Annual Report to shareholders
Released
Released
Announcement PDF
ANNUAL REPORT
For the year ended 30 June 2023
West Wits Mining Limited
ABN 89 124 894 060
West Wits Mining Limited
Contents
30 June 2023
Corporate directory
Chairman's Letter
Review of Operations
ORE Reserve and MRE Statement
Directors' report
Auditor's independence declaration
Statement of profit or loss and other comprehensive income
Statement of financial position
Statement of changes in equity
Statement of cash flows
Notes to the financial statements
Directors' declaration
Independent auditor's report to the members of West Wits Mining Limited
Shareholder information
1
2
3
4
19
22
36
37
38
39
40
41
68
69
73
West Wits Mining Limited
Corporate directory
30 June 2023
Directors
Mr Michael Quinert, Non-Executive Chairman
Mr Jac van Heerden, Non-Executive Director
Mr Hulme Scholes, Non-Executive Director
Mr Peter O’Malley, Non-Executive Director
Mr Warwick Grigor, Non-Executive Director
Joint Company Secretaries
Mr Simon Whyte
Mr Paul Godfrey
Registered office and
Principal place of business
Level 6, 400 Collins Street
Melbourne VIC 3000
Australia
Share register
Automic Pty Ltd
Level 5 126 Phillip Street
Sydney NSW 2000
+61 2 9698 5414
Auditor
William Buck
Level 20, 181 William Street
Melbourne VIC 3000
Solicitors
QR Lawyers
Level 6, 400 Collins Street
Melbourne VIC 3000
Bankers
National Australia Bank
Level 2, 330 Collins Street
Melbourne VIC 3000
Stock exchange listing
West Wits Mining Limited shares are listed on the Australian Securities Exchange
(ASX code: WWI) and in the USA on OTCQB (code: “WMWWF”)
Website
https://westwitsmining.com/
2
West Wits Mining Limited
Chairman's Letter
30 June 2023
Chairman’s Letter
Dear Shareholders,
On behalf of the Board of Directors, it’s my pleasure to present West Wits’ (“ASX: WWI”; “OTCQB: WMWWF”) Annual
Report for the fiscal year ending 30 June 2023.
In the current equity market climate, securing financing has been a gradual process, but we are making steady headway. I
am pleased to report we are in active discussions with various capital providers, both in terms of debt and equity, each
considering investments ranging from US$10-20 million. Our strategy involves tapping into a variety of funding sources over
a span of several years. Initially, we plan to secure approximately US$10-15 million to continue developing our underground
operations at Qala Shallows.
Operationally, once we've accumulated a meaningful stockpile, we will start delivering ore to Sibanye-Stillwater’s Ezulwini
plant, bringing in revenue. The heads of agreement signed with Sibanye was a significant milestone that demonstrated the
ready to mine status of our project. Strategically we will reinvest this cash flow into ongoing development of our project and
supplement it with further financing as needed. Our goal is to achieve steady-state production approximately three years from
commencement of operations, ensuring we have the necessary funds for the commissioning and ramp-up phases.
In terms of project economics, our recent efforts in the updated DFS for Qala Shallows yielded positive results. We've seen a
38% increase in recoverable gold to 924,000 ounces, a 27% boost in steady-state production to 70,000 ounces per annum
over nine years, and a material decrease in steady-state All-in-Sustaining Costs to US$871 per ounce. These figures
underscore our commitment to sound financial management.
To our shareholders, I want to emphasise and reinforce our focus on generating cash and delivering strong returns. During
the year we have seen a substantial increase in the projected post-tax NPV, amounting to almost A$400 million (a 104%
increase). This positions us to generate a total of approx. A$800 million free cash flow, which demonstrates the value and
potential of the Witwatersrand Basin Project. Regarding the discrepancy between our market capitalisation and NPV, it's worth
noting that our post-tax NPV, after considering accumulated tax losses and our share of the project entity, is still around 8
times our current market capitalisation. The pre-tax NPV is now an impressive A$570 million (US$367M).
Following the release of the updated DFS, the Industrial Development Corporation of South Africa provided the company with
a pathway to secure loan facilities of US$15.9 million subject to certain criteria being met. Subsequently our shares
experienced a notable surge, registering a 16.67% increase to reach 2.1 cents per share at the time. This significant boost in
market capitalisation underscores the strong investor confidence in our Company's potential and the promising trajectory of
our projects.
I am also pleased that our Qala Shallows asset has a secured vital mains water access, and we've also negotiated an
advanced mains power supply agreement with City Power. These achievements will further enhance our project's viability and
cost-effectiveness.
I would like to take this opportunity to extend our heartfelt gratitude to Jac van Heerden for his invaluable contributions as
Managing Director and CEO during this year. In July 2023, Jac transitioned to the role of non-executive director within our
Company. Following Jac's transition, Rudi Deysel took on the role of Chief Operating Officer and Country Manager (RSA).
Rudi has worked closely with Jac over the past two and a half years, playing a pivotal role in bringing our project to execution
status. I am extremely pleased with the technical capability and operational experience that the team based in Johannesburg
bring to the Company and would like to thank them for their management and leadership of our projects.
In conclusion, on behalf of the Company and the Board of Directors, I extend our heartfelt gratitude to all shareholders for
their unwavering loyalty and steadfast support throughout FY23. West Wits has been undervalued in the market. While South
Africa may face some challenges, it remains a politically stable and advanced nation in Africa. Our Witwatersrand Basin
Project is strategically located, and once established, it has the potential to be a multi-decade operation. The Qala Shallows
development represents only a fraction of our global 4.27Moz Gold Mineral Resource Estimate. We encourage shareholders
to consider the fundamentals when evaluating our Company's future.
Sincerely,
Michael Quinert
Chairman, West Wits Mining
3
West Wits Mining Limited
Review of Operations
30 June 2023
REVIEW OF OPERATIONS
HIGHLIGHTS
Witwatersrand Basin Project (“WBP”), South Africa
QALA SHALLOWS MINE
Operational Readiness
➢ Secured cost-effective toll treat agreement with Sibanye-Stillwater Ltd
➢ Established water supply infrastructure
➢ Received 7.5MVA power allocation with primary power substation completed
➢ Expression of Interest received from Industrial Development Corporation (“IDC”) to provide debt facility of
ZAR300 million (approx. A$24.5 million)
Significant Updated Definitive Feasibility Study (“DFS”)2
➢ Gold Production: 924,000oz over 17.7-year Life-of-Mine
➢ Steady-State Production: ~70,000oz pa for 9 years
➢ Steady State All-In-Sustaining-Cost: US$ 871/oz
➢ Project Financials: Free Cashflow - US$522M; Pre-tax NPV7.5 - US$367M; Post-tax NPV7.5 - US$255M
➢ Peak Funding: US$54M with payback period of 4.1-years from construction
➢ Current Ore Reserve: 4.03 million tonnes at 2.71g/t for 351,400 oz Gold
URANIUM EXPLORATION
➢ Positive follow up Uranium Drilling Program 3 diamond-hole assay results underscore the Bird Reef Central
area’s potential to be a uranium / gold project, noting Note this area hosts a JORC Exploration Target of 1216 million pounds U3O8 at 300 to 550 ppm4
➢ Assay results highlighted by5:
•
•
•
1.59m @ 835ppm U and 1.46g/t Au from 85.11m (PH1B – Middle Reef), including
0.96m @ 1,321ppm U and 2.30g/t Au from 85.74m
1.20m @ 108ppm U and 5.45g/t Au from 104.61m (PH1B – White Reef), including
0.49m @ 226ppm U and 12.15g/t Au from 105.32m
1.26m @ 221ppm U and 0.38g/t Au from 77m (PH1C – Middle Reef), including
0.5m @ 456pm U and 0.80g/t Au from 77.76m
Mt Cecelia Project, Western Australia
➢ Completed Maiden Drilling Program assay results confirm significant intervals of gold mineralisation Assay
results for two drill-holes7:
•
Drill-hole WEWI0001 56m @ 0.55g/t Au from 194m, including
20m @ 0.93g/t Au from 194m
•
Drill-hole WEWI0004 82m @ 0.51g/t Au from 128m, including
24m @ 0.95g/t Au from 150m
4
West Wits Mining Limited
Review of Operations
30 June 2023
SOUTH AFRICA
Witwatersrand Basin Project (“WBP”); Central Rand (WWI: 66.6%), Gauteng Province
Situated within the renowned gold-rich landscape of the Central Rand Goldfield in South Africa, the WBP has consistently
demonstrated its immense potential. With a substantial gold resource of 4.28 million ounces, grading at 4.58 grams per
tonne (g/t) of gold1, it provides a platform for West Wits’ to transform into a mid-tier gold producer.
The WBP comprises three distinct reef mining targets, each slated for sequential development: the Kimberley Reef, Main
Reef, and Bird Reef. In September 2021, West Wits successfully concluded a comprehensive DFS and issued its inaugural
Ore Reserve Statement for the Qala Shallows Project, situated on the Kimberley Reef. This constitutes stage 1 of the WBP.
This initial study underwent a subsequent update in August 2022, followed by a further update and a Ore Reserve increase
in June 20232. These updates were prompted by various developments and the acquisition of new information, including the
installation of essential infrastructure, underground survey data, confirmation of contractual terms with external partners, and
took into account adjustments reflecting market-based cost escalations.
QALA SHALLOWS OPERATIONAL READINESS
Qala Shallows' readiness for operation is demonstrated by:
•
Strategic Tolling Agreement: Successfully secured a cost-effective toll treatment agreement with SibanyeStillwater Ltd.
•
Key Infrastructure Completion: Substations and water infrastructure are fully operational
•
Debt Facility: Expression of formal interest from South African Industrial Development Corporation (“IDC”) in
providing loan funds
•
Efficient Infrastructure: Surface and initial underground infrastructure designed and constructed for quick
accessibility and rapid production
•
Decline Refurbished: Successful completion of decline and box cut refurbishment
•
Access to the Reef: Establishment of on-reef underground access, approx. 3,000 tons of ore delivered to surface
during an Early Mining initiative and on-reef drive open to mine upon recommencement of operations
•
Minimal Environmental Impact: Small footprint resulting in minimal rehabilitation liability
•
Efficient Water Management: Granted a Water Use License with an efficient water use model
•
Productivity Enhancement: Production rate-based contract terms agreed to boost efficiency and productivity
•
Modern Equipment: Adjudication of a new fleet of advanced underground mining equipment
•
Regulatory Compliance: Possess approved and fully compliant operational permits
IMAGE 1: QALA SHALLOWS PROJECT PROGRESS
5
West Wits Mining Limited
Review of Operations
30 June 2023
Secured Toll Processing Agreement
In October 2022, West Wits successfully secured a cost-effective toll treating agreement with major mining house, SibanyeStillwater Ltd, for the processing of ore extracted from Qala Shallows. This strategic partnership, facilitated through SibanyeStillwater's wholly owned subsidiary, Ezulwini Mining Company (Pty) Ltd (“Ezulwini”), establishes a mutually advantageous
initiative.
Under the Agreement, West Wits will initially supply Ezulwini with approximately 15,000 tonnes of gold-bearing material per
month, with the plan to make incremental increases over time to eventually reach up to 65,000 tonnes per month. This
agreement not only boosts operational efficiencies but also maximises the utilisation of available capacity at Ezulwini. Situated
within a 25 kilometres radius from Qala Shallows, Ezulwini is easily accessible via a primary highway, further enhancing
logistical convenience.
Advances in Water and Power Infrastructure
Dedicated to its mission of establishing an economically efficient gold mine that revitalises the region and creates significant
value for shareholders, West Wits prioritises cost-effective infrastructure solutions and strong relationships with local
communities.
A significant milestone in this journey is the strategic collaboration between the Company and Calgro M3 Developments, a
Property Development firm listed on the Johannesburg Stock Exchange. This partnership includes the successful completion
of a crucial potable water supply pipeline near Qala Shallows. Beyond ensuring water provisions for Calgro M3's communityoriented developments, this alliance also guarantees a reliable potable water supply for the project itself. Additionally, West
Wits has secured a water supply agreement with Johannesburg Water, further fortifying water resources for the venture.
Significant progress has also been made in ensuring a reliable power supply for Qala Shallows. In April 2023, West Wits
announced the approval granted by South Africa's Joburg City Power for a substantial 7.5MVA power supply. This dedicated
power supply is strategically allocated to the Fleurhof 88/11kV primary substation, conveniently located within a kilometre of
Qala Shallows. Image 2 provides a view of the newly completed Fleurhof substation, a critical component in West Wits’
mission to secure a consistent, cost effective and robust source of electricity for the project.
IMAGE 2: FLEURHOF SUBSTATION
Recent media attention has focused on South Africa's national power supply challenges. However, for context, it's crucial to
note that over the past three years, the country has maintained sufficient power generation at a significantly lower cost
compared to diesel generators commonly used in remote mining areas. Early access to grid power translates into substantial
cost savings as reliance on diesel generators diminishes during the initial development phase and then be utilsed for backup
power generation.
6
West Wits Mining Limited
Review of Operations
30 June 2023
Moreover, West Wits is keenly observing the remarkable progress in renewable energy, particularly solar power infrastructure
and battery-operated mining equipment, given South Africa's ideal climate for maximising solar energy utilisation. Additionally,
the Company's preferred equipment supplier has made significant advancements in battery-powered mining equipment,
promising to substantially reduce reliance on diesel power.
West Wits envisions over the longer term an optimal power supply mix for the WBP, seamlessly blending electrical grid, solar,
and diesel power to ensure uninterrupted production.
Funding – IDC Expression of Interest
The IDC formally expressed its written interest to provide debt funding amounting to ZAR300 million, approximately equivalent
to US$15.9 million, as part of a proposed ZAR600 million debt funding package to support the development capital required
for Qala Shallows. This endorsement from the IDC, a prominent development finance institution dedicated to fostering
economic growth and industrial development in South Africa, underscores the remarkable potential of West Wits' project. The
proposed funding terms align with standard conditions for loan facilities of this nature, serving as a testament to the IDC's
confidence in the WBP.
Upon securing the debt funding package, successfully completing the necessary due diligence and receiving final approval of
terms and conditions by the IDC’s Executive Credit Committee, the initial funds would be strategically allocated towards
mobilising the mining contractor and procuring essential equipment, facilitating the commencement of operations. This
proactive step will enable the Company to establish a robust 30,000-tonne ore stockpile, ensuring a consistent monthly
delivery of 15,000 tonnes per month to Ezulwini, in accordance with the tolling agreement.
Within a span of six to eight months, this production will commence to generate revenues from gold production, laying a strong
foundation for the future of the project.
QALA SHALLOWS UPDATED DEFINITIVE FEASIBILITY STUDY
West Wits commissioned independent mining engineers Bara Consulting (“Bara”), to undertake a comprehensive review and
update of the Qala Shallows DFS released in August 2022 and reported on in the Annual Report for the year ended 30 June
2022. The updated DFS further enhances its already promising outlook and amplifies Qala Shallows’ already optimistic
prospects. The DFS was further updated post the end of the 30 June 2023 financial year.
Qala Shallows Improved Production Schedule
Image 3 outlines Qala Shallows’ production profile to an execution level of accuracy for a 24-month budgetary period. The
remaining Life-of-Mine (“LOM”) is at a DFS level of accuracy, and there is an improved confidence on costs regarding some
capital and operating expenditure, most notably the mining and equipment costs.
900
800
700
600
500
400
300
200
100
-
80,000
70,000
60,000
50,000
40,000
30,000
20,000
10,000
-
1
2
3
4
5
6
7
8
9
10 11 12 13 14 15 16 17 18
Project Year
Ore Tonnes
Waste Tonnes
7
Recovered Content
RECOVERED GOLD [OZ]
ORE/WASTE TONNES [KT]
IMAGE 3: QALA SHALLOWS PRODUCTION PROFILE SHOWING THE WASTE AND ORE MINING OVERLAID WITH
THE RECOVERED GOLD OUNCE PROFILE OVER LOM 2
West Wits Mining Limited
Review of Operations
30 June 2023
The updated production profile indicates waste and ore tonnes, as well as recovered gold content in ounces. Qala Shallows
now has a steady-state gold production of approximately 70,000 oz per annum for 9 years2.
Qala Shallows Updated Mine Schedules
The DFS models two mine schedules updated in terms of JORC 2012 requirements:
1. Base Case – LOM plan which targets total Mineral Resources (Measured, Indicated and Inferred Mineral
Resources)
2. Ore Reserve – LOM Plan which targets Measured and Indicated Mineral Resources only
Qala Shallows Improved Production Data
Table 1 shows the highlights of the production data from the updated LOM plan in comparison to the earlier version. There is
an increase from the 2022 DFS plan regarding total ROM tonnage, as well as the maximum production rates and gold
produced.
TABLE 1: BASE CASE - KEY PRODUCTION METRICS FOR QALA SHALLOWS
AUG-223
JUL-232
QALA SHALLOWS – PRODUCTION DATA*
Life-of-Mine (Construction to Relinquishment)
15.7 years
17.7 years
Total Production (Run of Mine Tonnes)
7.6 million t
10.2 million t
Max Production Rate (Tonnes)
699,000 pa
839,000 pa
2.98 g/t Au
3.04 g/t Au
726,400 oz
1,005,000 oz
92%
92%
Gold Produced
688,000 oz
924,000 oz
Average Annual Gold Production
43,000 oz
51,000 oz
Average Annual Steady State Gold Production (9yrs)
55,000 oz
70,000 oz
Max Gold Production (Year 6)
*
Includes Inferred Resources
60,000 oz
75,000 oz
Run-of-Mine Grade Au (Average)
1
LOM Contained Au
Metallurgical Recovery Au (Overall)
The improved production data includes:
•
New survey and sampling data obtained from underground access, enabling an update of the dip of the ore body
based on actual measurements
•
Confirmation of mining blocks available for mining in the old mine area
•
Inclusion of additional Mineral Resources not previously accounted for in the LOM
•
Increase of ore production rate to approx. 65,000tpm (2022: 55,000tpm)
•
Application of a 5% ore loss through the ore flow process
Qala Shallows Enhanced Financial Outcome
Updated capital and operating cost estimates, along with the updated LOM plan, were used in the updated DFS financial
evaluation. Gold price and Foreign Exchange (USD / ZAR) assumptions have been updated to more closely represent the
current market trends. The Base Case financial evaluation improved when compared to the 2022 DFS, which is largely driven
by increase in production volume and production rate, plus favourable movements in the Gold Price and USD / ZAR rate.
Table 2 shows the financial evaluation of Qala Shallows, comparing the August 2022 DFS to the updated July 2023’s figures.
8
West Wits Mining Limited
Review of Operations
30 June 2023
TABLE 2: BASE CASE - FINANCIAL EVALUATION OUTCOME
QALA SHALLOWS – FINANCIAL EVALUATION
AUG-223
JUL-232
$ 1 170 million
$ 1 709 million
Total Revenue (USD)
Total Free Cashflow (USD)
$ 268 million
$ 552 million
Peak Funding (USD)
$ 63 million
$ 54 million
LOM C1 Cost (USD/oz)
$ 917 / oz
$ 818 / oz
LOM All in sustaining Cost (USD/oz)
$ 1 093/oz
$ 977/oz
Steady-State All in Sustaining Cost (USD/oz)
$ 962 /oz
$ 871 /oz
Payback (years)
5.0 years
4.1 years
Pre-Tax Net Present Value 7.5 (USD)
$ 180m
$ 367m
Post-Tax Net Present Value 7.5 (USD)
$ 125m
$ 255m
Pre-Tax Internal Rate of Return (%)
38%
61%
Post-Tax Internal Rate of Return (%)
32%
53%
*
Including Inferred Resources
The main highlights are:
•
AISC – 10.6% decrease to US$977/oz with steady state AISC falling to US$871/oz
•
Post Tax NPV7.5 - 104% increase in Post Tax NPV7.5 to US$255M
•
Post-Tax IRR – 63.5% increase to 53%
The waterfall chart presented in Image 4 clearly shows that the most significant improvement to the financial evaluation is
attributed to revenue obtained by 38% increase in Gold Produced and 5.7% increase in Gold Price. Operating Costs increased
due to the higher production volumes and the ZAR unit cost increased approx. 6% from higher Processing and Transport
rates. This was offset in USD terms by the devaluation of the ZAR.
IMAGE 4: BASE CASE - WATERFALL CHART FOR NPV7.5 (ZAR'million)
9
West Wits Mining Limited
Review of Operations
30 June 2023
Qala Shallows Sensitivity Analysis
The sensitivity analysis in Table 3 shows that even at a low gold price of US$1,500/oz, the project still has strong financial
outcomes which makes this a highly robust project.
Gold
Price
TABLE 3: BASE CASE - SENSITIVITY TO GOLD PRICE2
Pre-Tax
Post-Tax
Post-Tax
Operating
Peak Funding
Project
Project
Project
Margin
Requirement
NPV7.5
NPV7.5
IRR
Payback
Period
USD/oz
USD'm
USD'm
%
%
USD'm
years
1 500
219
144
34
46
68
4.9
1 750
321
223
47
53
58
4.3
1 850
367
255
53
56
54
4.1
2 000
2 200
437
531
302
366
61
72
59
63
49
43
3.8
3.6
Recent devaluation of the South African Rand compared to the United States Dollar presents further project potential as
demonstrated in Table 4, which outlines the sensitivity to exchange rate. This is largely driven by the additional revenue
realised by the project at higher ZAR/USD exchange rates, as most project costs remain in South African Rand terms.
TABLE 4: BASE CASE- SENSITIVITY TO EXCHANGE RATE 2
Exchange
Rate
Pre-Tax
NPV7.5
Post-Tax
NPV7.5
Post-Tax
IRR
Operating
Margin
Peak Funding
Requirement
Payback
Period
ZAR/USD
USD'm
USD'm
%
%
USD'm
years
15.00
16.50
17.50
18.50
20.00
287
338
367
394
429
200
235
255
273
296
39
47
53
59
67
48
53
56
58
61
75
61
54
47
40
4.7
4.3
4.1
3.9
3.7
The main highlights are:
•
•
•
•
Gold Price: US$1,850/oz (2022: US$1,750/oz)
Exchange Rate: ZAR 17.5 to US$ 1 (2022: ZAR 15.0 to US$ 1)
Toll Treating rate based on executed agreement
New contractor rates based on firm quotes
Ore Reserve
A LOM plan and budget have been generated by the mine plan update and inclusion of actual costs in the updated financial
evaluation. The outcome of this exercise is positive and an improvement to the 2022 DFS with a 61,400oz (21%) increase in
Ore Reserve to 351,424oz2.
The work undertaken was based on DFS level work, as well as actual on-site activities linked to the Early Works Program. It
is therefore considered that the Ore Reserve can be updated based on the updated mine plan. Table 5 outlines the updated
Mineral Ore Reserve.
TABLE 5: ORE RESERVE STATEMENT FOR QALA SHALLOWS (JORC 2012)2
Grand Totals
Ore Reserve
Category
Tonnage
Grade
Content
Content
(Mt)
(g/t)
(kg)
(oz)
Proved
0.96
2.96
2 847
91 536
Probable
3.07
2.64
8 083
259 887
Total
4.03
2.71
10 930
351 424
10
West Wits Mining Limited
Review of Operations
30 June 2023
URANIUM EXPLORATION
In October 2021, the Company announced the restatement of its Uranium Exploration Target to JORC (2012) standard 4 and
the inclusion of uranium as a targeted mineral at the Bird Reef Sequence for an enhanced value-add to the WBP.
Table 6 provides an overview of the scale of the Uranium Exploration Target.
TABLE 6: URANIUM EXPLORATION TARGET4
Low
Range
High
Tonnes (M)
10
22
Grade (ppm) U3O8
300
550
Content (Mlb) U3O8
12
16
EXPLORATION TARGET: The potential quantity and grade are conceptual in nature. There has been insufficient exploration and
evaluation of historical information to estimate a Mineral Resource. It is uncertain if further exploration will result in the estimation of a
Mineral Resource.
Phased Drilling Program
In late July 2022, West Wits launched its follow up Uranium Drilling Program, carried out by the independent firm, the MSA
Group (“MSA”), with the primary goal of converting the declared JORC Uranium Exploration Target into an Inferred Mineral
Resource. In Phase 1 of this program, the Company conducted drilling operations comprising three boreholes, each reaching
an approximate depth of 120 meters, strategically targeting known mineralised zones. The results were announced in October
20225. This program built on the knowledge gained from previous drill campaigns undertaken by West Wits and wealth of
historical data we have access too.
Image 5 depicts the historical completed drillholes and the three Phase 1 Uranium Drilling Program drillholes completed.
IMAGE 5: PLAN VIEW OF THE BIRD REEF CENTRAL AND WEST EXPLORATION TARGET AREA, WITHIN THE WBP’S
MINING RIGHT BOUNDARY
Phase 2 of the follow up drill program will encompass exploration along the strike and down-dip directions within the confines
of West Wits’ Mining Right area, further advancing the Company’s pursuit of valuable uranium resources. West Wits also
remains keen to test mineralisation at greater depths in Phase 3. Table 7 outlines the Uranium Drilling Program’s phased
approach.
11
West Wits Mining Limited
Review of Operations
30 June 2023
TABLE 7: PHASED APPROACH OF URANIUM DRILLING PROGRAM
Uranium Exploration
PHASED URANIUM DRILLING PROGRAM
Drill Holes
Planned Meters
Phase 1 - Completed
3
291.3m
Phase 2
10
2,640m
Phase 3
2
1,600m
TOTAL
15
4,600M
Phase 1 Drilling Results
The Company was encouraged by the grades and widths observed in the Phase 1 intercept results, validating the presence
of consistent uranium mineralisation along a stretch of approximately 3.3 kilometres within the Bird Reef Central area of the
WBP. This extensive area encompasses the Monarch Reef, Middle Monarch Reef, and White Reef zones. Table 8 shows the
detailed results for each drillhole intersecting the Upper Monarch Reef, Middle Monarch Reef, and White Reef.
BHID
PH1A
PH1A
PH1A
PH1B
PH1B
PH1B
PH1B
PH1C
PH1C
PH1C
PH1C
PH1C
PH1C
TABLE 8: URANIUM DRILLING INTERCEPT RESULTS5
SIGNIFICANT COMPOSITE PER DRILLHOL
Intersections reported at cut-off > 100ppm U
Width
Strat Horison
From
To
(cm)
Au g/t
Monarch Reef
54.66
54.83
17
1.24
Middle Reef
62.20
62.55
35
0.22
White Reef
80.9
81.22
32
3.49
Monarch Reef
77.58
77.78
20
0.80
Middle Reef
85.11
85.44
33
0.36
Middle Reef
85.74
86.70
96
2.30
White Reef
104.61
105.81
120
5.45
Monarch Reef
64.93
65.93
100
0.23
Monarch Reef
66.75
67.11
36
0.04
Monarch Reef
69.29
69.77
48
0.37
Monarch Reef
70.91
71.14
23
1.14
Middle Reef
77.00
78.26
126
0.38
White Reef
94.16
95.97
181
0.83
The assay results are highlighted as follows:
•
1.59m @ 835ppm U and 1.46g/t Au from 85.11m (PH1B – Middle Reef), including
▪
•
1.20m @ 108ppm U and 5.45g/t Au from 104.61m (PH1B – White Reef), including
▪
•
0.96m @ 1,321ppm U and 2.30g/t Au from 85.74m
0.49m @ 226ppm U and 12.15g/t Au from 105.32m
1.26m @ 221ppm U and 0.38g/t Au from 77m (PH1C – Middle Reef), including
▪
0.5m @ 456pm U and 0.80g/t Au from 77.76m
12
U ppm
601
183
163
504
184
1 321
108
162
492
136
685
221
63
West Wits Mining Limited
Review of Operations
30 June 2023
AUSTRALIA
Mt Cecelia, Paterson Province (100%)
In Western Australia's Paterson Province, West Wits through its farm in with Rio Tinto successfully concluded the inaugural
drilling campaign at the Mt Cecelia Project in December 2022, yielding noteworthy gold intercepts9. Focusing on the
exploration of gold, nickel, and copper resources, exploration at Mt Cecelia is overseen by Rio Tinto Exploration (Pty) Ltd
(“RTX”) through a Farm-In/JV Agreement, enabling Rio Tinto Limited (ASX: RIO) under which RTX could potentially acquire
an 80% stake in the project through expenditure of $10 million. The Paterson Province region is renowned for hosting several
world-class mining ventures, including the Woodie Woodie manganese mine, Nifty copper operations, and the Telfer
gold/copper/silver mines.
Figure 1 presents the eight SGC target zones within the Mt Cecelia Project area. These targets represent Electro Magnetic
("EM") anomalies detected through airborne and, in certain instances, ground EM surveys conducted by West Wits.
FIGURE 1: MT CECELIA PROJECT TARGET ZONES6
13
West Wits Mining Limited
Review of Operations
30 June 2023
Completed Maiden Drilling Program At Primary Target Sgc_1
Mt Cecelia Project’s maiden drilling program, concluded in December 2022, resulted in four drill-holes of 1,036m at its primary
EM target: SGC_1. Figure 2 depicts the four drillholes over the modelled ground TEM anomaly.
FIGURE 2: FOUR DRILLHOLES AT TARGET SGC_1
Assay results7 confirmed significant intervals of gold mineralisation with drill-holes WEWI0001 and WEWI0004 ending in gold
mineralisation. WEWI0001 contains 20m @ 0.93 g/t Au within a broader mineralised interval of 56m @ 0.55g/t Au. WEWI0004
contains 24m @ 0.95 g/t Au within a broader mineralised interval of 82m @ 0.51g/t Au. Table 9 outlines the significant intervals
and key intercepts
Share your feedback
Discover