical geological data
Desktop geological studies and interpretations
Geological modelling and MRE estimation and reporting
Concurrently, the Company also plans to progress with advanced mining studies aimed at enhancing
the economic feasibility of the WBP. These comprehensive viability assessments will encompass
various aspects, including the evaluation of increased production rates.
Images 3 and 4 outline the Mineral Resource models and classification levels held on both the K9B
and K9A horizons on the Kimberley Reef.
IMAGE 3: K9B MINERAL RESOURCE CLASSIFICATION
Page | iv
IMAGE 4: K9A MINERAL RESOURCE CLASSIFICATION
SHANGO SOLUTIONS TECHNICAL SUMMARY
The GP 30/5/1/1/2/183 (10035) PR was originally held by Durban Roodepoort Deep (Pty) Ltd. In 2012
West Wits signed a contractual agreement with the PR holder allowing the prospecting of
underground Mineral Resources. On 1 February 2018 the application for consent in terms of Section
11 (1) of the Mineral and Petroleum Resources Development Act, Act 28 of 2002 to cede the
renewed GP 30/5/1/1/2/183 (10035) PR to West Wits MLI (Pty) Ltd was accepted. West Wits holds
66.6% in the Company with the remaining 33.6% being held by Lilitha (Pty) Ltd, a black empowered
entity ensuring compliance with South African laws.
The PR was renewed for 3 years in April 2016. A MR application was submitted in April 2018. West
Wits is proposing to establish a mining operation in an area located south of Roodepoort and to the
north of Soweto in the City of Johannesburg Metropolitan Municipality, Gauteng. The DMRE granted
West Wits the application for a MR for gold, uranium and silver on 16 July 2021 over various portions
of the farms Roodepoort 236 IQ, Roodepoort 237 IQ, Tshekisho 710 IQ, Uitval 677 IQ, Vlakfontein
238 IQ, Vogelstruisfontein 231 IQ, Vogelstruisfontein 233 IQ, Witpoortjie 245 IQ and Glenlea 228 IQ.
The DMRE formally accepted West Wits’ scoping study including the plan of study for Environmental
Impact Assessment during 2019. The DMRE thereafter granted the Environmental Authorisation
(“EA”) on 24 June 2020. The EA was subjected to public participation for 20 calendar days.
South Africa’s Minister of Forestry, Fisheries and the Environment, through a detailed written appeal
decision, dismissed three appeals lodged against the DMRE EA approval. The Minister’s decision
Page | v
reinstated the DMRE’s EA approval, initially granted 24 June 2020, and paved the way to complete
the granting of the MR application through the DMRE. The Company’s MR was granted on 20 July
2021.
Image 5 depicts the West Wits MR in South Africa’s Central Rand Group goldfield.
IMAGE 5: THE WBP MR AND NEW PR AREAS IN THE CENTRAL RAND GOLDFIELD
During February 2023, West Wits applied for the new PR (PR 10730) which abuts the MR.
Subsequently, on request, Shango has reported Mineral Resources for the K9B and K9A reefs utilising
the prepared 2021 PR block model which covers this area. The MREs are in compliance with
international best practices, including JORC (2012).
K9B and K9A Mineral Resources Research Method
Simple and Ordinary Kriging was performed within 50m parent cells per estimation domain. Search
configurations were optimised employing a combined Kriging Neighbourhood Analysis and a cross
validation approach. Ordinary Macro Kriging of channelisation probability was performed into 500m
parent cells for the Inferred Mineral Resource. Grade and fraction above 2 g/t cut-off were calculated
from the theoretical grade distribution of 50m smallest mining unit cells. Within the K9A reef the
eastern portion of the project appeared to follow a different grade distribution to the historically
western, mined-out portion of the project. Subsequently, the K9A was divided into eastern and
western portions which were treated separately for estimation. Within the western portion the
standard methodology as mentioned above was applied. Within the eastern portion a simulation of
channel probability was performed within 10m parent cells considering 50 simulations. These
Page | vi
simulations were applied to calculate the grade and tonnage above cut-off using a similar
methodology as discussed above.
Historically, no by-products were recovered, hence no quantification or estimation was performed in
this regard. Although the presence of pyrite resulted in severe acid mine water, sulphide was also not
quantified and estimated. Selective mining units were considered to be the estimation parent cells of
50 x 50m, which is slightly larger than the area of the general mining panel length of 30m multiplied
by half of the inter-raise distance of 120m.
The resultant Mineral Resource tabulations for the K9B and K9A reefs are presented in Table 2. The
MREs were informed by underground face channel and stretch sampling, prospects and diamond
drillholes collated from historical plans and vertical projections. The K9A and K9B reef models were
depleted for historical mining, the project perimeter, structural features and the captured dyke
positions. Unknown geological losses of 5% and 10% were applied to the Measured and Indicated
Mineral Resource categories, respectively. Unknown geological loss of 15% was applied to the
Inferred Mineral Resource.
Page | vii
TABLE 2: K9B AND K9A REEF (JORC, 2012) MINERAL RESOURCE STATEMENT AS OF DECEMBER 2024 (REPORTED WITHIN THE PERIMETER OF PR 10730)
Channel
Stoping
Tonnage
Grade
Metal
Mineral Resource
Width
Width
Reef
Category
t
g/t
g
kg
oz
cm
cm
K9A
Measured
589 475
4.95
2 919 959
2 920
93 879
104
107
K9A
Indicated
498 498
5.01
2 498 446
2 498
80 327
108
108
K9A
Measured and Indicated
1 087 973
5.01
5 418 405
5 418
174 206
106
107
K9A
K9B
K9B
K9B
Inferred
Grand Total K9A
1 047 945
2 135 919
5.27
5.12
Measured
Indicated
308 285
538 015
Measured and Indicated
Indicated
Grand Total K9B
846 300
1 461 182
2 307 482
•
•
•
•
177 510
351 716
98
102
101
104
532
534
5.18
5.92
1 596
3 187
51 307
102 460
111
111
115
113
595
669
5.65
5.18
5.35
4 782 683
7 568 922
12 351 604
4 783
7 569
12 352
153 767
243 346
397 113
111
100
104
114
100
105
643
518
562
Mineral Resources are reported in accordance with JORC (2012).
Cut-off values are reported applying a gold price of $ 1 500/oz and ZAR 15.00/1 US$.
All Mineral Resources exclude geological structural loss.
Mineral Resources are reported as in-situ tonnes.
Any discrepancies in totals are due to rounding.
5% for the Measured Mineral Resource Category
10% for the Indicated Mineral Resource Category
15% for the Inferred Mineral Resource Category
Cut-off Grade: 2 g/t
Density:
530
541
539
5 521
10 940
The following tonnage discounts factors have been applied for unknown geological losses:
•
•
•
•
•
cmg/t
5 521 181
10 939 586
K9B
1 595 811
3 186 871
Notes:
•
Content
2.73
t/m³
Page | viii
Table 3 reflects the global WBP updated JORC 2012 compliant Mineral Resource inventory.
TABLE 3: UPDATED GLOBAL MRE FOR THE WITWATERSRAND BASIN PROJECT AT 2.0G/T CUT-OFF
WBP – Updated Global Mineral Resource Estimate
Grade (g/t
Ounces
Category
Tonnes (M)
Au)
Measured
10.70
4.60
1 595 000
Indicated
12.29
4.19
1 700 000
Measured & Indicated
23.00
4.45
3 295 000
Inferred
10.49
5.10
1 730 000
Total
33.49
4.66
5 025 000
Notes: The global MRE is set at a 2.0 g/t Au cut-off and reported in accordance with the JORC Code of 2012. Number differences may occur
due to rounding errors.
Approved for release by the Company’s Chairman.
Michael Quinert
Chairman
West Wits Mining Limited
For further information contact:
Keith Middleton
keith@middletoncorporate.com.au
General info@westwitsmining.com
www.westwitsmining.com
ABOUT WEST WITS MINING LIMITED
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) is focused on the exploration, development and
production of high value precious and base metals for the benefit of shareholders, communities and
environments in which it operates. Witwatersrand Basin Project, located in the proven gold region of Central
Rand Goldfield of South Africa boasts, a 5.02Moz gold project at 4.66g/t1. The Witwatersrand Basin is a largely
underground geological formation which surfaces in the Witwatersrand. It holds the world's largest
known gold reserves and has produced over 1.5 billion ounces (over 40,000 metric tons), which represents
about 22% of all the gold accounted for above the surface. In Western Australia, WWI is exploring for gold and
copper at the Mt Cecilia Project in a district that supports several world-class projects such as Woodie Woodie
manganese mine, Nifty copper and Telfer gold/copper/silver mines.
1.
The original report was “WBP’s Global JORC Mineral Resource Expands by 724,000oz to 4.28MOZ at 4.58 g/t Gold”
which was issued with consent of the Competent Person, Mrs Cecilia Hattingh. The report was released to the
ASX on 3 December 2021 and can be found on the Company’s website (https://westwitsmining.com/). Comprising
8.8MT at 4.60g/t for 1.449Moz measured, 11.3MT at 4.19g/t for 1.517Moz Indicated, and 8MT at 5.10g/t for
1.309Moz inferred. The Company is not aware of any new information or data that materially effects the
information included in the relevant market announcement and, in the case of Mineral Resources or Ore
Page | ix
2.
3.
Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant
market announcement continue to apply and have not materially changed. The form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcement.
The original report was “Updates to Qala Shallows DFS provide improved results for Witwatersrand Basin Project”
which was issued with consent of the Competent Person, Mr. Andrew Pooley. The report was released to the ASX
in July 2023 and can be found on the Company’s website (https://westwitsmining.com/). The Company is not
aware of any new information or data that materially effects the information included in the relevant market
announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
The original report was “Restated JORC Resource of 3.55Moz Au for Mining Right” which was issued with consent
of competent persons Mr Hermanus Berhardus Swart, it was released to the ASX on 23rd July 2021 and can be
found on the Company’s website (https://westwitsmining.com/). Comprising 4.91MT at 4.33g/t for 683koz
measured, 12.7MT at 3.84g/t for 1.57Moz Indicated, and 8.31MT at 4.86g/t for 1.298Moz inferred. The Company
is not aware of any new information or data that materially effects the information included in the relevant
market announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to apply and
have not materially changed. The form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcement.
Page | x
APPENDIX A
Competent Person
The information in the report to which this statement is attached that relates to the updated Mineral
Resources is based on information compiled by Mr Hermandus Berhardus Swart. Mr Hermanus
Berhardus Swart is a Competent Person who is a Professional Natural Scientist registered with the
South African Council for Natural Scientific Professions (No. 400101/00) and a Fellow of the
Geological Society of South Africa, each of which is a “Recognised Professional Organisation” (RPO).
Mr Hermanus Berhardus Swart has sufficient experience that is relevant to the style of mineralisation
and type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves”. Mr Hermanus Berhardus Swart consents
to the inclusion in the report of the matters based on his information in the form and context which
it appears.
Relationship of Competent Person to Issuer
Mr Hermanus Berhardus Swart is a full-time employee of Shango Solutions, registered as Dunrose
Trading 186 (Pty) Ltd and established in April 2004, provides a diverse range of services to the
mineral and mining sectors. Areas of specialisation include target generation, exploration,
geodatabase compilation and management, geological modelling, resource estimation, mineral asset
valuations, due diligences, desktop project reviews and technical reporting.
Mr Swart provides independent technical geological services to West Wits Mining. Furthermore, Mr
Swart has extensive experience in preparing technical and competent persons’ reports for
exploration and mining companies.
Mr Swart is not employed by or related to any employees, representatives or directors of West Wits
Mining. In addition, neither Shango nor its employees have or have had any personal interest in this
project resulting in a conflict of interest.
Competent Persons Compliance
Dunrose Trading 186 (Pty) Ltd. t/a Shango Solutions
Registration Number: 2004/003803/07
H.H.K. House, Cnr Ethel Ave and Ruth Crescent, Northcliff
Tel: +27 (0)11 678 6504, Fax: +27 (0)11 678 9731, P O Box 2591, Cresta, 2118, South Africa
Directors: Dr. J. K. Schweitzer, S. Weise, L. Wagner and Dr. S. Master
Page | xi
Appendix B
JORC TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling Techniques
JORC Code Explanation
•
•
•
•
Drilling Techniques
•
Drill
Sample Recovery
•
•
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken to ensure
sample representivity and the appropriate calibration
of any measurement tools or systems used.
Aspects of the determination of mineralisation that
are Material to the Public Report.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more
explanation may be required, such as where there is
coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of
detailed information.
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or
other type, whether core is oriented and if so, by what
method, etc.).
Method of recording and assessing core and chip
sample recoveries and results assessed.
Measures taken to maximise sample recovery and
•
Practices During 2020/21
Drilling Campaign
The core was split and the one half submitted for assays. The samples included 2 cm waste
on the footwall and hangingwall of the reef. Samples were on average 20 to 25 cm in
length with a minimum of 10 cm. Samples of the footwall and hangingwall waste were also
taken with a 20 cm sample nearest to the reef followed by two more samples of 40 to 50
cm in length.
•
Diamond drilling was conducted.
•
A minimum of 95% core recovery was required, otherwise holes were re-drilled. Core was
fitted and measured against drill meters provided by driller.
Page | xii
•
Logging
•
•
•
Sub-sampling
Techniques and
Sample Preparation
•
•
•
•
•
•
Quality of
Assay Data and
Laboratory Tests
•
•
•
Verification of Sampling and
•
ensure representative nature of the samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged.
If core, whether cut or sawn and whether quarter, half
or all core taken.
If non-core, whether riffled, tube sampled, rotary split,
etc. and whether sampled wet or dry.
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
The verification of significant intersections by either
•
•
•
•
•
•
•
•
•
Diamond core was sampled and logged geologically and geotechnically to a detail that
supported appropriate Mineral Resource estimations, mining studies and metallurgical
studies.
Core logging was qualitative in nature. Core trays were separately photographed after the
core was fitted and orientated both, dry and wet. Once reef sections were cut, sampled
and marked, photos were once again taken of the final product.
The total length of the relevant core intersections was 100% logged.
Core was cut and half samples were taken.
Individual samples were placed in separate sample bags with two unique number labels of
which one was placed inside the bag and the other one stapled to the outside of the bag,
after which the bags were sealed. Each batch of samples was placed in a large sample bag
and the borehole number and sample numbers marked on the outside of the bag.
Waste and reef samples were taken separately. Reef samples were further split based on
lithology and mineralisation.
Samples were accompanied by blanks and standards. A blank was inserted every time
before and after reef intersections. Each reef intersection was accompanied by certified
reference material appropriate to the expected grade range i.e. low or high grade. Selected
returned pulps were resubmitted under a new number for each batch to serve as a
duplicate field sample.
Sampling was typical of standard practices in the Witwatersrand Goldfield and was
deemed appropriate and representative for the grain size.
•
•
Samples were assayed by fire assay using 25 g charges, applying discounts for silver by
silver discount chart. The standard practice of fire assaying in the Witwatersrand Goldfield
was deemed appropriate and representative for the samples.
Industry standard fire assays were applied.
The laboratory inserted suitable certified reference samples for calibration purposes and
also participated in round robin exercises with other laboratories to determine precision
and reproducibility. The laboratory is SANAS accredited and is audited on a regular basis in
order to comply with accreditation regulations.
•
10% of pulp samples are analysed at an independent umpire laboratory.
Page | xiii
Assaying
Location of Data Points
Data
Spacing and Distribution
Orientation of
Data in
Relation to
Geological Structure
Sample Security
Audits or Reviews
•
•
•
•
•
•
•
•
•
•
•
•
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry
procedures, data verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral Resource
and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the deposit
type.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.
The measures taken to ensure sample security.
The results of any audits or reviews of sampling
techniques and data.
•
•
•
Twinned holes were not utilised.
Data was captured into Microsoft Excel and then imported into Studio RM.
No assays were adjusted except for capping and cutting during the Mineral Resource
estimation stage.
•
•
•
Collars were surveyed by a qualified surveyor utilising differential GPS.
The WG27 coordinate system (World Geographic Datum) was applied.
Topographic control was achieved utilising differential GPS in the WG27 coordinate
system.
•
Drillhole spacing was suitable to upgrade the previous Inferred Mineral Resource to
Indicated Mineral Resources. Amount of samples present in the areas influenced the
estimation parameters. Kriging efficiency was calculated during the estimation process
which is an indication of the estimates ability to represent the data which was considered
for resource categories.
Each sample section was composited to represent the total reef intersection
•
•
•
•
•
Structures have no known influence on the mineralisation of the Witwatersrand placer
type reefs, other than displacements. No known sampling bias is present.
A 3D model of the reef was established in Leapfrog Geo which also incorporates
structures, predominantly faults and dykes. These structures are defined at high
confidence levels due to their locations being precisely defined by historical mining and
being detailed on mining plans. Structures have no known influence on the mineralisation
of the Witwatersrand placer type reefs, other than displacements.
Line of custody procedures was applied.
Stringent internal audit by the Competent Person and QA/QC procedures were applied.
This especially considered the validation of the databases that served as input for
geological modelling and resource estimation.
Page | xiv
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
Mineral tenement and land tenure
status
Practices During 2020/21
Drilling Campaign
JORC Code Explanation
•
•
Exploration done by other parties
•
Geology
•
Drill hole Information
•
Type, reference name/number, location and ownership
including agreements or material issues with third
parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites,
wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
licence to operate in the area.
•
Acknowledgment and appraisal of exploration by other
parties.
Deposit type, geological setting and style of
mineralisation.
•
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
o
easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the h
Share your feedback
Discover