Annual Report to shareholders
Released
Released
Announcement PDF
West Wits Mining Limited
Contents
30 June 2024
Corporate directory
Chairman's Letter
Review of Operations
ORE Reserve and MRE Statement
Directors' report
Auditor's independence declaration
Statement of profit or loss and other comprehensive income
Statement of financial position
Statement of changes in equity
Statement of cash flows
Notes to the financial statements
Consolidated entity disclosure statement
Directors' declaration
Independent auditor's report to the members of West Wits Mining Limited
Shareholder information
1
2
3
4
17
21
38
39
40
41
42
43
59
60
61
65
West Wits Mining Limited
Corporate directory
30 June 2024
Directors
Mr Michael Quinert, Executive Chairman
Mr Jac van Heerden, Non-Executive Director
Mr Hulme Scholes, Non-Executive Director
Mr Warwick Grigor, Non-Executive Director
Joint Company Secretaries
Mr Simon Whyte
Mr Paul Godfrey
Registered office and
Principal place of business
Level 6, 400 Collins Street
Melbourne VIC 3000
Australia
Share register
Automic Pty Ltd
Level 5 126 Phillip Street
Sydney NSW 2000
+61 2 9698 5414
Auditor
William Buck
Level 20, 181 William Street
Melbourne VIC 3000
Solicitors
QR Lawyers
Level 6, 400 Collins Street
Melbourne VIC 3000
Bankers
National Australia Bank
Level 2, 330 Collins Street
Melbourne VIC 3000
Stock exchange listing
West Wits Mining Limited shares are listed on the Australian Securities Exchange
(ASX code: WWI)
Website
https://westwitsmining.com/
2
West Wits Mining Limited
Chairman's Letter
30 June 2024
Chairman’s Letter
Dear Shareholders,
On behalf of the Board of Directors, I am pleased to present West Wits' (ASX: WWI; OTCQB: WMWWF) Annual Report for
the fiscal year ended 30 June 2024.
The journey of the Company from explorer to mine operator is nearing an end. It has presented many challenges and has
taken longer than any of us anticipated. As I write, we are in the final phases of a detailed due diligence process with two large
South African based financial institutions.
On securing the funding to build Qala Shallows, our focus must and will turn immediately to the efficient execution of the
project. Our planning is well advanced. The principal mine contract terms have been finalised, and the contractor is ready to
commence. The site is prepared, and all critical infrastructure is in place. Our power and water requirements are secured and
permitted. Equipment supply arrangements are negotiated and costed, with trackless machines and hydro-powered tools
ready for deployment to the site. The team has left no stone unturned to ensure that Qala Shallows is ready to start.
With these plans in place and our existing site infrastructure, Rudi Deysel and his team should have new ore going onto the
stockpile eight weeks from the commencement of operations. Then, the stockpile will be built up over six months or so before
we start sending ore to the plant for processing into gold. The project development phase will last a little over three years,
after which we will ramp up to steady-state production of some 70,000 oz of gold per annum at a forecasted all-in cost of
under US$1,000 per oz. As with any mining operation, there are many risks that we expect will disrupt the plan. Accordingly,
we have built in contingencies for overruns and delays to ensure we maintain a level of agility and capacity to deal with those
sorts of inevitable disruptions.
That said, the path forward is now more in our control than previously. We have set out and articulated in detail our mine plan.
Having publicly set the goals, it is our responsibility to achieve those outcomes. Our shareholders and the market, in general,
will rightly measure our performance, and we will be accountable. The team is ready and now looks forward to the test of
meeting that challenge.
We have been the beneficiary of a supportive and very patient cohort of shareholders. Their ongoing encouragement and
reassurance have been key motivators for me and the whole team. It is our responsibility to vindicate that loyalty, and we
intend to work hard to make that happen.
Michael Quinert
Executive Chairman
3
West Wits Mining Limited
Review of Operations
30 June 2024
REVIEW OF OPERATIONS
HIGHLIGHTS
QALA SHALLOWS MINE
➢
Due diligence by South African Development Finance Institution (“DFI”) for proposed ZAR300 million (approx. US$15.8
million) debt facility substantially completed
➢
Negotiations with a commercial bank for a larger syndicated senior debt loan alongside the DFI. The bank has begun
due diligence and is moving towards approval
➢
Strong prospects for increasing bank debt to cover 50% to 60% of the development funding
➢
Turn-key ready with all regulatory approvals in place (Mining Right, Environmental, Power, Water, Explosives), site
infrastructure maintained and updating key supplier contracts to enable production ramp-up upon securing project finance
Updated Definitive Feasibility Study (“DFS”)1
➢
Gold Production: ~924,000 ounces over an 18-year Life-of-Mine
➢
Steady-State production: ~70,000oz pa for 9 years
Robust Financial Position – DFS Results1 based on US$1,850/oz Gold Price
➢
Steady-State All-In-Sustaining-Cost: US$871/oz
➢
Free Cashflow: US$522M
➢
Pre-tax NPV7.5: US$367M
➢
Post-tax NPV7.5: US$255M
➢
Peak Funding: US$54M with payback period of 13-months from end of construction
➢
Current Ore Reserve: 4.03 million tonnes at 2.71g/t for 351,400 oz gold
West Wits Mining Limited (ASX:WWI) (OTCQB:WMWWF) (“West Wits” or “the Company”) is focused on the exploration,
development and production of high-value precious and base metals for the benefit of shareholders, communities, and the
environments in which it operates.
Currently, the Company focuses on gold and uranium and operates in two stable jurisdictions, namely South Africa and
Australia.
SOUTH AFRICA
Witwatersrand Basin Project (“WBP”); Central Rand (WWI: 66.6%), Gauteng Province
Located in the proven gold region of Central Rand Goldfield in South Africa, WBP presents a significant revenue opportunity
of USD 1.7 billion1 for stage 1 alone and boasts a global Mineral Resource Estimate (“MRE”) of 29.0Mt at 4.58g/t for 4.27Moz
gold2 (inclusive of Ore Reserves). The Witwatersrand Basin is a largely underground geological formation that surfaces in the
Witwatersrand. It holds the world's largest known gold reserves and has produced over 1.5 billion ounces (over 40,000 metric
tons), which represents about 22% of all the gold accounted for above the surface. The WBP’s DFS financial results present
a pre-tax NPV7.5 of USD 367 million and an IRR of 61% at a gold price of USD 1,850/oz 1.
Flagship Qala Shallows Project
Qala Shallows, Stage 1 of the WBP, is strategically designed to leverage its location, ensuring easy access with minimal
disruption. An optimised the mine plan incorporates mechanised equipment, including electrohydraulic and hydropower tools
to establish an environmentally responsible project. Future initiatives will explore sustainable technologies, such as batterypowered vehicles and solar power, while the infrastructure will feature wheeled mechanised equipment like drill rigs and
loading machinery. Expected to generate 1,000 direct jobs, the project will significantly benefit local employment.
4
West Wits Mining Limited
Review of Operations
30 June 2024
Image 1 shows the WBP, Qala Shallows and its close proximity to Johannesburg city centre.
IMAGE 1: LOCATION OF THE WBP AND FLAGSHIP QALA SHALLOWS PROJECT
Following the release of Qala Shallows’ updated DFS in July 2023, West Wits secured a pathway to obtain loan facilities of
US$15.9 million from a South African Development Finance Institution, subject to meeting specific criteria. The DFI began its
due diligence in February 2024 and substantially completed it in June 2024. In May 2024, a Mining Finance Specialist was
appointed, who led negotiations with a commercial bank in June 2024 with aims to involve the bank in a larger syndicated
senior debt loan with the DFI to potentially increase bank debt coverage to 50% to 60% of the development funding
requirement.
The commercial bank’s due diligence commenced in July 2024. Should the syndicated loan be secured, the Company will
continue to seek additional funding sources to meet the remaining project requirements, providing shareholders with costeffective, and as far as possible non-dilutive financing. Further updates on funding initiatives will be provided as they become
available.
Qala Shallows – DFS Financial Projections
Financial projections in the DFS are robust, with Free Cashflow estimated at US$522M, Pre-tax NPV7.5 at US$367M, and
Post-tax NPV7.5 at US$255M. The peak funding requirement is estimated at US$54M, with a payback period of 4.1 years from
commencement of construction and 13 months from completion of the project development program.
The sensitivity analysis in Table 1 demonstrates the project's strong financial outcomes, particularly given the current
favourable gold price. The table provides evaluations at gold prices of $1,850/oz (which is substantially lower than prevailing
market) and $2,200/oz, highlighting the project's resilience.
TABLE 1: BASE CASE - FINANCIAL EVALUATION OUTCOME FOR QALA SHALLOWS1
QALA SHALLOWS – FINANCIAL
GOLD PRICE
GOLD PRICE
EVALUATION
US$1,850/oz
US$2,200/oz
US$ 367m
US$ 531m
Pre-Tax Net Present Value 7.5
Post-Tax Net Present Value 7.5
US$ 255m
US$ 366m
Post-Tax Internal Rate of Return
53%
72%
US$ 54 million
US$ 43 million
4.1 years
3.6 years
Peak Funding
Payback from commencement of mine
construction
* Includes Inferred Resources
5
West Wits Mining Limited
Review of Operations
30 June 2024
QALA SHALLOWS – FINANCIAL
EVALUATION
Total Revenue
GOLD PRICE
US$1,850/oz
US$ 1,709 million
Total Free Cashflow
US$ 552 million
LOM C1 Cost
US$ 818 / oz
LOM All in sustaining Cost
US$ 977/oz
Steady-State All in Sustaining Cost
US$ 871 /oz
Pre-Tax Internal Rate of Return
61%
* Includes Inferred Resources
Image 2 shows Qala Shallows’ cost and free cashflow at a gold price of US$1,850/oz.
IMAGE 2: QALA SHALLOWS COST AND FREE CASHFLOW MODEL
Qala Shallows Production
The updated DFS outlines total production estimate of 924,000 ounces over an 18-year LOM and an average annual
production of 70,000 ounces during a 9-year steady-state period. It takes into account completed CAPEX and new information
obtained, including installation of infrastructure, underground survey data, contractor agreements and market-based cost
escalations. Through new survey and sampling data acquired from underground access, the dip of the ore body was accurately
updated based on actual measurements. This enhanced understanding also allowed the confirmation of new mining blocks
that are available for extraction in the historical mine area.
6
West Wits Mining Limited
Review of Operations
30 June 2024
Table 2 outlines the key production metrics for Qala Shallows.
TABLE 2: BASE CASE - KEY PRODUCTION METRICS FOR QALA SHALLOWS1
QALA SHALLOWS – PRODUCTION DATA*
Life-of-Mine (Construction to Relinquishment)
17.7 years
Total Production (Run of Mine Tonnes)
10.2 million
Max Production Rate (Tonnes)
839,000 pa
Run-of-Mine Grade Au (Average)
3.04 g/t Au
LOM Contained Au
1,005,000 oz
Metallurgical Recovery Au (Overall)
92%
Gold Produced
924,000 oz
Average Annual Gold Production
51,000 oz
Average Annual Steady State Gold Production (9yrs)
70,000 oz
Max Gold Production (Year 6)
75,000 oz
* Includes Inferred Resources
Image 3 outlines Qala Shallows’ production schedule.
IMAGE 3: QALA SHALLOWS ANNUAL GOLD PRODUCTION SCHEDULE 1
Qala Shallows Operational Readiness
The West Wits team continues to maintain the Qala Shallows mine site which is poised for commencement of mining
operations upon securing project finance with critical infrastructure projects completed and key contracts prepared and
ready for execution.
To date, operational activities at Qala Shallows have successfully:
•
•
•
•
Completed all critical infrastructure, including substations and water infrastructure
Completed the decline and box cut rehabilitation
Created initial on-reef underground access
Delivered first ore (estimated stockpile of 3 000t) during an Early Works Program
7
West Wits Mining Limited
Review of Operations
30 June 2024
Image 4 shows the completed infrastructure for Qala Shallows.
IMAGE 4: PRODUCTION READY QALA SHALLOWS MINE
Image 5 shows the underground production plan.
IMAGE 5: QALA SHALLOWS UNDERGROUND PRODUCTION PLAN
West Wits has incorporated in its plans all operational procedures and health and safety standards across all disciplines to
ensure safe, productive, and efficient mining operations. Robust planning and budgeting processes have been developed to
execute planned production at a forecast AISC below US$1,000/oz and project stage gates within the planned capital
expenditure. A quantity surveying company has been engaged to ensure adherence to agreements and sufficient cost
controls. All operational permits are approved.
West Wits team is proactively updating and finalising agreements with key suppliers to ensure a swift startup.
These agreements include:
•
•
Toll Treating Agreement with major mining house, Sibanye-Stillwater Ltd, extended from a 2-year to a 3-year term
minimum term from date of first ore delivery.
Mining Contractor Agreement, aligned with the published 2023 DFS.
8
West Wits Mining Limited
Review of Operations
30 June 2024
•
•
•
•
Supply and Maintenance Agreements with the Original Equipment Manufacturer to ensure high underground
equipment availability and efficiency.
Supply and Service-Level Agreements for hydro-powered in-stope mining equipment to ensure energy-efficient ore
production.
Explosive Supply Agreements to secure a reliable and safe supply of explosives, ensuring uninterrupted mining
operations.
Engineering, Procurement, Construction Management (EPCM) Agreements for constructing permanent infrastructure
while utilising existing infrastructure to produce gold ore.
Key Infrastructure and Approvals
•
Strategic Partnership: Collaboration with Calgro M3 Developments, a local JSE-listed Property Development
firm, to install a vital potable mains water supply pipeline which established permanent infrastructure for local
communities and the Qala Shallows mine.
•
Water Security: Water supply agreement with Johannesburg Water to access mains water which satisfies the
project’s long-term operational requirements.
•
Reliable Power: Approval from Joburg City Power of a substantial 7.5MVA power supply, strategically located at
the newly constructed Fleurhof 88/11kV primary substation ensuring a steady and cost-effective electricity
source. Mains power will be backed up by diesel generation and the Company is assessing opportunities to install
a solar power farm.
•
Explosive License: Approval from the Chief Inspector of Explosives in the South African Police Service. This
critical milestone ensures the Company adheres to stringent safety and regulatory standards, enabling the use of
explosives for mining operations.
•
Road Access and Intersections: Approval from the Joburg Roads Agency for modifications to road intersections
near its operations. This approval is instrumental in improving access to the mine site, enhancing transportation
efficiency for both materials and personnel, and ensuring the safety of the local community and environment by
adhering to best practices in infrastructure development.
WBP Project 200
West Wits is focused on executing the Qala Shallows DFS plan, with Project 200 as a future growth initiative aimed at scaling
the project due to the significant 4.28Moz gold MRE2. This project has the potential to support a much larger production
schedule.
To explore this potential, West Wits commissioned Bara Consulting (“Bara”) to conduct a study to assess the engineering and
other factors needed to achieve a production target of 200,000oz per annum. The trade-off analysis was successful, leading
to a recommendation from Bara to commission a new Scoping Study. This study will evaluate the potential increase in
production and the necessary additional infrastructure, including a process facility, tailings storage, and shafts.
WBP Geology
The WBP comprises three distinct reef mining targets, each slated for sequential development: the Kimberley Reef, Main
Reef, and Bird Reef. Image 6 showcases the three reefs.
9
West Wits Mining Limited
Review of Operations
30 June 2024
IMAGE 6: THE WBP’S THREE INDEPENDENT REEFS
The Kimberley Reef (K9A & K9B) is divided into discrete mining areas known as Qala Shallows and Qala Deeps. The reef
includes the Qala Incline Shaft, a critical part of its infrastructure. This constitutes stage 1 of the WBP known as Qala Shallows.
Qala Deeps offers significant further upside potential as part of the Project 200 initiative.
The Bird Reef is notable for its joint focus on gold and uranium. Situated 800 meters from the Kimberley Reef, this horizon's
orebody could be accessed using Qala Shallows' infrastructure. Although the uranium capacity of Bird Reef remains
underexplored, it represents a valuable opportunity for future development. Importantly, no additional surface mining footprint
would be required to access this reef, minimising environmental impact.
The Main Reef (MR & MRL) targets high-grade gold-bearing remnants and is located 800 meters from the Bird Reef. Access
to the orebody will be through existing shaft infrastructure which will be refurbished ensuring efficient resource extraction.
Additionally, there is an opportunity to explore the North Reef from the Main Reef horizon, a prospect historically overlooked.
Similar to the Bird Reef, no additional surface mining footprint is required for the Main Reef, making it a more environmentally
sustainable option.
WBP Prospecting Right Applications
West Wits has applied for two new Prospecting Rights, PR10839 and PR10730, with the Department of Mineral Resources
and Energy (“DMRE”). In respect to PR10730, covering 739 hectares, the Environmental Authority was approved in May 2023,
but an appeal was lodged against this decision. The appeal was dismissed by the Minister of Forestry, Fisheries, and the
Environment in April 2024, clearing the way for the execution and registration of the PR by the DMRE. PR10839, covering
446 hectares, is adjacent to Qala Shallows. Its next steps include pursuing Environmental Authorisation, engaging
stakeholders, and submitting a Basic Assessment Report.
The approval of these PRs would significantly increase the WBP’s MRE, reinforcing the size and overall potential of the project.
Furthermore, significant near-mine opportunities remain for extending prospecting areas.
10
West Wits Mining Limited
Review of Operations
30 June 2024
Image 7 showcases the coverage of the PR areas.
IMAGE 7: WEST WITS’ DMRE ACCEPTED PROSPECTING RIGHTS
Bird Reef Uranium Exploration and Phased Drilling Program
West Wits' uranium exploration is centred around the Bird Reef Package within its Mining Right area, presenting the potential
for a standalone uranium and gold project. The project is well positioned to benefit from the resurgence in uranium prices and
a growing emphasis on uranium’s role in the decarbonised energy mix. The Company’s Uranium Exploration Target issued
under the JORC requirements is summarised in Table 33.
TABLE 3: URANIUM EXPLORATION TARGET3
URANIUM EXPLORATION TARGET
Range
Low
High
Tonnes (M)
10
22
Grade (ppm) U3O8
300
550
Content (Mlb) U3O8
12
16
Note: The consolidated Exploration Target is stated above as ranges of potential tonnes and grades. Number variances may
occur due to rounding errors. The potential quantity and grade are conceptual in nature, there has been insufficient
exploration and evaluation of historical information to estimate a Mineral Resource. It is uncertain if further exploration will
result in the estimation of a Mineral Resource.
The results of a phased Uranium Drilling Program conducted by the MSA Group were announced in October 2022 4. This
program’s primary goal is to convert the declared JORC Uranium Exploration Target into an Inferred Mineral Resource.
The Company was encouraged by the grades and widths observed in the Phase 1 intercept results, validating the presence
of consistent uranium mineralisation along a stretch of approximately 3.3km’s within the Bird Reef Central area of the WBP.
11
West Wits Mining Limited
Review of Operations
30 June 2024
Key assay results are highlighted as follows4:
• 1.59m @ 835ppm U and 1.46g/t Au from 85.11m (PH1B – Middle Reef), including
▪ 0.96m @ 1,321ppm U and 2.30g/t Au from 85.74m
• 1.20m @ 108ppm U and 5.45g/t Au from 104.61m (PH1B – White Reef), including
▪ 0.49m @ 226ppm U and 12.15g/t Au from 105.32m
• 1.26m @ 221ppm U and 0.38g/t Au from 77m (PH1C – Middle Reef), including
▪ 0.5m @ 456pm U and 0.80g/t Au from 77.76m
Table 4 summarises the phases of the drilling program.
TABLE 4: BIRD REEF URANIUM DRILLING PROGRAM
Uranium Exploration
PHASED URANIUM DRILLING PROGRAM
Drill Holes
Planned Meters
Phase 1 - Complete
3
291.3m
Phase 2
10
2,640m
Phase 3
2
1,600m
TOTAL
15
4,600M
The development of Qala Shallows is currently a priority, but the Company continues to explore opportunities to further
advance this promising project within the existing Mining Right area.
AUSTRALIA
Mt Cecelia, Paterson Province (100%)
The Mt Cecelia Project (tenement E45/5045) is located on the border of the East Pilbara and Paterson Provinces of Western
Australia, approximately 270 km ESE of Port Hedland and 200 km ENE of Marble Bar, and covers 225km 2 of highly prospective
ground, strategically located adjacent to tenements held by Rio Tinto Ltd (ASX:RIO).
Mt Cecelia is situated in close proximity to several major exploration tenements, including the Telfer Mine, which is 150 km
NW, and the Nifty Mine, 120 km NNW. The project's location within the Paterson and Pilbara regions places it near some of
the most significant recent mineral discoveries in Australia, such as Greatland Gold/Newmont’s Havieron (92 Mt @ 1.9 g/t Au
& 0.24% Cu), Rio Tinto’s Winu (608 Mt @ 0.41% Cu & 0.3 g/t Au), and De Grey’s 9 Moz Hemi gold discovery (229.8 Mt @
1.22 g/t Au).
Mt Cecelia’s Exploration Licence has been renewed for another five years, expiring 27 May 2029. This renewal reflects the
promising gold intercepts discovered during the maiden drilling campaign and the recognised base metal potential within the
tenement area and the wider East Pilbara and Paterson Province regions.
Mt Cecelia achieved a significant milestone in December 2022 with the completion of its inaugural drilling program targeting
the primary electromagnetic anomaly, SGC_1. This initial exploration effort comprised four drill holes, extending to a
cumulative depth of 1,036 meters. Notably, the assay results 5 have shown substantial intervals of gold mineralisation,
particularly in drillholes WEWI0001 and WEWI0004, signalling the project's potential for high-value gold discovery.
WEWI0001 contains 20m @ 0.93 g/t Au within a broader mineralised interval of 56m @ 0.55g/t Au. WEWI0004 contains 24m
@ 0.95 g/t Au within a broader mineralised interval of 82m @ 0.51g/t Au.
West Wits is in ongoing discussions with Farm-In partner, Rio Tinto Exploration Pty Limited, regarding strategic advancements
for the project.
12
West Wits Mining Limited
Review of Operations
30 June 2024
Image 8 shows the position of the project tenement on the border of the East Pilbara and Paterson Provinces.
IMAGE 8: MT CECELIA PROJECT LOCATION
ENVIRONMENTAL, SOCIAL AND GOVERNANCE
Environmental Stewardship & Biodiversity Conservation
West Wits is committed to strong environmental stewardship and biodiversity conservation. The Company’s operations are
substantially underground, resulting in low noise and dust levels. This approach, coupled with a small footprint and surface
infrastructure, ensures a low rehabilitation liability and minimal impact on the surrounding environment. Additionally, West
Wits employs an efficient water use model that minimises water usage and ensures zero effluent discharge into local
tributaries.
Social Positive Impact on Host Communities
13
West Wits Mining Limited
Review of Operations
30 June 2024
West Wits is dedicated to making a positive social impact in the communities it operates. Through its Local Economic
Development Programme, the Company collaborates with the City of Johannesburg to run a community wards forum, ensuring
active engagement and benefits for local residents. Prioritising local procurement, West Wits sources from a growing Black
Economic Empowerment database and supports the community through its Social & Labour Plan, which includes a Beneficiary
Learnership Programme aimed at enhancing skills and opportunities for local individuals. In the reporting period two
beneficiaries of the program were Malaika Mosotho Ramanyimi, a B Tech Mining Engineering student currently in her final
year at the University of Johannesburg, and Takudzwa Chikonye, who graduated in Actuarial Science in 2023 from the
University of Witwatersrand.
Committed to addressing the social and environmental challenges in the Witwatersrand Basin, especially those posed by
illegal mining activities, West Wits has increased community engagement efforts. The Company works with local groups and
authorities to provide employment opportunities and improve safety conditions. West Wits believes that its initiatives can
positively impact both social and environmental management in the project area.
The Company maintains a continuous partnership with the DMRE, the South African Police Service and the Johannesburg
Metro Police Department to combat illegal mining activities within its designated Mining Right area. In acknowledgment of the
Company’s collaborative efforts, West Wits was honoured to receive a Certificate of Appreciation from the South African Police
Service Florida for “Partnership in Policing”. This recognition reinforces the shared commitment to working hand in hand
towards building a safer and stronger community around the WBP.
Governance Responsible Production Practices
West Wits adheres to responsible production practices under a robust corporate governance framework that complies with
evolving legal and regulatory requirements. The Company’s commitment to Health and Safety is demonstrated through strict
conformance to South Africa’s Mine Health & Safety Act 29 of 1996 and a zero-harm approach to all operations. The Company
maintains transparent stakeholder engagement and reporting, ensuring accountability and trust with all stakeholders.
During the reporting period, West Wits announced its formal admission to the Minerals Council South Africa. By becoming a
member of the Minerals Council, West Wits demonstrates its commitment to the Membership Compact. This code of ethical
business conduct obliges the Company to adhere to the highest standards of integrity and corporate governance, ensuring
responsible operational practices. West Wits’ objectives are aligned with those of the Minerals Council, notably the ambition
to double real investment in South Africa’s mining sector by the year 2030. Such an endeavour is crucial for stimulating growth,
generating employment, and advancing sustainability within the industry.
CORPORATE
Industry Engagement
The West Wits team has been highly active in engaging with various stakeholders to demonstrate Qala Shallow’ readiness
and to network with investment brokers, fund managers, retail investors, and the media. Through a series of conferences, site
visits, and webinars, the team has strengthened connections with key players in the mining industry, ensuring that the project
remains at the forefront of investor interest and stakeholder engagement.
Ms. Tozama Kulati Siwisa, WWI MLI Executive Director and West Wits’ Head of Corporate Affairs, is a prominent figure in the
mining industry, actively representing both West Wits and Women in Mining. She has been instrumental in promoting
sustainable mining practices and engaging with industry leaders globally. Throughout the reporting period, Ms. Kulati Siwisa
was invited as an honorary guest and speaker to attend several key industry conferences, including The Dubai Mining Show
and the International Conference on Safe and Sustainable Mining Technologies, Mining & Engineering Expo & Conference in
India.
14
West Wits Mining Limited
Review of Operations
30 June 2024
Image 9 shows Ms Kulati Siwisa & Mr Deysel with Mr Gwede Mantashe, South Africa’s Minister of Mineral Resources and
Energy at the Africa Down Under (ADU) conference in Perth, Western Australia.
IMAGE 9: ADU Conference with Mr Mantashe, SA Minister of Mineral Resources & Energy
In February 2024, several members of the West Wits Board and Senior Management attended the Mining Indaba Conference
in South Africa. In May 2024, the team also attended the RIU Sydney Resources Round-up. Image 10 shows CFO Simon
Whyte, Chairman Michael Quinert and COO Rudi Deysel at the West Wits booth.
IMAGE 10: WEST WITS BOOTH AT SYDNEY RESOURCES ROUND-UP 2024
DEREWO PROJECT, PANIAI REGENCY (WWI: 64%), INDONESIA
No substantive activities have occurred. The Company is currently seeking interested parties to divest the Derewo Project.
15
West Wits Mining Limited
Review of Operations
30 June 2024
1.
2.
3.
4.
5.
The original report was “Updates to DFS Provide Improved Results for WBP” which was issued with consent of Competent
Persons Mr. Andrew Pooley. The report was released to the ASX on 26 July 2023 and can be found on the Company’s
website (https://westwitsmining.com/). The Company is not aware of any new information or data that materially effects
the information included in the relevant market announcement and, in the case of Mineral Resources or Ore Reserves,
that all material assumptions and technical parameters underpinning the estimates in the relevant market announcem