South African Update
Released
Released
Announcement PDF
ASX: WWI
ASX Announcement and Media Release
www.westwitsmining.com
Thursday, 25 February 2016
Fast Facts
Capital Structure:
Shares on issue
Options
Market Cap
Cash in Bank
Debt
Enterprise Value (EV)
EV/oz
@ 25 Feb 2016
456 million
52 million
A$9.1 million
A$1.3 million
Nil
A$7.8 million
A$6.40/oz
South African Update
Highlights
•
Company Directors & Management
Michael Quinert
Chairman
Vin Savage
Executive Director
Neil Pretorius
Non-Exec Director
Hulme Scholes
Non-Exec Director
Top Shareholders ≈
Twynam Ag
DRD Gold Ltd
Top 40 Shareholders
Company Highlights
• South Africa
o near surface and underground targets
o 1.217m oz JORC resource
Measures: 302,000
Indicated: 566,200
Inferred: 349,400
o Historic estimate of 12.8m oz at 4.6g/t
o 31.8m ozs Au produced historically
o
Three holes for 373m completed in late 2015
o
Program successfully tests near surface mineralisation on the Bird Reef at the
“Circular Shaft target” and confirms presence of “pay shoot” geometry
o
•
19.9%
11%
74%
Circular Shaft
All three holes intersected the Bird Reef target zone
Number 11 Shaft
o
14 hole program now completed with all core cut, sampled and sent for assay
West Wits Mining Limited (West Wits or the Company) is pleased to release the assay
results of the three drillholes which were completed to test a potentially large area of
unmined Bird Reef close to the major infrastructure development of the historical
“Circular Shaft”, a vertical Man and Machinery transport shaft. The Circular Shaft
Exploration Target, shown in table 1, is one of a number of surface or shallow
underground opportunities which the Company is investigating.
Table 1: Exploration Target for the Circular Shaft Project
• Indonesia
o High grade placer deposit
o Project show early stage similarities
with discoveries inc; Porgera, Edie
Creek, Wau
o Independent geologists believe source
of nuggets likely to be local, based on
the size and shape of the nuggets
discovered
Category
Tonnes (million)
Grade g/t
Ounces Au
Low Range
1.5
3.0
130,000
Upper Range
3.0
6.0
540,000
Table 1. The Exploration Target released to the ASX on 23 Nov 2015 is stated above as ranges of
approximations of tonnes and grades. The potential quantity and grade is conceptual in nature, there has
been insufficient exploration and evaluation of the historical information to estimate a Mineral Resource.
Competent Person Dr Andrew Tunks. The form and context in which the Competent Persons findings are
presented have not materially changed.
The Company is targeting a number of these near surface opportunities as part of its
strategy to expand its existing Soweto Cluster 1.2 Moz Au Mineral Resource Estimate
(above a target depth of 400m).
Table 2: Mineral Resource Estimate
Contact Details
West Wits Mining Limited
ACN 124 894 060
Suite 1, 1233 High Street
Armadale VIC 3143
T: +61 3 8692 9049
F: +61 3 8692 9040
E: info@westwitsmining.com
W: www.westwitsmining.com
Category
Tonnes Millions
Grade g/t
Ounces Au
Measured
2.22
4.25
302,300
Indicated
5.32
3.31
566,400
Measured & Indicated
7.53
3.59
868,700
Inferred
3.45
3.15
350,000
Total
1.09
3.45
1,218,700
-2Table 2. Mineral Resource estimate for the Soweto Cluster at a 2.0 g/t cut-off. Number differences may occur due to rounding errors. The
Company is not aware of any new information or data that materially affects the information included in the announcement and confirms that
all material assumptions and technical parameters underpinning the estimates above continue to apply and have not materially changed. The
form and context in which the Competent Persons findings are presented have not materially changed. Mineral Resource Estimate under the
JORC 2012 Code (WWI ASX release 22 Jan 2016 Competent Person Hermanus Swart)
Since the extension of the Prospecting right for the Soweto Cluster in April 2015 the Company has continued to
rigorously review the immense data bank developed over 100 years of mining on this lease. Records show that the
area covered by the current prospecting right produced circa 30 Mozs Au up until 2000 when the remaining historical
Mineral Resource Estimate stood at 12.8 Mozs (refer WWI ASX release 28 August 2015).
The Company was able to declare significant gold mineralisation above a 400m depth through the release of the
updated Mineral Resource (refer above). In addition West Wits has also identified exploration targets in areas outside
the existing Mineral Resource Estimate. The Company’s exploration efforts will focus on these areas with the objective
of further expanding its resource statement. The Company’s target areas, including the Circular Shaft project, all
provide opportunities for near-surface, high-grade gold mineralisation left unmined by previous explorers in part due
to the proximity to major historical mining infrastructure that is now no longer in place or required.
The drilling plan for Circular Shaft was to test for up plunge extensions of high grade pay shoots that were mined on
the same Bird Reef from the No 11 Shaft which is positioned nearby to the east of the target area but is separated by
a well-defined fault (Figure 1). This program has successfully tested near surface mineralisation on the Bird Reef at
the “Circular Shaft target” and confirmed the presence of “pay shoot” geometry. The assay results are provided in
Table 3.
Company Chairman Mr Michael Quinert said. “It is exciting to be back completing real exploration work on the Soweto
Cluster again. The updated Mineral Resource Estimation of over 1.2 million ounces released to the Market on the 22nd
of January 2016 has given the Company a strong impetus to get back on the ground and further develop these
targets”. The current program at Circular Shaft was the Company’s first drilling since 2008 and has highlighted the
opportunities for near-surface, high-grade gold mineralisation that was left unmined by previous explorers due to the
proximity of major infrastructure.
Mr Quinert continued “furthermore the drilling program completed in 2008 by the Company which focussed on
uranium exploration in the upper parts of the Bird Reef can be reused in light of this new information and cheaply
provide further data which will be used to develop a thorough understanding of this highly prospective zone”.
Recent drilling
Contouring of historic DRD surface drilling and underground sampling defined pay shoots based on a 2 g/t cut-off.
Three holes (BR121 to BR123), were positioned to test the pay shoot model in a low, medium and higher grade area
(Figure 1). In order to achieve a 200 m hole spacing, the holes were sited halfway between the historic DRD drilling.
-3-
Figure 1: Planned drilling to test pay shoot model. Long section view of modelled grades (prior to this drill program) for
the Bird reef.
Figure 2: A: Collar plan showing location of holes projected onto previous infrastructure during the mining period, also
shown in hatched purple is the outline of the Circular Shaft pay shoot on the Bird Reef. B section through boreholes
BR121 to BR123 displaying the various reefs and grade intersections. Note that the Bird reef comprises multiple minor
reefs which are named in the Lithology Legend.
-4The new data from the current program and incorporating all previous drilling (drilling results were not used for
Resource calculations by previous owner DRD) has confirmed the pay shoot model in the respective low, medium and
higher grade areas. See Figure 3.
Figure 3: Remodelled grades for the Bird Reef incorporating new data and drilling previously not considered.
.
Future work
This current work has given the Company the confidence to plan further exploration work in this area, importantly the
WWI 2008 holes were originally intended for uranium exploration which limited their depth to the uppermost parts of
the Bird reefs. A small program to re-enter and deepen nine of the 2008 exploration holes to intersect the White Reef
the lowermost and gold rich part of the Bird reef which was not tested in 2008 is now being considered. This would
require an additional 600 meters of drilling and could significantly add to the prospectivity of the Circular Shaft Project.
-5-
Figure 4: Distribution of historic, WWI 2008 and 2015 Bird Reef exploration drilling: Previous drill holes that stopped
short of the gold prospective zones and that could be re-entered are highlighted as Orange circles.
No 11 Shaft Project - update
The 14 hole drilling program on the Number 11 Shaft project is now complete and the holes have been cut, sampled
and sent off for assay. The market will be updated as results are returned. This target also comprises a significant
unmined portion of the Bird Reef that is centred around the redundant underground infrastructure known as the
Number 11 Shaft Project on the Rand Leases at the Eastern portion of the Soweto Cluster. The target is approx. 900m
in strike length and focusses on where the Bird Reef outcrops at surface. This target was left unmined as a crown pillar
due to significant surface infrastructure that was present at the time and to ensure the integrity of the shaft which was
operational. The number 11 Shaft was closed down in the fourth quarter of 1998 (DRD Annual Report 1999) and there
has been no further known production from the vicinity since that time.
Corporate
The Company has implemented a new arrangement for the provision of professional and administrative services in
connection with the conduct of its South African operation (“WWSA”). Following negotations initiated by West Wits
certain key service providers to WWSA have formed a joint venture company, Witpoortjie Resource Investments (Pty)
Ltd (“Witpoortjie”) for the sole purpose of providing ongoing services to the Company’s South African subsidiary, West
Wits SA (Pty) Ltd (WWSA).
-6Under these arrangements Witpoortjie will provide a range of services to support the development of the Soweto
Cluster asset in exchange for a 7.4% interest in the Soweto Cluster project via a 10% equity holding in WWSA. The
services provided by Witpoortjie are to include legal and strategic advice, consulting, supervisory and administrative
roles which collectively will provide for the conduct of our executive and legal functions in South Africa at no further
cash cost. Litigation costs are excluded from the arrangement and the provision of specific expert professional services
such as mining engineering and geology will continue to be provided by external consultants.
This arrangement will minimise the Groups cash expenditure on the Soweto Cluster project while also providing real
incentive to those who are critical of the development of those assets to achieve the best outcomes. West Wits is
pleased with this deal as it strikes the right balance between those objectives.
Next Steps
The Company will continue to evaluate and investigate the initial 17 targets identified through its review of the
immense amount of historical data. The Company will progressively begin to narrow its focus on a number of targets
but particularly unmined sections of the Bird Reef which sit outside the existing Mineral Resource Estimate as illustrated
through the initial programs at the Circular Shaft and Number 11 Shaft Projects.
The next drill program being considered will be to deepen the historical drill holes completed by the Company in 2008
to provide further information on the unmined section of Bird Reef, known as the Circular Shaft project with a view to
further identifying payshoots near surface.
For And On Behalf Of The Board
Michael Quinert
Chairman
West Wits Mining Limited
For further information visit www.westwitsmining.com
Or Contact
Tim Chapman
Telephone: +61 3 8692 9049
-7Competent Persons Statements
The information in this announcement that relates to Exploration Results and Mineral Resources is based on information compiled
by Hermanus Berhardus Swart, a Competent Person who is a Professional Natural Scientist registered with South African Council for
Natural Scientific Professions accredited (No. 400101/00) and a Member of the Geological Society of South Africa, each of which is
a “Recognised Professional Organisation” (RPO) that is included in a list that is posted on the ASX website from time to time.
Hermanus Berhardus Swart is employed by Dunrose Trading 186 (PTY) Ltd trading as Shango Solutions, which provides services as
geological consultants to the Company. Hermanus Berhardus Swart has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.
Hermanus Berhardus Swart consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
The peer review of the Geological data and Mineral Resource estimates was undertaken by Dr. Andrew Tunks and represents an
accurate representation of the available data. Dr. Tunks (Member Australian Institute Geoscientists) is a consultant to the Company
and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Dr Tunks consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.’
-8Table 3. Drilling Results
Hole
From
(m)
To (m)
0
21
34.25
32.06
32.56
35.59
35.96
33.5
32.06
64.06
62.26
BR121
71.22
70.41
65.02
71.95
71.95
88.97
91.43
92.27
89.72
92.27
88.78
92.27
87.51
87.91
88.78
70.58
94.92
91.1
89.87
70.97
95.46
112.82
113.48
114.95
115.98
114.1
52.46
95.06
BR123
65.02
72.05
89.72
BR122
35.96
114.39
66.85
97.46
102.3
104.23
106.43
106.71
104.46
111.98
115.34
104.64
112.33
116.23
Width
(cm)
Gold
Accumulation
(cmg/t)
Gold
Grade
(g/t)
Plant Fill
2100
139
0.07
Conglomerate
75
49
0.66
Rock Type
Conglomerate
Conglomerate
50
37
42
42
0.83
1.14
Includes internal
quartzite bands
390
197
Includes internal
quartzite bands
276
37
Includes internal
quartzite bands
154
103
Conglomerate
123
136
457
Includes internal
quartzite bands
108
465
Includes internal
quartzite bands
252
659
2.62
345
7270
2.11
40
57
1.45
Conglomerate
Conglomerate
Includes internal
quartzite bands
Conglomerate
Includes internal
quartzite bands
Conglomerate
Conglomerate
Conglomerate
Conglomerate
Conglomerate
96
73
83
66
54
66
29
Conglomerate
103
Gritty Quartzite
240
Conglomerate
18
Gritty Quartzite
Conglomerate
Conglomerate
Conglomerate
Conglomerate
18
0.51
0.19
0.13
1.24
Includes 18cm @ 4.11 g/t
(74cmg/t)
76
0.62
Includes 19cm @ 3.24 g/t
(62 cmg/t)
197
2.37
91
23
16
56
26
220
0.67
3.35
4.32
0.29
0.85
0.89
2.14
144
0.75
28
24
0.84
88
19
24
17
Includes 15cm @ 26.8 g/t
(402 cmg/t)
Includes 16cm @ 9.89 g/t
(158 cmg/t)
0.35
191
35
Remarks
1.06
0.7
0.2
Includes 35cm @ 4.24 g/t
(126 cmg/t)
No grades of any substance
No grades of any substance
Includes 68cm @ 1.40 g/t
(96 cmg/t)
-9JORC TABLE 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
Circular Shaft Drilling
o
Diamond drilling was utilised. The 47.6mm diameter core was split and half core
was submitted for assays. The samples included 2cm waste on the footwall and
hangingwall contacts of the reef. Minimum sample length was 10cm with a
maximum of 40cm.
Sampling
o
Suitable references and blanks were inserted after every 10th sample. The
laboratory also performed own internal validation by analysing duplicate samples
Techniques
and inserting standards as part of their accreditation,.
o
Primary preparation involved crushing of the entire samples. The samples were
split with a riffle splitter to obtain a sub-fraction, which was then pulverised in a
vibrating pulveriser. Fire assay of an approximately 40g portion of the sample was
utilised.
Drilling
o
reef locality and grade. A standard tube core barrel and diamond impregnated bit
Techniques
Drill Sample
Diamond drilling with a 47.6mm inside diameter (NQ), was conducted to ascertain
was utilised. Core was not oriented.
•
Recovery
A minimum of 95% core recovery was required, otherwise holes were redrilled.
Core was fitted and reconciled against drill meters provided by driller.
•
Core samples were geologically and geothechnically logged to a detail required for
appropriate Mineral Resource estimations, mining studies and metallurgical
Logging
studies.
•
Core logging was qualitative in nature. Each core tray was photographed and the
White Reef intersections scanned.
•
The total length (100%) of the relevant core intersections was logged.
•
Core samples were diamond cut and one half submitted for assays.
•
Core samples were sorted, dried and weighed. Primary preparation was by crushing
Sub-sampling
of the entire sample. The samples were split with a riffle splitter to obtain a sub-
Techniques
fraction, which was then pulverised in a vibrating pulveriser.
and Sample
•
Preparation
Suitable references and blanks were inserted after every 10th sample. The
laboratory also performed internal checks by analysing duplicate samples and
inserting their own standards as part of their accreditation.
Quality of
•
Sample sizes are appropriate to the grain size of the material being sampled.
•
Fire assay of an approximately 40g portion of the sample was utilised to allow
Assay Data
separation of gold in the sample. Gold content has been determined by Inductively
and
Coupled Plasma (ICP) Optical Emission Spectrometry. Uranium content was
- 10 Laboratory
determined by X-Ray Fluorescence (XRF) Spectrometry on glass beads cast using
Tests
12:22 flux of the sample with 10% lithium-nitrate.
•
No geophysical tools were used.
•
Suitable references and blanks were inserted after every 10th sample. The
laboratory also performed their own internal validation by analysing duplicate
samples and inserting their own standards as part of their accreditation.
•
and a second sample was taken to account for the nugget effect. If samples yielded
Verification
of Sampling
and Assaying
Location of
Data Points
The remaining half core was split (i.e. quarter of original 47.6 mm diameter core)
anomalous results, then the returned pulps were resubmitted as a new sample.
•
All the logging and sampling data was captured into a Microsoft Access database.
Statistics of sample precision were performed in graphical format.
•
The average of repeat and original samples was utilised.
•
Collar surveys were performed utilising a Garmin handheld GPS. Down-hole reflex
surveys were performed.
•
WGS1985 coordinates were converted to Cape LO27, a South African grid system.
•
Topographic control was achieved by surveying from official surface beacons and is
deemed accurate and adequate for the purpose.
•
Three boreholes were drilled down dip along a 800m strike distance of the reef
outcrop. The holes were positioned between previously drilled holes to achieve an
Data Spacing
and
average spacing of 200m between holes.
•
The data spacing and distribution is sufficient to establish the degree of geological
and grade continuity appropriate for a Mineral Resource estimation. The drill
Distribution
spacing should be sufficient for at least an Inferred Resource category.
•
Modelling will consider all individual samples before compositing of each sample
section to represent the total reef intersection.
Orientation
•
of Data in
Relation to
Structures have no known influence on the mineralisation of the Witwatersrand
placer type reefs, other than displacements.
•
Holes were drilled approximately perpendicular to the dip of the Witwatersrand
Geological
placer type reefs, which will prevent a bias as opposed to when drilling is
Structure
conducted semi parallel to the strata.
Sample
•
Competent Person after each completed borehole. Line of custody procedures
Security
Audits or
Reviews
Samples were delivered to laboratory sample receiving staff directly by the
were in place and have been applied.
•
The exploration process was reviewed by Dr. Andrew Tunks a Member of the
Australian Institute for Geoscientists.
- 11 Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Criteria
Circular Shaft Drilling
•
Tenure is held via a Prospecting Right GP 30/5/1/1/2/183 (10035) (“PR”) issued
pursuant to the Mineral and Petroleum Resources Development Act 28 of 2002
of the Republic of South Africa (“MPRDA”). The PR has been granted in respect of
the farms Roodepoort 237 IQ, Roodepoort 236 IQ, Doornkop 239 IQ,
Vogelstruisfontein 231 IQ, Vogelstruisfontein 233 IQ, Witpoortjie 245 IQ and
Vlakfontein 238 IQ in the Magisterial District of Roodepoort, South Africa. The PR
is held by Mintails SA Soweto Cluster (Pty) Ltd (“MSSC”) and is in the process of
being transferred to West Wits MLI (Pty) Ltd (“WWM”) under Section 11 of the
MPRDA which requires the submission of an application to the Minister of
Mineral Resources. The application has been prepared and is expected to be
Mineral
submitted in the near future. MSSC has agreed to effect the transfer of the PR
tenement and
and WWM has discharged its obligations under those arrangements. WWM’s
land tenure
share capital is held to 26% by a Black Economic Empowered (“BEE”) partner,
status
Dikgosi Gold (Pty) Ltd which is a requirement for transfer of the PR with the
remaining 74% held by a wholly owned subsidiary of West Wits Mining Limited.
The PR covers prospecting activities for gold, silver and uranium. The PR does not
include tailings dumps material in the area prospective for gold and uranium
which dumps are retained by the MSSC and/or its associated entities. On 10 April
2015 the Department of Mineral Resources for South Africa (“DMR”) upheld an
appeal against an earlier decision not to extend the PR and the PR was thereby
extended for a further period of 3 years from that date. The conduct of
prospecting activities on the PR is to be undertaken in accordance with a
prospecting works programme and an environmental management plan lodged
with the DMR in August 2015.
o
No other parties have performed exploration in the Circular Shaft area since 2008.
Exploration
The DRD Group performed exploration prior to 1996 in the same area but this does
done by other
not form part of the current exploration programme. If Mineral Resource
parties
estimation is to be performed over this area, an appraisal of the previous
exploration activities will have to be conducted.
o
The Circular Shaft deposit forms part of the Central Rand Goldfield hosted by the
Witwatersrand Supergroup sediments. The Central Rand Goldfield is situated
Geology
immediately to the south of Johannesburg and has been host to one of the most
extensive gold reserves in the world. The reefs have been mined continuously on
strike for approximately 46km in an east/west direction, bounded by the former
- 12 DRD mine (now West Wits MLI PR) in the west to East Rand Proprietary Mine in
the east. Reefs were mined down-dip, to the south, for about 6km from its outcrop
position, to depths of approximately 3km. Between 1897 and 1984, approximately
9 000 tons of gold were extracted from the Central Rand Goldfield. The reef
horizons are channelised conglomerates. The major orebodies mined in the
Central Rand Goldfield are the Main Reef, Main Reef Leader, South Reef, Bird reefs
and Kimberley reefs. The White Reef is the lowermost, gold bearing reef of the
predominantly uranium bearing Bird reefs.
•
Boreholes BR121 to BR123 were drilled at -60° perpendicular with the strike of the
known Bird Reef outcrop. The holes were drilled by the contracted drilling
company Professional Drilling Services (PDS). PDS utilised a XY44 spindle drive rig,
Drill hole
with a wire line core recovery system. The holes were drilled NQ size, which
Information
resulted in 75.6 mm diameter holes from which 47.6 mm diameter core was
obtained
•
See Appendix 1
•
Weighting was conducted against relative sample lengths due to similar waste and
ore bulk densities. Minimum grades were dependent on laboratory detection
limits (0.001 ppm gold and 2ppm U3O8). No cutting of low and high grade samples
Data
aggregation
methods
was performed.
•
No allowance was made to differentiate between short lengths of high grade
results and longer lengths of low grade results. However, minimum sample lengths
were not less than 10cm.
Relationship
•
Metal equivalent values were not applicable.
•
All down hole lengths were converted to true widths by correcting for the dip of
between
the strata.
mineralisation
widths and
intercept
lengths
Diagrams
•
See Report - Figures 1 and 2.
Balanced
•
Exploration Results for all three boreholes BR121-BR123 were reported.
reporting
o
Geology of reef intercepts were noted in detail on standardised logging sheets.
Other
o
Geophysical and geochemical survey results were not conducted. .
substantive
o
Bulk samples were not conducted.
exploration
o
Bulk density was measured for each sample utilising the Archimedes principles.
data
o
Groundwater intersections were measured in litres per hour.
o
Geotechnical and rock characteristics were noted during logging.
- 13 o
Deleterious or contaminating substances such as methane were not
encountered.
•
Further work
Previous drilling conducted by West Wits MLI in 2008 targeted the uranium
bearing reefs overlying the White Reef. Several historic holes could be
extended to the gold bearing White Reef to provide additional reef
intersections –Figure 4.
Appendix 1 Drillhole information
Borehole Latitude
Longitude
ID
Elevation
Dip
Azimuth
(MAMSL)
Interception
Hole
Depth (m)
Length
(m)
BR121
26.177482 S
27.873143 E
1750
-60.00
20.00
89.74
129.80
BR122
26.175246 S
27.865047 E
1752
-60.69
20.02
114.91
120.00
BR123
26.176773 S
27.867678 E
1750
-58.51
20.37
115.31
124.10