Mt Cecelia Project DHEM Survey Results
Released
Released
Announcement PDF
ASX Announcement and Media Release
25 July 2023
Mt Cecelia Project
DHEM Survey Results
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) (“West Wits” or “the Company”) is pleased
to announce further advancement on the 2023 ground exploration program by farm-in partner, Rio
Tinto Exploration Pty Limited (“RTX”) at the Mt Cecelia Project in the Paterson Province, Western
Australia.
HIGHLIGHTS
➢ RTX successfully completed the Downhole Electromagnetic (“DHEM”) survey at the Mt
Cecelia Project, focusing on better assessing the conductivity anomalism in the area of
three Reverse Circulation (“RC”) drill holes that intersected gold mineralisation and
sulphides at the primary target SGC_1 in 2022
➢ The DHEM survey results identified potential in two modelled conductivity “plates” to
extend the sulphide zones intersected in holes WEW005 and WEWI001
➢ Diamond drilling is being considered for Q3/Q4 to provide better information regarding
the character and continuity of mineralisation
West Wits Chairman Michael Quinert said, “We are pleased with the successful completion of the
DHEM survey at the Mt Cecelia Project. The identification of potential extensions in the modelled plates
provides encouragement for potential follow up drilling at the project and we look forward to the
continuation of the 2023 Field Season at Mt Cecelia."
SUMMARY
RTX has confirmed the completion of the DHEM survey operation at the Mt Cecelia Project1. The survey
was conducted on three Reverse Circulation (“RC”) drill holes previously reported at the primary target
SGC_1. The aim was to:
(i)
confirm that the modelled plates from the 2021 MLTEM survey were intersected by the
RC drilling
(ii)
identify any off-hole conductors (“near-misses") in the drilling at SGC_1, identifying targets
for potential diamond drilling in Q3/Q4 of 2023
The DHEM survey involved deploying geophysical instruments down the completed drill holes using
wireline technology. Measurements were systematically collected at various positions to identify
conductive zones. This valuable geophysical information will now assist in planning the potential future
diamond drill holes.
The DHEM survey indicated potential in two modelled conductivity plates for extensions of the current
sulphide zones (and possibly gold mineralisation) intersected in holes WEWI0005 and WEWI0001.
However, the remaining plates and intercepts have either been resolved or lack sufficient confidence
levels to be considered viable targets. These survey findings contribute valuable information to the
ongoing exploration efforts at the project.
page i
ASX Announcement and Media Release
25 July 2023
INTERPRETATION OF DHEM RESULTS AND ANOMALIES
In 2022, RTX successfully completed 1,036 meters of RC drilling on target SGC_1 across four holes. The
completed drill holes allowed downhole access for the subsequent DHEM surveys. Assay results
received for holes WEWI0001 and WEWI0004, reported on January 17, 2023 2, highlighted significant
intervals of gold mineralisation, with both holes ending in gold mineralisation:
•
(WEWI0001) 56m @ 0.55g/t Au from 194m
including 20m @ 0.93g/t Au from 194m
•
(WEWI0004) 82m @ 0.51g/t Au from 128m
including 24m @ 0.95g/t Au from 150m
In 2023, the RTX team collected DHEM data from three drilled holes for two main purposes. Firstly,
they wanted to verify if the MLTEM modelled plate was adequately intersected by the drilling
campaign conducted that year. Secondly, they aimed to determine if there were any nearby areas of
conductivity anomalism that were almost hit during drilling that are additional targets worth drill
testing.
It is noted that the understanding of the nature and genesis of the gold mineralisation intersected in
the 2022 drilling and its relationship with the sulphide minerals (which typically manifest as EM
conductivity anomalies) also intersected remains relatively poor.
Figure 1 shows a map of the 2022 drill hole locations, the two DHEM “loops” (in yellow and blue) and
interpreted late channel EM conductivity. The DHEM data was analysed and models created of four
plate anomalies. RTX's team was able to identify connections between these plates and the sulphide
intercepts found in the drilling data previously reported. These plates are considered to represent
likely extensions of the known sulphide intercepts found in the three holes.
FIGURE 1 2023 DHEM SURVEY AREA (WITH CH35BZ LATE CHANNEL) EM CONDUCTIVITY MAP
page ii
ASX Announcement and Media Release
25 July 2023
Figure 2 presents supporting models that combine the interpreted EM data with drilling assay results
for gold (Au), copper (Cu), nickel (Ni), and sulphur (S), along with magnetic susceptibility
determinations. No unexpected conductors were found outside the drilling holes, indicating no missed
targets. However, the results suggest the potential for extending the current mineralisation.
FIGURE 2: GRAPHICAL SUMMARY OF MODELLED PLATES
The survey identified two conductive plates at the primary target SGC_1. These targets are being
considered for further investigation through potential diamond drilling in late Q3/Q4 of 2023.
NEXT STEPS
The Mt Cecelia 2023 Exploration Program is in full swing, with the following next steps:
1. Potential diamond drilling to test interpreted conductors at SGC_1. RTX is considering possible
diamond drilling in late Q3/Q4 of 2023. This will focus on the interpreted conductors at SGC_1,
utilising existing heritage cleared areas.
2. Ongoing interpretation and assessment of the nature of the mineralisation intersected at
SGC_1 will be undertaken as a basis for better considering the merits and type of further
exploration undertaken at the project.
Note that the activities and timing mentioned are subject to continuous reassessment due to various
factors. These factors include weather conditions, the timing of heritage clearance, and the
availability of drill rigs.
Approved for release by the Company’s Chairman.
Michael Quinert
Chairman
West Wits Mining Limited
For further information contact:
Keith Middleton
keith@middletoncorporate.com.au
General info@westwitsmining.com
www.westwitsmining.com
page iii
ASX Announcement and Media Release
25 July 2023
ABOUT WEST WITS MINING LIMITED
West Wits Mining Limited (ASX: WWI) (OTCQB: WMWWF) is focused on the exploration, development and
production of high value precious and base metals for the benefit of shareholders, communities and
environments in which it operates. Witwatersrand Basin Project, located in the proven gold region of Central
Rand Goldfield of South Africa boasts, a 4.28Moz gold project at 4.58g/t3. The Witwatersrand Basin is a largely
underground geological formation which surfaces in the Witwatersrand. It holds the world's largest
known gold reserves and has produced over 1.5 billion ounces (over 40,000 metric tons), which represents about
22% of all the gold accounted for above the surface. In Western Australia, WWI is exploring for gold and copper
at the Mt Cecelia Project in a district that supports several world-class projects such as Woodie
Woodie manganese mine, Nifty copper and Telfer gold/copper/silver mines.
Competent Person’s Statement – Exploration Results
The information presented herein that relates to results from the Mt Cecelia drilling program is based on
information compiled and reviewed by the Martin Bevelander, the Competent Person who is a Member of
SACNAS Reg. # 400158/07 – The South African Council of Natural Scientific Professions and fairly represents this
information. Mr Bevelander has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration, and to the activities undertaken, to qualify as a Competent Person as defined in the 2012
Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves. Mr Bevelander is a WWI employee and consents to the inclusion in the
report of the matters based on his information in the form and context in which it appears.
1.
2.
3.
WWI ASX Release 11/05/2023 “Mt Cecelia Project 2023 Season Commences with DHEM Surveys”
The original report was “Significant Maiden Gold Intercept at Mt Cecelia” which was issued with consent of Competent
Person, Mr. Martin Bevenlander. The report was released to the ASX on 18/01/2023 and can be found on the Company’s
website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially
effects the information included in the relevant market announcement. The form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcement.
The original report was “WBP’s Global JORC Mineral Resource Expands by 724,000oz to 4.28MOZ at 4.58 g/t Gold” which
was issued with consent of the Competent Person, Mrs Cecilia Hattingh. The report was released to the ASX on 3
December 2021 and can be found on the Company’s website (https://westwitsmining.com/). Comprising 8.8MT at
4.60g/t for 1.449Moz measured, 11.3MT at 4.19g/t for 1.517Moz Indicated and 8MT at 5.10g/t for 1.309Moz inferred.
The Company is not aware of any new information or data that materially effects the information included in the relevant
market announcement and, in the case of Mineral Resources or Ore Reserves, that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcement.
page iv
ASX Announcement and Media Release
25 July 2023
APPENDIX A
E45/5045 DHEM SURVEY DRILLING - JORC (2012) TABLE 1 REPORT
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
•
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
•
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Reporting results from Down Hole Electromagnetic (DHEM) survey undertaken in April-May
2023 across 3 of the 4 drill holes drilled at the
project in 2022 targeting an identified conductivity
anomaly (“SGC-1") from a 2021 MLTEM survey and
previous airborne SkyTEM survey.
• Geophysical data collected from two DHEM loops
(DH2 and DH3) covering the 3 holes.
• DHEM tool specific calibration techniques were
used by the geophysical contractor (Vortex
Geophysics)
• No drilling involved in this report
•
Aspects of the determination of
mineralisation that are Material to the
Public Report.
•
In cases where ‘industry standard’ work has
been done this would be relatively simple
(eg ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
•
Drill type (eg core, reverse circulation, openhole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
Drilling
techniques
•
No drilling involved
page v
ASX Announcement and Media Release
25 July 2023
Criteria
JORC Code explanation
what method, etc).
Drill sample
recovery
•
Method of recording and assessing core and
chip sample recoveries and results assessed.
•
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
•
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
•
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining studies
and metallurgical studies.
•
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
•
The total length and percentage of the
relevant intersections logged.
•
If core, whether cut or sawn and whether
quarter, half or all core taken.
•
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
•
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
•
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
•
Measures taken to ensure that the sampling
is representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
•
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
•
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
Logging
Subsampling
techniques
and sample
preparation
Quality of
assay data
and
laboratory
tests
•
For geophysical tools, spectrometers,
Commentary
No sampling involved
•
No drilling or sampling involved
•
No drilling or sampling involved
• The 2023 DHEM survey was acquired to the below
specifications:
Contractor: Vortex Geophysics
page vi
ASX Announcement and Media Release
25 July 2023
Criteria
Verification
of sampling
and
assaying
Location of
data points
Data
spacing and
distribution
Orientation
of data in
relation to
geological
structure
JORC Code explanation
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
•
Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precision have been established.
•
The verification of significant intersections
by either independent or alternative
company personnel.
•
The use of twinned holes.
•
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
•
Discuss any adjustment to assay data.
•
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
•
Specification of the grid system used.
•
Quality and adequacy of topographic
control.
•
Data spacing for reporting of Exploration
Results.
•
Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
•
Whether sample compositing has been
applied.
•
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
•
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
Commentary
Receiver: SMARTem24
Base Frequency: 25Hz
Average Current 231.9 A
Tx Loop Size: DH2 - 300mx400m | DH3 - 300m x
300m
Station Spacing 20m to 5m downhole
•
All geophysical data is recorded and electronically
backed up on the company’s data back up folders
• DHEM survey completed down previously reported
drillholes with the 2 DHEM loops covering the
location of 3 of the 4 drill holes (WEWI0001,
WEWI0004 & WEWI0005)
•
No drilling or sampling involved
•
No drilling or sampling involved
page vii
ASX Announcement and Media Release
25 July 2023
Criteria
JORC Code explanation
assessed and reported if material.
Commentary
Sample
security
•
The measures taken to ensure sample
security.
•
No drilling or sampling involved.
Audits or
reviews
•
The results of any audits or reviews of
sampling techniques and data.
•
The DHEM survey was conducted by an external
independent 3rd party geophysical consultancy with
Rio Tinto Exploration Pty Limited (RTX) managing
the project
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
Statement
Commentary
Mineral
tenement and
land tenure
status
•
•
The DHEM survey was done along drillholes located
within Exploration License E45/5045 located
~260km ESE of Port Hedland in the East Pilbara
region of Western Australia. Refer Figure 1 in the
body of this report.
•
E45/5045 was granted to Northern Reserves Pty
Ltd (“NRPL”), a wholly owned subsidiary of West
Wits Mining Limited, on 28 May 2019 and is
currently due to expire on 27 May 2024.
•
E45/5045 is subject to the “Mt Cecelia Farm-in and
Joint Venture Term Sheet” between Rio Tinto
Exploration Pty Limited (“RTX”) and NRPL dated 9
December 2021, pursuant to which RTX has
exclusive rights to explore and earn up to an 80%
interest in E45/5045 in stages by sole funding
A$10m of exploration.
•
E45/5045 is subject to a 1% Net Smelter Royalty
payable to the original private owners of NRPL.
•
E45/5045 lies within parts of the determined
Native Title lands of the Nyangumarta, Martu and
Nyamal Traditional Owner groups. The SGC-1
target sits within the Nyangumartu determined
Native Title lands with whom an exploration and
heritage agreement is in place in relation to
exploration activities on E45/5045.
•
E45/5045 partly overlaps with an area over which
the proposed Asian Renewable Energy Hub holds
an Option to Lease. An access agreement is in place
in relation to any overlapping activities.
•
There are no reserves, national parks or other
known material impediments to exploration in the
primary target areas, including SGC-1, on
•
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
page viii
ASX Announcement and Media Release
25 July 2023
Criteria
Statement
Exploration
done by other
parties
•
Acknowledgment and appraisal of
exploration by other parties.
Geology
•
Deposit type, geological setting and style
of mineralisation.
Commentary
E45/5045.
Previous explorers in the area include PGN
Geoscience, Rumble Resources, Newcrest Mining,
Great Sand Resources and most recently, RTX.
Limited relevant mineral exploration activity in the
area of interest (at SGC-1) has previously been
completed, and this has been restricted to broad
spaced geophysical surveys with the nearest publicly
reported drilling several kilometres away.
•
The geological setting of the target area is
relatively poorly understood, being proximal to the
boundary of the Proterozoic Paterson Orogen and
the Archean Pilbara Craton, much of which is
concealed beneath more recent sedimentary
cover. The major Vines Fault structure is
interpreted to run broadly NNE-SSW through the
centre of E45/5045.
•
The drilling was targeting an EM anomaly that may
have represented base metal sulphide
mineralisation potentially associated with mafic
and ultramafic intrusive rocks beneath more
recent cover sediments.
•
The drilling intersected variably altered (and in
parts, oxidised) metasediments with some minor
disseminated sulphides and variable quartz
veining, with some mafic units intersected in some
holes.
•
According to historical reports, the majority of
outcrop on E45/5045 is identified as the
Nimingarra Formation and comprises banded-iron
formations (BIF), jaspilite, banded, ferruginous
chert and black shales and is intruded by syenogranites - felsic intrusions which occur footwall to
the intermediate to mafic, amygdaloidal basalts of
the Kylena Formation. The initial interpretation
suggests that a folded BIF sequence is juxtaposed
by a series of steep structures. The magnetics
further suggests a series of demagnetised zones
internal to the BIF. The hypothesis is that these are
likely host to potential orogenic gold mineralising
systems. The felsic intrusive units of the
Warrawagine granitoid intrusive complex (AgWc)
comprise medium to coarse-grained (porphyritic)
monzogranites, syeno-granites (alkalic) and
granodiorites. These intrusive units have been
mapped at the margins of the BIF outcrop and are
interpreted to have intruded into the footwall of
page ix
ASX Announcement and Media Release
25 July 2023
Criteria
Drill hole
information
Statement
•
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
Commentary
the BIF sequence. The juxtaposition of a folded,
faulted BIF sequence that is intruded by alkalic
intrusions into a sequence containing reducing
shale units, adjacent significant shear zones
presents both a structural, rheological and
chemical/redox trap that is highly prospective for
orogenic gold.
•
According to literature, the Kylena and Jeerinah
Formations, which comprise mixed volcanics
(mainly basalts, but also rhyolites, andesites &
tuffs), carbonaceous (shales, limestones,
dolomites) and other sedimentary units, occur
within the tenement area, are also prospective for
VMS (including VHMS) deposits. These formations
represent bimodal sequences prospective for
mineralisation hosted within early graben and
feeder structures that have been subsequently
deformed and focused into low-strain
environments including hinge positions, and
dilational sites.
•
The DH EM was done down the drillholes
previously reported in an effort to better
understand possible conductive responses in and
around the immediate area of the completed
drilling
•
No drilling results being reported at present
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
•
If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does
not detract from the understanding of
the report, the Competent Person should
clearly explain why this is the case.
page x
ASX Announcement and Media Release
25 July 2023
Criteria
Statement
Commentary
Data
aggregation
methods
•
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
•
No drilling or Sampling involved.
•
Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should be
shown in detail.
•
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
•
These relationships are particularly
important in the reporting of Exploration
Results.
•
•
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
Given the lack of outcrop, historical drilling and
definitive geophysical data interpretations, the
DHEM survey was done to confirm the previously
identified EM target was intersected by the
previously reported drilling, and to determine the
presence of any additional off-hole conductors.
•
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).
Diagrams
•
Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
•
A relevant map and results of the DHEM survey,
with relevant modelled DHEM plate diagrams, are
included in the body of the announcement.
Balanced
reporting
•
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
•
All information considered material to the reader’s
understanding of the Exploration Results has been
reported.
Other
substantive
exploration
data
•
Other exploration data, if meaningful
and material, should be reported
including (but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk samples
– size and method of treatment;
metallurgical test results; bulk density,
•
All information considered material to the reader’s
understanding of the Exploration Results has been
reported.
•
Details of all airborne, ground electromagnetic
survey results at SGC-1 as well as the current DHEM
outcomes are provided in previous ASX releases
made by West Wits Mining Ltd and available to
Relationship
between
mineralisation
widths and
intercept
lengths
page xi
ASX Announcement and Media Release
25 July 2023
Criteria
Statement
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Commentary
view on www.westwitsmining.com and
www.asx.com.au
Further work
•
The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling).
•
Interpretations and planning of further work is
continuing now that the DHEM work is successfully
completed.
•
•
Diagrams clearly highlighting the areas
of possible extensions, including the main
geological interpretations and future
drilling areas, provided this information is
not commercially sensitive.
Future work may also include further diamond
drilling and petrographic analysis to better
understand the nature of the mineralisation style.
page xii