Quarterly Activities and Cashflow Report
Released
Released
Announcement PDF
ASX: WWI
ASX Announcement and Media Release
www.westwitsmining.com
Friday, 29 January 2016
Fast Facts
Capital Structure:
Shares on issue
Options
Market Cap
Cash in Bank
Debt
Enterprise Value (EV)
EV/oz
@ 29 Jan 2016
456 million
62 million
$11 million
A$1.5 million
Nil
A$9.5million
A$6.90
Company Directors & Management
Michael Quinert
Chairman
Vin Savage
Executive Director
Neil Pretorius
Non-Exec Director
Hulme Scholes
Non-Exec Director
Top Shareholders ≈
Twynam Ag
DRD Gold Ltd
QMM Pty Ltd
Trevor Neale
Top 40 Shareholders
Quarterly Activities Report
Review of Operations
West Wits Mining Limited (ASX:WWI) (“the Company” or “West Wits”) during the
quarter experienced mixed outcomes with respect to progress at its Derewo River
Gold Project, Papua Province, Indonesia (“Derewo”) and its Soweto Cluster Gold
Project, Johannesburg, South Africa (“Soweto Cluster”). At Derewo the Company has
experienced further delays with respect to commissioning its alluvial circuit, however
at the Soweto Cluster the Company released a 1.218m oz JORC resource which is a
19.9%
11%
8%
6%
74%
Company Highlights
• South Africa
o near surface and underground targets
o 1.217m oz JORC resource
Measures: 302,000
Indicated: 566,200
Inferred: 349,400
o Historic estimate of 12.8m oz at 4.6g/t
o 31.8m ozs Au produced historically
significant milestone for the Company.
South Africa
Soweto Cluster Gold Project, Central Rand (WWI: 76%)
Post balance date West Wits announced an Updated Mineral Resource Estimate for
the Soweto Cluster under the JORC 2012 Code (WWI ASX release 22 Jan 2016
Competent Person Hermanus Swart). The new estimate was based on a detailed
technical review completed on the extensive database generated by the previous
leaseholders, Durban Roodepoort Deep Limited (“DRD”). This database formed the
basis of the previous Mineral Resources Estimate (under an earlier version of the JORC
code) released by DRD to the ASX in 2000 (refer WWI ASX release 28 August 2015).
Importantly the new Mineral Resource Estimate is derived from the historic DRD
• Indonesia
o High grade placer deposit
o Project show early stage similarities
with discoveries inc; Porgera, Edie
Creek, Wau
o Independent geologists believe source
of nuggets likely to be local, based on
the size and shape of the nuggets
discovered
resource but only includes ounces to a 400m depth from surface and does not include
deep underground material previously considered in the DRD estimation. The chosen
headline cut-off grade of 2.0 g/t is based on historic figures and should ensure that
the bulk of the resources can be reasonably expected to be exploited.
Mineral Resource Statement
Contact Details
West Wits Mining Limited
ACN 124 894 060
Suite 1, 1233 High Street
Armadale VIC 3143
T: +61 3 8692 9049
F: +61 3 8692 9040
E: info@westwitsmining.com
W: www.westwitsmining.com
Category
Measured
Indicated
Measured & Indicated
Tonnes (kT)
2,214
5,317
7,531
Grade g/t Au
4.25
3.31
3.59
Ounces Au
302,300
566,400
868,700
Inferred
3,452
3.15
350,000
Total
1,098
3.45
1,218,700
Table 1. Updated Mineral Resource estimate for the Soweto Cluster at a 2.0 g/t cut-off. Number
differences may occur due to rounding errors. The Global Mineral Resource statement at a range of
cut-off grades and listed separately for each of the seven target reefs is presented in Table 2.
The Company is not aware of any new information or data that materially affects the information
included in the announcement and confirms that all material assumptions and technical parameters
underpinning the estimates above continue to apply and have not materially changed. The form and
context in which the Competent Persons findings are presented have not materially changed.
Furthermore there are also additional areas of interest identified by the Company that sit outside the announced the
JORC resource. Some of these areas of interest formed part of the previously announced Exploration Target but were
not taken into the original DRD Mineral Resource Estimate due to the presence of mine infrastructure on the surface and
crown pillars. These old mills have been removed and many crown pillars are largely redundant due to the resource limit
of 400m depth in these areas.
In addition, the Company is in the process of an assessment of the historic Bird Reef data base and the exploration
previously undertaken by WWI (2008 and 2015) and have delineated a substantial zone of unclassified target
mineralisation in a previously unmined area that is excluded from the JORC resource or Exploration Target. We expect
the results of this study to be available shortly.
Cut-Off
(g/t) Au
1.0 g/t
2.0 g/t
3.0 g/t
4.0 g/t
Reef
Bird
K9B
K9T
Leader
Main
South
VCR
Total
Bird
K9B
K9T
Leader
Main
South
VCR
Total
Bird
K9B
K9T
Leader
Main
South
VCR
Total
Bird
K9B
K9T
Leader
Main
South
VCR
Total
Measured
Grade Au Total Au
Tonnes
(g/t)
(Oz)
(kt)
843
3.34
90,600
47
3.74
5,700
69
3.74
8,300
72
4.12
9,500
1,067
4.40 151,000
193
6.58
40,900
2,290
4.16 306,000
794
3.45
88,200
47
3.74
5,700
69
3.74
8,300
70
4.16
9,400
1,041
4.48 149,800
193
6.58
40,900
2,214
4.25 302,300
505
3.95
64,100
44
3.79
5,400
48
4.14
6,400
65
4.26
8,900
791
5.08 129,200
176
6.96
39,500
1,629
4.84 253,500
176
4.75
26,900
14
4.36
1,900
24
4.54
3,500
33
5.13
5,400
644
5.44 112,700
141
7.83
35,400
1,031
5.61 185,800
Indicated
Tonnes Grade Au Total Au
(kt)
(g/t)
(Oz)
4,915
2.69
425,100
129
3.82
15,800
27
8.00
7,000
71
3.51
8,000
1,451
3.75
174,800
49
2.01
3,200
6,642
2.97
633,900
3,658
3.07
361,600
129
3.82
15,800
27
8.00
7,000
71
3.51
8,000
1,383
3.84
170,800
49
2.01
3,200
5,317
3.31
566,400
1,635
3.78
198,700
129
3.82
15,800
27
8.00
7,000
57
3.78
6,900
1,029
4.29
142,000
0.00
0.00
2,877
4.01
370,400
519
4.48
74,800
28
4.45
4,000
27
8.00
7,000
18
4.37
2,500
497
5.10
81,500
1,089
4.85
169,800
Inferred
Tonnes Grade Au Total Au
(kt)
(g/t)
(Oz)
2,245
2.23 161,000
224
4.18
30,100
94
3.64
11,000
844
3.57
96,900
6
4.11
800
1,182
2.85 108,300
4,595
2.76 408,100
1,132
2.88 104,700
224
4.18
30,100
94
3.64
11,000
814
3.64
95,100
6
4.11
800
1,182
2.85 108,300
3,452
3.15 350,000
455
3.61
52,800
224
4.18
30,100
48
4.34
6,700
670
3.83
82,600
6
4.11
800
1,403
3.84 173,000
3
4.66
400
155
4.35
21,600
33
4.78
5,000
176
5.16
29,200
6
4.11
800
372
4.77
57,000
Table 2: Global Mineral Resource Estimation shown for Measured, Indicated and Inferred categories and by reef
The Company is not aware of any new information or data that materially affects the information included in the
announcement and confirms that all material assumptions and technical parameters underpinning the estimates
above continue to apply and have not materially changed. The form and context in which the Competent Persons
findings are presented have not materially changed.
Figure 1. Location of main auriferous lodes within the Soweto Cluster. The black boundary marks the extent of the WWI tenements in
the area. The outcrops of the major reefs are shown. All reefs dip approximately 25° to 30° to the south.
Figure 2. The mines of the Central Rand Goldfield. West Wits Soweto cluster comprises two historic leases, namely the DRD lease and
Rand Leases. A sample of the quartz pebble conglomerate from the Main Reef is shown in the top right.
Figure 3. Geology of the Central Rand Goldfield underlying the Soweto Cluster lease.
Sampling, data and analysis
The sampling data used in the Mineral Resource Estimate comes solely from the underground workings. Diamond drilling
was extensively utilised during previous mining history of the area but its use was confined to defining the spatial location
of the reefs and the down hole assays were not included in the resource calculations. For further background on sampling
and data techniques used please refer to the Company’s ASX release on 22 January 2016.
Ongoing Exploration of Initial Targets
During the quarter West Wits began its first drilling program at the Soweto Cluster since 2010. Through the Company’s
extensive data review, which generated West Wits’ previously released Exploration Target, 17 priority targets were
identified. It is the Company’s intention to test each of these targets over 2016.
The first Target tested during the last quarter is known as the Circular Shaft project. The program included 3 drill holes
for an aggregate 450m. The drilling program was designed to test an unmined section of the Bird Reef located at the
Circular Shaft down to a maximum vertical depth of 125m. Assay results were delayed a number of weeks due to delays
experienced at the lab. It is expected these results will be released shortly.
West Wits is currently completing its second program at the Number 11 Shaft project. This program consists of 14 holes
of which the Company is currently completed 8 holes.
Circular Shaft Project
This program has been designed to test for the existence of a displaced extension of the known Bird Reef payshoot which
was extensively and successfully mined by the former operator at Rand Leases. The recent work completed under the
technical review indicated the likely existence of an extension to the payshoot.
The Exploration Target for the Circular Shaft Project was announced as “Drilling Commenced in South Africa” : (WWI:
ASX Release 23 November 2015 Competent Person Dr Andrew Tunks).
Exploration Target for the Circular Shaft Project
Category
Tonnes (million)
Grade g/t
Ounces Au
Low range
1.5
3.0
130,000
Upper Range
3.0
6.0
540,000
Table 3: The Exploration Target is stated as ranges of potential tonnes and grades. Number differences may occur due to rounding
errors. The potential quantity and grade is conceptual in nature, there has been insufficient exploration and evaluation of historical
resources to estimate a Mineral Resource. It is uncertain if further exploration will result in the estimation of a Mineral Resource.
The Company is not aware of any new information or data that materially affects the information included in the announcement of the above
Exploration Target. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially
modified.
The 3 drill holes were placed between previous drill holes completed by the Company, which will result in a 200m grid
spacing. The program has been designed to enable the potential for delineation of an inferred category resource. The
holes are being drilled at 60 degrees to intersect the reef approximately 125m vertical depth. The drilling program
targeted the Middle, Monarch and Upper Monarch reefs that are also known for uranium mineralisation.
Number 11 Shaft Project
This target is a significant unmined portion of the Bird Reef that is centred around the existing underground infrastructure
known as the Number 11 Shaft Project on the Rand Leases at the Eastern portion of the Soweto Cluster. Currently 8 of
the 14 holes at Number 11 shaft have been completed. To date the various parts of the Bird reef have been intersected
as expected with relevant sections split and submitted for assay.
The target is approx. 1000m in strike length and focusses on where the Bird Reef outcrops at surface. This target was left
unmined as a crown pillar due to significant surface infrastructure that was present at the time. The number 11 Shaft
was closed down in the fourth quarter of 1998 (DRD Annual Report 1999) and there has been no further production from
the Bird Reef since this time.
A detailed evaluation of historical underground mining and sampling plans from the production history along the Bird
Reef in this area has resulted in the formulation of an Exploration Target for ore remaining in the crown pillar centred on
the No. 11 Shaft. This was announced as Exploration Targets, South Africa – “The Number 11 Shaft” Project (WWI: ASX
release 13 October 2015 Competent Person Dr Andrew Tunks).
Exploration Target for the No. 11 Shaft Project
Category
Tonnes Thousands
Grade g/t
Ounces Au
Low range
600
4.5
85,000
Upper Range
700
6.0
140,000
Table 4: The Exploration Target is stated as ranges of potential tonnes and grades. Number differences may occur due to rounding
errors. The potential quantity and grade is conceptual in nature, there has been insufficient exploration and evaluation of historical
resources to estimate a Mineral Resource. It is uncertain if further exploration will result in the estimation of a Mineral Resource.
The Company is not aware of any new information or data that materially affects the information included in the announcement of the above
Exploration Target. The Company confirms that the form and context in which the Competent Persons findings are presented have not been materially
modified.
Next Steps
In addition to both these initial near surface projects the Company is continuing to assess and develop programs for
further near surface projects. The Company is excited by the data being developed at its South African projects and looks
forward to updating the market further as results are received.
Indonesia
Alluvial Gold Project, Papua Province (WWI:50%)
On 12 January 2016 West Wits announced that equipment at its Derewo River alluvial project in Papua Province,
Indonesia had been damaged. The damage was intentionally caused through persons setting fire to the Company’s CAT
320d excavator.
Since the incident the Company has completed an assessment of the damage which has determined the excavator can
be repaired. The preliminary estimate for repair costs is between $70,000 - $100,000 and the time taken to effect repairs
would delay full commissioning of the circuit by up to 2 months. The fire caused only limited damage to the boom,
undercarriage, track and swing mechanism but more extensive damage to the cabin, hydraulics and engine
compartment. West Wits is currently considering its pathway forward which includes assessing options to source second
hand parts as well as new parts.
The Company has recently met with its local partner to be briefed on the failure of security arrangements at site. Whilst
local police and private security was in place at the time this was clearly inadequate to deal with the attack. The local
partner has reaffirmed its commitment to the project and is currently preparing a revised security strategy for site. The
Company has again re-iterated that any solution must include plans for complete removal of the illegal mining
population. Further meetings are being held in the coming days with the Company’s local partner. These meetings are
to finalise arrangements for ongoing security as well as the removal of the illegal population. The Company will further
update the market on its plans with respect to Derewo in due course.
This interruption is disappointing given the Company was poised to begin full commissioning of its initial alluvial circuit.
Prior to this interruption the Company had made excellent progress at the alluvial site having completed the planned trial
mining phase. This work has provided invaluable insight in how best to process the alluvial gravels within the 81 creek
and the Company remains confident it can establish a successful operation subject to security arrangement being agreed
and implemented.
For And On Behalf Of The Board
Michael Quinert
Chairman
West Wits Mining Limited
Interests in Mining Tenements
Tenements
GP183PR
Location
Held at end of
Acquired during the
Disposed during the
Quarter
quarter
quarter
76%*
-
-
Paniai Regency, Indonesia
50%*
-
-
Paniai , Indonesia
80%*
-
-
Intan Jaya, Indonesia
80%*
-
-
Nabire, Indonesia
80%*
-
-
Underground rights - Soweto Cluster, West
Rand, South Africa **
Production IUP – NO.
47/2010
Exploration IUP – NO.
76/2010
Exploration IUP –
NO.31/2010
Exploration IUP – NO.
543/142/SET
*Minority positions are held by local parties in compliance with local legislation in relation to foreign ownership and
mineral and production rights.
** Rights are subject to an appeal for reinstatement
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Rule 5.5
Appendix 5B
Mining exploration entity and oil and gas exploration entity
quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/2013
Name of entity
WEST WITS MINING LIMITED (ASX: WWI)
ABN
Quarter ended (“current quarter”)
89 124 894 060
31 December 2015
Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
1.3
1.4
Dividends received
Interest and other items of a similar nature
received
Interest and other costs of finance paid
Income taxes paid
Other (provide details if material)
1.5
1.6
1.7
(a) exploration & evaluation
(b) development
(c) production
(d) administration
Net Operating Cash Flows
1.8
1.9
1.10
1.11
1.12
1.13
Cash flows related to investing activities
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
Loans to other entities
Loans repaid by other entities
Prospect sale proceeds to BEE partner
Net investing cash flows
Total operating and investing cash flows
(carried forward)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 1 of 6
Current quarter
$A’000
Year to date
(6 months)
$A’000
-
-
(283)
(345)
(419)
(454)
-
-
3
3
-
-
(625)
(870)
-
-
(625)
(870)
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Current quarter
$A’000
1.13
1.14
1.15
1.16
1.17
1.18
1.19
Total operating and investing cash flows
(brought forward)
Cash flows related to financing activities
Proceeds from issues of shares, options, etc.
Proceeds from sale of forfeited shares
Proceeds from borrowings
Repayment of borrowings
Dividends paid
Other (provide details if material)
Net financing cash flows
Year to date
(6 months)
$A’000
(625)
(870)
2,123
63
(151)
2,035
2,123
145
(151)
2,117
1,410
1,247
179
(16)
1,573
345
(19)
1,573
Net increase (decrease) in cash held
1.20
1.21
Cash at beginning of quarter/year to date
Exchange rate adjustments to item 1.20
1.22
Cash at end of quarter
Payments to directors of the entity, associates of the directors, related
entities of the entity and associates of the related entities
Current quarter
$A'000
1.23
Aggregate amount of payments to the parties included in item 1.2
71
1.24
Aggregate amount of loans to the parties included in item 1.10
-
1.25
Explanation necessary for an understanding of the transactions
Salaries, directors’ fees, corporate advisory and consulting fees at normal commercial rates
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on consolidated
assets and liabilities but did not involve cash flows
2.2
Details of outlays made by other entities to establish or increase their share in projects in which the
reporting entity has an interest
+ See chapter 19 for defined terms.
Appendix 5B Page 2 of 6
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
Amount used
$A’000
-
-
-
-
Estimated cash outflows for next quarter
$A’000
4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
75
100
150
325
Total
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as shown
in the consolidated statement of cash flows) to the related
items in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
1,573
179
5.1
Cash on hand and at bank
5.2
Deposits at call
-
-
5.3
Bank overdraft
-
-
5.4
Other (provide details)
-
-
1,573
179
Total: cash at end of quarter (item 1.22)
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 3 of 6
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Changes in interests in mining tenements and petroleum tenements
Tenement
reference
and
location
6.1
6.2
Interests in mining
tenements and petroleum
tenements relinquished,
reduced or lapsed
Interests in mining
tenements and petroleum
tenements acquired or
increased
Nature of interest
(note (2))
Interest at
beginning
of quarter
Interest at
end of
quarter
Nil
Nil
+ See chapter 19 for defined terms.
Appendix 5B Page 4 of 6
01/05/2013
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
Total number
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11
7.12
Preference
+securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks,
redemptions
+Ordinary
securities
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns
of capital, buybacks
+Convertible
debt securities
(description)
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through
securities
matured,
converted
Options
(description and
conversion
factor)
Issued during
quarter
Exercised during
quarter
Expired during
quarter
Debentures
(totals only)
Unsecured
notes (totals
only)
Number
quoted
Issue price per security
(see note 3) (cents)
Amount paid up per
security (see note 3)
(cents)
-
-
-
-
-
-
-
-
-
-
-
-
456,203,370
456,203,370
-
-
139,240,674
139,240,674
-
-
-
-
-
-
-
-
-
-
62,150,000
-
Exercisable @ $0.025 to
$0.030
-
2,000,000
-
Exercisable @ $0.03
-
-
-
-
-
-
-
-
-
-
-
-
-
+ See chapter 19 for defined terms.
01/05/2013 Appendix 5B Page 5 of 6
Appendix 5B
Mining exploration entity and oil and gas exploration entity quarterly report
Compliance statement
1
This statement has been prepared under accounting policies which comply with
accounting standards as defined in the Corporations Act or other standards acceptable
to ASX (see note 5).
2
This statement does give a true and fair view of the matters disclosed.
Date: Friday, 29th January 2016
Sign here:
(Director)
Print name:
Michael Quinert
Notes
1
The quarterly report provides a basis for informing the market how the entity’s
activities have been financed for the past quarter and the effect on its cash position.
An entity wanting to disclose additional information is encouraged to do so, in a note
or notes attached to this report.
2
The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in
mining tenements and petroleum tenements acquired, exercised or lapsed during the
reporting period. If the entity is involved in a joint venture agreement and there are
conditions precedent which will change its percentage interest in a mining tenement
or petroleum tenement, it should disclose the change of percentage interest and
conditions precedent in the list required for items 6.1 and 6.2.
3
Issued and quoted securities The issue price and amount paid up is not required in
items 7.1 and 7.3 for fully paid securities.
4
The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of
Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5
Accounting Standards ASX will accept, for example, the use of International
Financial Reporting Standards for foreign entities. If the standards used do not
address a topic, the Australian standard on that topic (if any) must be complied with.
== == == == ==
+ See chapter 19 for defined terms.
Appendix 5B Page 6 of 6
01/05/2013